Agriculture Extension

CHILD NUTRITION GUIDELINES
MINISTRY OF AGRICULTURE

AGRICULTURAL RESEARCH AND EXTENSION PROJECT-RESEARCH SU-PROJECT.
NARO

UGANDA JOURNAL OF AGRICULTURAL SCIENCES.
BAGUMA, Y.K

REVIEW OF UGANDA COFFEE SUB SECTOR REPORT OF THE TASK FORCE 3 ON COFFEE TRANSPORTATION.
GASHUMBA, C.H; NGATEGIZE, P.K

SOCIAL SCIENTISTS IN AGRICULTURAL RESEARCH.
HORTON, D

POLICIES ON THE CULTIVATION OF VLEIS IN ZIMBABWE AND LOCAL RESISTANCE TO THEIR ENFORCEMENT.
MUKAMURI, B.B

IRRIGATION WATER MANAGEMENT AND THE BUNDALA NATIONAL PARK.
MALA, R; MATSUNO, Y

FORUM FOR AGRICULTURAL RESEARCH IN AFRICA.
MAGHREB, F

THE ENERGY AGRICULTURE CHALLENGE.
HAILU, M

GUIDELINES ON MINIMUM REQUIREMENTS FOR AGRICULTURAL PESTICIDE APPLICATION EQUIPMENT.
WILES, T.L; SHARP, D.G

OECD FAO AGRICULTURAL OUTLOOK 2018-2027.
SALAZAR,L.J

THE TASK GROUP ON AGRICULTURAL EXTENSION STRATEGIC FRAME WORK FINAL REPORT.
ARDCS

AGRICULTURAL STATISTICS; NEEDS ASSESSMENT AND STAKEHOLDERS WORKSHOP.
WORLD BANK

THE NATIONAL AGRICULTURAL RESEARCH POLICY
MUGERWA, K

FRAMEWORK FOR THE DEVELOPMENT OF AGRICULTURAL STATISTICS IN UGANDA.
MUKASA, J.M

STRATEGY OPTIONS FOR HIGHER EDUCATION IN AGRICULTURE EXPERT CONSULTATION.
MAALOUF, W.D

COMPARATIVE ADVANTAGE OF AGRICULTURAL PRODUCTION SYSTEMS AND ITS POLICY IMPLICATIONS IN PAKISTAN.
APPLEYARD, D

RETHINKING PUBLIC POLICY IN AGRICULTURE.
CHANG, H

BUILDING ON THE NEW MOMENTUM IN AFRICAN AGRICULTURE.
ANNAN, K

NAADS IN THE PRESS.
JJUUKO, R

TOWARDS A NATIONAL POLICY AND STRATEGY FOR MARKETING, PROCESSING AND STORAGE OF AGRICULTURAL COMMODITIES IN UGANDA.
AJMAL, M

CELEBRATING DECADES OF COORDINATING COLLABORATIVE AGRICULTURAL RESEARCH FOR DEVELOPMENT.
MBONIGABA, M

AFRICAN AGRICULTURAL TECHNOLOGY FOUNDATION.
GWARAZIMBA, V; BOKANGA, M

ELIMINATING HUNGER; DFID FOOD SECURITY STRATEGY AND PRIORITIES FOR ACTION.
DFID

FORUM FOR AGRICULTURAL RESEARCH IN AFRICA.
MONDIALE, B

MODERN AGRICULTURAL EQUIPMENT COMPANY
ZHONGGUANCUN, S

PESTICIDE APPLICATION EQUIPMENT FOR USE IN AGRICULTURE.
THORNHILL, E.W; MATTHEWS, A

PRODUCING MORE WITH LESS WATER FOR AGRICULTURE.
HAILU, M

AGRICULTURAL EXTENSION, RURAL DEVELOPMENT AND THE FOOD SECURITY CHALLENGE.
RIVERA, W; QAMAR, K
.jpg)
REPORT OF THE SUB COUNTY PLANNING MEETINGS FOR THE SELECTED SUB COUNTIES IN THE MODERNISATION OF AGRICULTURE.
kazibwe, s

FARMING MATTERS SCALING UP AND SUSTAINING THE GAINS.
WALSUM, V

AGRICULTURE RURAL DEVELOPMENT.
CONZE, G

AGRICULTURAL RESEARCH IN INDIA; AN OVERVIEW OF ITS ORGANIZATION, MANAGEMENT AND OPERATIONS.
RANDHAWA, N.S

AGRICULTURAL PESTICIDE SPRAYERS VOLUME 1 FAO GUIDELINES ON EQUIPMENT QUALITY CONTROL AND USE AND FAO MINIMUM STANDARDS.
MILLER, P.C

AGRICULTURAL PESTICIDE SPRAYERS VOLUME 2 FAO TECHNICAL STANDARDS; SPRAYER SPECIFICATIONS AND TEST PROCEDURES.
MILLER,C.H

TECHNICAL DISCUSSION ON AGRICULTURAL MACHINERY REHABILITATION PROGRAMMES.
LESTER, T

MUKONO AGRICULTURAL RESEARCH AND DEVELOPMENT INSTITUTE NEWS LETTER.
LUSEMBO, P

CITRUS PRODUCTION COMPLEMENTARY NOTES FOR EXTENSION WORKERS.
TIMMER, L.W; HERBERT, D.B

APPROPRIATE TECHNOLOGY INCORPORATING AGRICULTURE AND EQUIPMENT INTERNATIONAL.
ISSAKOV, A; DIXON, D

DEVELOPING AFRICA THROUGH SCIENCE, TECHNOLOGY AND INNOVATIONS IN AGRICULTURE.
BEMIGISHA, J; KYOMUKAMA, M

HOW CAN AFRICAN AGRICULTURE ADAPT TO CLIMATE CHANGE.
RINGLER, C; BRYAN, E

GUIDELINES FOR PARTICIPATION OF NON PARI SERVICE PROVIDERS IN AGRICULTURAL RESEARCH.
NARS
.jpg)
AGRICULTURE IN THE NEWS JANUARY TO APRIL 1994.
KAGANDA, S

STRATEGIES FOR SUSTAINABLE ANIMAL AGRICULTURE IN DEVELOPING COUNTRIES.
MACK, S

AFRICAN CROP SCIENCE CONFERENCE PROCEEDINGS.
ADIPALA, E

YIELD GAPS AND POTENTIAL AGRICULTURAL GROWTH IN WEST AND CENTRAL AFRICA.
JOHNSON, M; CHAMBERLIN, J
.jpg)
ENGENDERING AGRICULTURAL RESEARCH, DEVELOPMENT AND EXTENSION.
MEINZEN, R; BEHRMAN, J; WILDE, V

DIRECTORY FOR AFRICAN AGRICULTURAL RESEARCH 2001.
KEMSLEY, E.J

YIELD GAPS AND POTENTIAL AGRICULTURAL GROWTH IN WEST AND CENTRAL AFRICA.
ALEJANDRO, N; EDUARDO, M

LVBC SHARED VISION AND STRATEGY FRAMEWORK FOR MANAGEMENT AND DEVELOPMENT OF LAKE VICTORIA BASIN.
OKURUT, O.T

RECONSTRUCTING AGRICULTURE IN AFGHANISTAN.
PAIN, A; JACKY, S

AGRICULTURAL RESEARCH IN AFRICA INVESTING IN FUTURE HARVESTS.
LYNAM, J; BEINTEMA, N; BODIANE, O

AGRICULTURAL INNOVATIONS FOR SUSTAINABLE DEVELOPMENT; CONTRIBUTION FROM THE FINALISTS OF THE AFRICAN WOMEN IN SCIENCE COMPETITION.
KEVIN, U; MOMANYI, M; OZOR, N

FARMER FIRST REVISITED; INNOVATION FOR AGRICULTURAL RESEARCH AND DEVELOPMENT.
SCOONES, I; THOMPSON, J

BLUE FARM MANAGEMENT CERTIFICATE COURSE.
MUGERWA, K.W

FAO ETHICS SERIES 1; ETHICAL ISSUES IN FOOD AND AGRICULTURE,
JACQUES, D

INSTITUTIONS AND THE AFRICAN FARMER.
EICHER, K.C

CONSULTATIVE GROUP ON INTERNATIONAL AGRICULTURAL RESEARCH TECHNICAL ADVISORY COMMITTEE; ENVIRONMENTAL IMPACTS OF THE CGIAR AN INITIAL ASSESSMENT.
GREGERSEN, H

WORLD AGRICULTURE; TOWARDS 2015-30 AN FAO PERSPECTIVE.
BRUINSMA, J

MEDIUM TERM PROSPECTS FOR AGRICULTURAL COMMODITIES PROJECTIONS TO THE YEAR 2005.
FAO

GLOBAL AGRO-ECOLOGICAL ASSESSMENT FOR AGRICULTURE IN THE 21ST CENTURY.
FISCHER,G; MAHENDRA, S; HARRIJ, V.V

AGRICULTURAL INNOVATIONS FOR SUSTAINABLE DEVELOPMENT; CONTRIBUTION FROM THE FINALISTS OF THE AFRICAN YOUTH IN SCIENCE COMPETITION.
KEVIN, U; FRANCIS, J; MANNERS, G

FUTURE CHALLENGES AND OPPORTUNITIES FOR AGRICULTURAL R&D IN THE SEMI-ARID TROPICS.
SPENCER, D.C;RYAN,J.G

IDENTIFICATION AND FORMULATION STUDY FOR SUPPORT FOR PRIORITY AGRICULTURAL RESEARCH AND DISSEMINATION TO CONTRIBUTE TO UGANDA,S PLAN FOR THE MODERNISATION OF AGRICULTURE.
NARO

WETLANDS AND THE LAW; LEGISLATION GOVERNING THE OWNERSHIP, USE AND ACCESS TO WETLANDS AND THEIR RESOURCES.
WAMALA,L; NABUGABO,L

STRUCTURAL ADJUSTMENT THE AFRICAN FARMER.
DUNCAN, A; HOWELL, J

BEYOND FARMER FIRST;RURAL PEOPLES KNOWLEDGE,AGRICULTURAL RESEARCH AND EXTENSION PRACTICE.
SCOONES, I;THOMPSON, J

LOCALLY MANAGED IRRIGATION SYSTEMS; ESSENTIAL TASKS AND IMPLICATION FOR ASSISTANCE, MANAGEMENT TRANSFER AND TURNOVER PROGRAMS.
YODER,R

FACTS AND FIGURES OF THE AGRICULTURAL SECTOR -2007
AGRICULTURAL PLANNING DEPARTMENT

INNOVATION IN DOMESTIC FUEL; FROM WOOD TO MATOOKE PEELS.
KABAGAJU, D; MIREMBE, M; MUSOKE, R
Animal Culture

Infectious Tropical Diseases of Domestic Animalscccc
George J. Lososcccc

EDIBLE HORTICULTURAL CROPS
COROLANE, J

A REVIEW OF THE STATUS OF BOVINE SPONGIFORM ENCEPHALOPATHY IN LIVESTOCK RELATION TO THE USE OF CATTLE SEMEN IN REPRODUCTION/ BREEDING.
SEMAMBO, D.K.N; HASHAKIMANA, K.G

ANIMAL GENETIC RESOURCES DATA BANKS.
FAO

RESIDUES OF SOME DRUGS IN ANIMALS AND FOODS.
FAO

THE PRZEWALSKI HORSE AND RESTORATION TO ITS NATURAL HABITAT IN MONGOLIA.
ERNEST, L.K

GUIDELINES FOR SLAUGHTERING, MEAT CUTTING AND FURTHER PROCESSING.
WATSON, S

ANIMAL ENERGY IN AGRICULTURE IN AFRICA AND ASIA.
DRENDAHL, S; SMITH, A.J

GENETIC IMPROVEMENT OF HAIR SHEEP IN THE TROPICS.
PONZONI, W.R

ANIMAL GENETIC RESOURCES OF THE USSR
DMITRIEV, N.G; ERNST, L.K

PROLIFIC TROPICAL SHEEP.
MASON, I.I

ANIMAL GENETIC RESOURCES STRATEGIES FOR IMPROVED USE AND CONSERVATION.
HODGES, J

OLIVE BY-PRODUCTS FOR ANIMAL FEED.
SANSOUCY, R

THE MANAGEMENT OF GLOBAL ANIMAL GENETIC RESOURCES.
HODGES, J

GENETIC IMPROVEMENT OF HAIR SHEEP IN THE TROPICS.
PONZONI, W.R

ANIMAL GENETIC RESOURCES A GLOBAL PROGRAMME FOR SUSTAINABLE DEVELOPMENT.
WIENER, G

THE TECHNOLOGY OF MAKING CHEESE FROM CAMEL MILK.
RAMET, J.P

ANIMAL GENETIC RESOURCES CONSERVATION BY MANAGEMENT DATA BANKS AND TRAINING.
GRIFFITHS, R.B

ANIMAL GENETIC RESOURCES DATA BANK
FAO

ANIMAL GENETIC RESOURCES STRATEGIES FOR IMPROVED USE AND CONSERVATION.
HODGES, J

MANUAL ON AFRICAN SWINE FEVER FOR PIG PRODUCERS.
MAAIF

EPIDEMIOLOGY DIAGNOSIS AND CONTROL OF POULTRY PARASITES.
ANDERS, P; HANSEN, J.W

ANNALS OF THE DITSONG NATIONAL MUSEUM OF NATURAL HISTORY VOLUME 3 FEBRUARY 2013.
KRUGER, M; DIPPENAAR, N.J

RECOGNIZING AFRICAN SWINE FEVER; A FIELD MANUAL
RWEYEMAMU, M.M

TECHNOLOGY TRANSFER; MULTI-PURPOSE COWS FOR MILK, MEAT AND TRACTION IN SMALLHOLDER FARMING SYSTEMS; PROCEEDINGS OF AN EXPERT CONSULTATION HELD AT ILRI, ADDIS ABABA, ETHIOPIA 11-14 SEPTEMBER 1995.
SHAPIRO, B.I; ZERBINI, E; CHIRGWIN, J.C
Animal Production

MANAGEMENT MANUAL FOR PRODUCTIVE R AND D SCIENTIFIC, TECHNICAL AND MANAGEMENT INFORMATION SYSTEMS.
KAMAU, I.N

REPORT OF THE EXPERT CONSULTATION ON BEST PRACTICES FOR SAFETY AT SEA IN THE FISHERIES SECTOR.
VALDIMARSSON, G

FAO ANIMAL PRODUCTION AND HEALTH
ROLLEFSON, K

FAO FISHERY STATISTICS 1999
FAO

ANIMAL GENETIC RESOURCES INFORMATION.
RODRIGUEZ, T.C; KERVEN, C

ANIMAL GENETIC RESOURCES INFORMATION.
PADMAJA, M

PREPARATION OF AFRICAN SWINE FEVER CONTINGENCY PLANS.
PENRITH, M; GUBERT, V

PREPARATION OF CONTAGIOUS BOVINE PLEUROPNEUMONIA CONTINGENCY PLANS.
GEERING, A.W; AMANFU, W

MEAT PRODUCTION MASTER PLAN STUDY.
FINTECS, C

ANIMAL BREEDING CENTRE BULL CATALOGUE 1997
RODEN, V

SUSTAINABLE ANIMAL PRODUCTION FROM SMALL FARM SYSTEMS IN SOUTH EAST ASIA.
DEVENDRA, C

EDIBLE BY PRODUCTS OF SLAUGHTER ANIMALS.
MARTINEZ, L; KOCH, H

MANUAL ON SIMPLE METHODS OF MEAT PRESERVATION.
OBANU, Z; MARINKOV, M

EDIBLE BY PRODUCTS OF SLAUGHTER ANIMALS.
FORNIAS, V; ROBLES, A

SUSTAINABLE ANIMAL PRODUCTION FROM SMALL FARM SYSTEMS IN SOUTH EAST AFRICA.
DEVENDRA, C

ECHINOCOCCOSIS/ HYDATIDOSIS SURVEILLANCE, PREVENTION AND CONTROL.
GRINDLE, R

THE AWASSI SHEEP WITH SPECIAL REFERENCE TO THE IMPROVED DAIRY TYPE.
SONMEZ, R; AKTAS, B.C

THE TECHNOLOGY OF MAKING CHEESE FROM CAMEL MILK.
RAMET, J.P

GOOD PRACTICES IN PLANNING MANAGEMENT OF INTEGRATED COMMERCIAL POULTRY PRODUCTION IN SOUTH ASIA
PRABAKARAN, R;

PACKAGING, STORAGE AND DISTRIBUTION OF PROCESSED MILK.
HALL, H.S

GUIDELINE FOR DAIRY ACCOUNTING.
FAGARD, P

ANIMAL GENETIC RESOURCES A GLOBAL PROGRAMME FOR SUSTAINABLE DEVELOPMENT.
WIENER, G

EX SITU CRYOCONSERVATION OF GENOMES AND GENES OF ENDANGERED CATTLE BREEDS BY MEANS OF MODERN BIOTECHNOLOGICAL METHODS.
BREM, G; BRENIG, B

THE MANAGEMENT OF GLOBAL ANIMAL GENETIC RESOURCES.
HODGES, J

OLIVE BY PRODUCTS FOR ANIMAL FEED
SANSOUCY, R; NEFZAOUI, A; ALIBES, X

GOOD PRACTICES IN PLANNING AND MANAGEMENT OF INTEGRATED COMMERCIAL POULTRY PRODUCTION IN SOUTH ASIA,
PRABAKARAN, R

CONSTRUCTION AND OPERATION OF MEDIUM SIZED ABATTOIRS IN DEVELOPING COUNTRIES.
FREDERICK, V

CROP RESIDUES AND AGRO-INDUSTRIAL BY PRODUCTS IN ANIMAL FEEDING
BARREVELD, W.H

ANIMAL GENETIC RESOURCES DATA BANKS.
JOHSON, S.A; NANDA, K

HORMONES IN ANIMAL PRODUCTION.
FERRANDO, R

DISEASE CONTROL IN SEMEN AND EMBRYOS.
BARLETT, D.E; SINGH, C.M

OPEN YARD HOUSING FOR YOUNG CATTLE.
SANSOUCY, R; HALL, J.M

FOOD LOSSES DUE TO NON-INFECTIOUS AND PRODUCTION DISEASES IN DEVELOPING COUNTRIES.
CUNNINGHAM, E.P

ECHINOCOCCOSIS/HYDATIDOSIS SURVEILLANCE, PREVENTION AND CONTROL;
ECKERT, J; SOULSBY, E.J

MANUAL FOR THE PRODUCTION OF MAREKS DISEASE, GUMBORO DISEASE AND INACTIVATED NEWCASTLE DISEASE VACCINES.
PALYA, V

GUIDELINES FOR SLAUGHTERING, MEAT CUTTING AND FURTHER PROCESSING.
CUCUBALUS, S; GRAECIZANS, L

HAEMORRHAGIC SEPTICAEMIA.
BAIN, RVS; CARTER, G.R

MANUAL N SIMPLE METHODS OF MEAT PRESERVATION.
HEINZ, G

TRYPANOTOLERANT CATTLE AND LIVESTOCK DEVELOPMENT IN WEST AND CENTRAL AFRICA VOL. 2
SHAW, A.P

ANIMAL ENERGY IN AGRICULTURE IN AFRICA AND ASIA.
MATHERS, J.C; UZUREAU, C.P

ADDING VALUE TO LIVESTOCK DIVERSITY.
MATHIAS, E; MUNDY, P

EPIDEMIOLOGY, DIAGNOSIS AND CONTROL OF HELMINTH PARASITES OF SWINE.
ROEPSTORFF, A; NANSEN, P
Annual Reports

CONSULTATIVE GROUP ON INTERNATIONAL AGRICULTURAL RESEARCH
Ismail Serageldin

RURAL DEVELOPMENT ADMINISTRATION REPUBLIC OF KOREA ANNUAL RESEARCH REPORT 1987
Chung Yun Park, phd

MINISTRY OF ENERGY AND MINERAL DEVELOPMENT ANNUAL REPORT 2000
Syda N.M. Bbumba (Mrs)

THE ROCKEFELLER FOUNDATION ANNUAL REPORT
Peter C. Goldmark Jr.

BASIC CONCEPTS OF PLANT BREEDING
Tenywa J.S., mUTETIKKA d., Tenywa M., Adipala E., Semana A.,

ANNUAL REPORT 1987
Ahmad Farouk bin Hj S.M. Ishak

INTERNATIONAL INSTITUTE FOR LAND RECLAMATION AND IMPROVEMENT
C.A. de Vries, C.J. Brouwer and L.F. Abell, S. Raadsma and G. Schrale

TECHNICAL CENTRE FOR AGRICULTURAL AND RURAL COOPERATION ANNUAL REPORT 1998
Cta

THE ROCKEFELLER FOUNDATION ANNUAL REPORT 1994
Will and Deni Mclntyre

MAURITIUS SUGAR INDUSTRY RESEARCH INSTITUTE ANNUAL REPORT 1999
Msiri

FROM PLAN TO MARKET WORLD DEVELOPMENT REPORT 1996
World bank

LINTMARKETING BOARD ANNUAL REPORT 1957-1962
Mr. C.C. Spencer, C.M.G

UGANDA NATIONAL BEAN PROGRAMME ANNUAL REPORT 1989
T. Sengooba

KENYA AGRICULTURAL RESEARCH INSTITUTE ANNUAL REPORT 1999
Ayemba JA, Theuri J, Mwariri M.

INTERNATIONAL INSTITUTE FOR LAND RECLAMATION AND IMPROVEMENT/ILRI ANNUAL REPORT 1986
Ir M.J.H.P Pinkers

TECHNICAL CENTRE FOR AGRICULTURAL ABD RURAL COOPERATION ANNUAL REPORT 2001
Cta

ANNUAL REPORT 2004
Carl B. Greendge

ANNUAL REPORT AND ACCOUNTS 1990-91
Nri

ANNUAL REPORT 1945-1946 OF DEPARTMENT OF THE AGRICULTURE
Ugana Protectorate

IIBC ANNUAL REPORT 1990
Iibc

ANNUAL REPORT 1963-64 OF THE MINISTRY OF AGRICULTURE ON NORTHERN NIGERIA
Nigeria

FACULTY OF AGRICULTURE AND FORESTRY
Secretatriat, MUK

IMPROVING WATER AND LAND RESOURCES MANAGEMENT FOR FOOD, LIVELIHOODS AND NATURE ANNUAL REPORT 2000-2001
Sarah Carriger, IWMI

NATIONAL DAIRY COUNCIL
D.W. Atkinson

ANNUAL REPORT 2022-2023
NARO

ANNUAL REPORT 2022-2023
NARO

THE ROCKEFELLER FOUNDATION annaul report 1990
Atlanta, Georgia

AUSTRALIAN CENTRE FOR INTERNATIONAL AGRICULTURAL RESEARCH ANNUAL REPORT
R.G Garnaut

WORLD DEVELOMENT REPORT
JAMES D. WOLFENSOHN

HUMAN DEVELOPMENT REPORT 1993
Bruce Ross-Larson, Katrina van Duyun, Aliso Strong

PAN AFRICAN RINDERPEST COMPAIGN (PARC) ANNUAL REPORT 1991
Dr. P. Rossiter

ANNNUAL REPORT 1995 AND RESEARCH HIGHLIGHTS
Tenywa J. S., Mutetikka D, Tenywa M, Adipala E. Semana A. R, Silver M

WECARD/CORAF ANNUAL REPORT 2000
Adama Traore, Mali Ndiaga Mbaye, Marcel Nwalozie

UGANDA NATIONAL BUREAU OF STANDARDS ANNUAL REPORT 2001
Unbs

A DIFFERENT A DIFFERENT APPROACH TO RURAL POVERTY ALLEVIATION ANNUAL REPORT 2002
Moise Christophe Mensah

INTERNATIONAL IRRIGATION MANAGEMENT INSTITUTE ANNUAL REPORT 1991
Zakia Azam

INTERNATIONAL IRRIGATION MANAGEMENT ANNUAL REPORT 1993
Prof Hikaru Tsutsui

LWS UGANDA ANNUAL REPORT 1985
Joseph Ikalur

TROPICAL PESTICIDES RESEARCH INSTITUTE ANNUAL REPORT 1980
TPSI

DEPARTMENT OF ANIMAL PRODUCTION AND MARKETING ANNUAL REPORT JULY 1995-JUNE 1996
Abc

THE HUNGER PROJECT UGANDA ANNUAL REPORT 2017
Babu Siraj, Gerald Kato and Irene Naikali

SCOTTISH CROP RESEARCH INSTITUTE ANNUAL REPORT 2002/2003
J.E. Godfrey

PHILIPPINE COUNCIL FOR AGRICULTURE, FORSTERY AND NATURAL RESOURCES RESEARCH AND DEVELOPMENT ANNUAL REPORT 1997
William. D. Dar

PMA ANNUAL REPORT 2004/2005
Pma-Ug

INTERNATIONAL POTATO CENTER ANNUAL REPORT 2009
Pamela K. Anderson

PESTICIDE RESIDUES IN FOOD REPORT 1996
Who

VOLUNTEER EFFFORTS FOR DEVELOPMENT CONCERNS, ANNUAL REPORT 2004
Vedco

COMMITTED TO FARMERS FIELD TESTING AGRICULTURAL INNOVATIONS ANNUAL REPORT 2010
WalterAlhassan

SOILS AND SOIL FERTILITY MANAGEMENT PROGRAMME ANNUAL REPORT 2003-2004
D.N. Mubiru and H. Ssali

WORLD CONFERENCE ON AGRARIAN REFORM AND RURAL DEVELOPMENT REPORT 1979
Fao

FOOD OUTLOOK BIANNUAL REPORT ON GLOBAL FOOD MARKETS 2014
David Bedford, Claudio Cerquiglini

NATIONAL AGRICULTURAL RESEARCH ORGANIZATION ANNUAL REPORT 1996-97
Prof. J.K. Mukiibi

PMA Annual Report 2005/06
GOU

CATTLE BREEDING PROJECT 104 UGA .ANNIMAL BREEDING CENTRE DEPARTMENT OF ANIMAL PRODUCTION AND MARKETING MINISTRY OF AGRICULTURE , ANIMAL INDUSTRY AND FISHERIES ANNUAL REPORT JULY 1996-JUNE 1997
MAAIF

UGANDA NATIONAL COUNCIL FOR SCIENCE AND TECHNOLOGY ANNUAL REPORT 1993
Zarubaberi M. Nyira phd Fim

ENVIRONMENT PROTECTION AGENCY ANNUAL REPORT AND ACCOUNTS 1998
tuarascail bhliantuil

Food Science and Technology Resaearch Institute Annual Report 1997/98
DR W.M SSALI

FARMESA ANNUAL REPORT 2000
DR J MAKADHO

ID-DLO ANNUAL REPORT 1998
P.W. VAN OLM

KENYA SUGAR RESEARCH FOUNDATION ANNUAL REPORT 2003
Dr. JK Rono and Mr. J.E Jamoza

CORNELL INTERNATIONAL INSTITUTE FOR FOOD, AGRICULTURE AND DEVELOPMENT ANNUAL REPORT 1996-1997
ERICK FERNANDES

THE ROCKEFELLER FOUNDATION ANNUAL REPORT 1995
PETER C.GOLDMARK.JR

COFFEE REHABILITATION PROGRAMME ANNUAL REPORT 1984-85
CRP MANAGEMENT UNIT

SILK DEVELOPMENT ANNUAL REPORT 1998
GERSHOM MUGENYI

EAST AFRICAN ROOT CROPS RESEARCH NETWORK ANNUAL TECHNICAL REPORT 1993-1994
MAAIF

REPORT OF ANNUAL AGRICULTURAL STASTISTICS ANNUAL REPORT 1967 AND 1968
MINISTRY OF AGRICULTURE

PLANT HEALTH MANAGEMENT DIVISION ANNUAL REPORT 2000
IITA

CIBC ANNUAL REPORT 1989
CAMBRIAN NEWS LTD

INSTITUTE OF AGRICULTURAL RESEARCH ANNUAL REPORT 1995-1996
ABEBE KIRUB AND AMARE MOLLA

FARM LEVEL APPLIED RESEARCH METHODS FOR EAST AND SOUTHERN AFRICA ANNUAL REPORT 2000
SABLE PRESS

NATIONAL INSTITUTE OF AGRICULTURAL BOTANY ANNUAL REPORT 1989
VALERIE SILVEY

THE ROCKFELLER FOUNDATION ANNUAL REPORT 1996
TOMAS SENNETH

RECORD OF RESEARCH ANNUAL REPORT 1970
EAST AFRICAN AGRICULTURE AND FORESTRY RESEARCH ORGANISATION

AGRICULTURAL MACHINERY TESTING AND EVALUATION CENTRE ANNUAL REPORT 1995
AMTEC

OIE ANNUAL REPORT 2012
DR RICARDO MOLINS

ADC IDEA PROJECT ANNUAL REPORT 1997
HON MUGANWA KAJURA

UGANDA NATIONAL COUNCIL FOR SCIENCE AND TECHNOLOGY ANNUAL REPORT 1990-1991
MR M. B. M MUGOYA

UNITED NATIONS POPULATION FUND ANNUAL REPORT 1989
NAFIS SADIK

INTERNATIONAL FOOD POLICY RESEARCH INSTITUTE
MARTIN PINEIRO CHAIR

INTERNATIONAL SERVICE FOR THE ACQUISITION OF AGGRI BIOTECH APPLICATIONS ANNUAL REPORT 1992
DR ATSUSHI KOMAMINE AND MR KIJUJIRO

ENTERING THE 21ST CENTURY WORLD DEVELOPMENT REPORT 1999-2000
BARTON MATHESON

INTSORMIL SORGHUM MILLET COLLABORATIVE RESEARCH SUPPORT PROGRAM ANNUAL REPORT 2005
JOHN M YOHE

SPECIAL PROGRAM FOR AFRICAN AGRICULTURAL RESEARCH ANNUAL REPORT 2000
MOCTAR TOURE

INTERNATIONAL INSTITUTE FOR LAND RECLAMATION AND IMPROVEMENT ANNUAL REPORT 1984
DR IR J. A. H HENDRIKS

TRIENNIAL REPORT 1962-65 OF THE NORTHERN NIGERIAN MINISTRY OF AGRICULTURE
GASKIYA CORPORATION

UNITED NATIONS FUND FOR POPULATION ACTIVITIES ANNUAL REPORT 1983
U.N

ISLAMIC DEVELOPMENT BANK ANNUAL REPORT 1989-1990
DR AHMAD MOHAMED ALI

NATIONAL BEREAU OF PLANT GENETIC RESOURCES NEW DELHI ANNUAL REPORT 1994-1995
RAM NATH

INTERNATIONAL FOUNDATION FOR SCIENCE ANNUAL REPORT 1994
JUDITH FURBERG

THE FACULTY OF AGRICULTURE AND FORESTRY MAKERERE UNIVERSITY ANNUAL REPORT 1995
E.N SABIITI

DEVELOPMENT THE CHANGING LANDSCAPE ANNUAL REPORT 1990
DENISE FELTON BRYANT

STEADILY MARCHING TOWARDS A CENTENARY OF AGRICULTURAL RESEARCH IN UGANDA ANNUAL REPORT 1996-1997
CLESENSIO TIZIKARA AND SAMUEL MIKENGA
ELECTRONIC DELIVERY OF AGRICULTURE INFORMATION TO RURAL COMMUNITIES IN UGANDA ANNUAL REPORT 2003
NARO

SOILS AND SOIL FERTILITY MANAGEMENT PROGRAMME ANNUAL REPORT 1995-1996
MAGUNDA M.K

SPECIAL PROGRAM FOR AFRICAN AGRICULTURAL RESEARCH ANNUAL REPORT 1995
EDWARD V.K JAYCOX

WORLD AGROFORESTRY CENTRE ANNUAL REPORT 2001-2002
SAYFU KETEMA

UGANDA HUMAN DEVELOPMENT REPORT 2005
DAOUDA TOURE

SPECIAL PROGRAM FOR AFRICAN AGRICULTURAL RESEARCH ANNUAL REPORT 1997
PARDEY AND CRAIG

TECHNICAL CENTRE FOR AGRICULTURAL AND RURAL COOPERATION ANNUAL REPORT 1986
ROEPERS

TECHNICAL CENTRE FOR AGRICULTURAL AND RURAL COOPERATION ANNUAL REPORT 1999
SAYCE

MAKERERE UNIVERSITY COLLEGE DEPARTMENT OF GEOGRAPHY ANNUAL REPORT 1968-1969
BAKER P. R

MAKERERE UNIVERSITY COLLEGE DEPARTMENT OF AGRICULTURE ANNUAL REPORT 1963-1964
PROF BAKER

STEADILY MARCHING TOWARDS A CENTENARY OF AGRICULTURAL
PROF JK MUKIIBI

STEADILY MARCHING TOWARDS A CENTENARY OF AGRICULTURAL RESOURCES ANNUAL REPORT 1996
M LUBEGA JULIUS

BUILDING A NEW UNDP ANNUAL REPORT 1994-1995
KRISTIN MOONEY YIH-CHI WANG

COLLEGE OF AGRICULTURAL AND ENVIRONMENTAL SCIENCES ANNUAL REPORT 1991
WILLIAM P. FLATT
THE ROCKFELLER FOUNDATION ANNUAL REPORT 1999
EMERSON

CHARTING THE COURSE ANNUAL REPORT 1993
JIM CURLEY

DEVELOPMENT THE CHANGING LANDSCAPE
BUSTAR HALL

DEVELOPMENT AT THE CROSSROADS ANNUAL REPORT 1994
NONA FISHER

WEST AFRICA RICE DEVELOPMENT ASSOCIATION ANNUAL REPORT 1996
SIMON CHATER

BIOMETRICS RESEARCH SUPPORT UNITS ACTION PLAN ANNUAL REPORT 2015-2020
BUSINDE TECHNOLOGIES

BIOMETRICS RESEARCH SUPPORT UNIT ANNUAL REPORT 2015-2020
DR JIMMY

WEST AFRICA RICE DEVELOMENT ASSOCIATION ANNUAL REPORT 2000
DR KANAYO F MWANZE

WISNAPSHOTS OF DEVELOPMENT ANNUAL REPORT 1989
DENISE

WEST AFRICA RICE DEVELOPMENT ASSOCIATION ANNUAL REPORT 1999
PRAGATI

TECHNICAL CENTRE FOR AGRICULTURAL AND RURAL COOPERATION ANNUAL REPORT 2000
SAYCE LONDON

FROM PLAN TO MARKET ANNUAL REPORT 1996
GLENN

SCOPE AND IMPLEMENTATION GUIDELINES ANNUAL REPORT 2015-2020
ABAYASEKERA

INTERNATIONAL INSTITUTE OF BIOLOGICAL CONTROL ANNUAL REPORT 1997
MR GIRLING

WORKSHOP ON LAND CRAFTS AND SMALL SCALE INDUSTRIES DEVELOPMENT FOR WOMEN IN FRANCOPHONE COUNTRIES ANNUAL REPORT 1980
JASLEEN DHAMIJA

C T A TECHNICAL CENTRE FOR AGRICULTURAL AND RURAL COOPERATION ANNUAL REPORT 2002
SAYCE

REPORT OF ANNUAL AGRICULTURAL STATISTICS ANNUAL REPORT 1967
INFORMATION AND VISAL AIDS CENTRE

SCOPE AND IMPLEMENTATION GUIDELINES ANNUALL REPORT 2015-2020
PUSINDE TECHNOLOGIES

REPORT OF ANNUAL AGRICULTURAL STASTICS REPORT 1967-1968
INFORMATION AND VISUAL AIDS CENTRE

UK NATIONAL CONSENSUS CONFERENCE ON PLANT BIOTECHNOLOGY ANNUAL REPORT 1994
BRICKWORKS

INTERNATIONAL INSTITUTE OF TROPICAL AGRICULTURE ANNUAL REPORT 1999
LUCAS BRADAR

REPORT OF ANNUAL AGRICULTURAL STATISTICS REPORT 1967-1968
INFORMATION AND VISUAL AIDS CENTRE

CLIENT-ORIENTED AGRICULTURAL RESEARCH AND DISSEMINATION PROJECT ANNUAL REPORT 2001-2002
EBIYAU J

AUSTRALIAN CENTRE FOR INTERNATIOINAL AGRICULTURAL RESEARCH ANNUAL REPORT 1996-1997
ONES SOLUTIONS

INSTITUTE OF AGRICULTURAL RESEARCH ADDIS ABEBA ANNUAL REPORT 1988
JILL LAST

INTERNATIONAL POTATO CENTRE ANNUAL REPORT 1998
NINI FERNANDEZ

EAST AFRFICA ROOT CROPS RESEARCH NETWORK ANNUAL REPORT 1993-1994
EARRNET

THE INSTITUTE OF DEVELOPMENT STUDIES ANNUAL REPORT 1990
DUDLEY

INTERNATIONAL POTATO CENTRE ANNUAL REPORT 1994
JAQCK KEYSER

NAMULONGE AGRICULTURAL AND ANIMAL PRODUCTION RESEARCH INSTITUTE ANNUAL REPORT 1996/97
Ebong, C; Birirwa, G; Baguma, Y K

NAMULONGE AGRICULTURAL AND ANIMAL PRODUCTION RESEARCH INSTITUTE ANNUAL REPORT 1999/2000
Fina, O

NAMULONGE AGRICULTURAL AND ANIMAL PRODUCTION RESEARCH INSTITUTE ANNUAL REPORT 1997
Thereza, S

NATIONAL BEAN PROGRAMME ANNUAL REPORT 1994
FFina, O

ANNUAL REPORT FOR THE YEAR ENDING DECEMBER 1996 AGRICULTURAL RESEARCH & TRAINING PROJECT (IDA Cr.2446-UG)

NATIONAL BEAN PROGRAMME ANNUAL REPORT 1995/96
Fina, O

TROPICAL INSECT SCIENCE FOR DEVELOPMENT ANNUAL REPORT 1996/97
Jacob, L N

SCIENCE WITH A HUMAN FACE ICRISAT ANNUAL REPOPRT 2000
William, D D

STORIES FROM THE FIELD ANNUAL REPORT 2000
Hubert, Z

INSTITUTE FOR SOIL, CLIMATE AND WATER ANNUAL REPORT 1992/93
Philrina, V W

FOODNET ANNUAL REPORT 2001
Mbiha, E R; Ashimogo, G C; Temu, A A

THE INTERNATIONAL POTATO CENTER ANNUAL REPORT 1992
Hubert, Z

INSTITUTE OF SUSTAINABLE IRRIGATED AGRICULTURE ISIA REPORT 1993-1995
Tatura; Kyabram; Shepparton; Cobram

NATIONAL AGRICULTURAL ADVISORY SERVICES ANNUAL REPORT 2003/04
David, K K

SCOTTISH CROP RESEARCH INSTITUTE ANNUAL REPORT 2000/2001
Godfrey, J E

GREENTIE ANNUAL REPORT 1995
Torbjorn, B

AFRICARE ANNUAL REPORT 1997

1994 ANNUAL REPORT
William, T M

CAB INTERNATIONAL ANNUAL REVIEW 2001
Denis, B

DAIRY DEVELOPMENT AUTHORITY ANNUAL REPORT 2016
Jolly, K Z

SUGARCANR ANNUAL REPORT 1998
Etienne, H

INSTITUTE OF ARABLE CROPS RESEARCH REPORT FOR 1993
Lewis, T.

INSTITUTE OF ARABLE CROPS RESEARCH IACR REPORT FOR 2000-2001
Crute, I R

INTEGRATED PEST MANAGEMENT COLLABORATIVE RESEARCH SUPPORT PROGRAM FOURTH ANNUAL REPORT 1996
Brhance, G

OVERALL TRENDS IN AFRICA CONTINUE TO BE POSITIVE, DESPITE THE DIFFICULTIES ASSOCIATED WITH THE PROCESS OF PROFOUND CHANGE ANNUAL REPORT 1997/1998
Ketumile, M; Alpha, O K; Meles, Z; Jan, P P; Daniel, M; Frene, G

CIP 1988
Richard, L S

ICARDA ANNUAL REPORT 2000
Adel E B; Robert, H

FACULTY OF AGRICULTURAL AND FORESTRY SCIENCES JAARVERSLAG 2002 ANNUAL REPORT
Van Huyssteen, L

INTERNATIONAL AGRICULTURAL CENTRE ANNUAL REPORT 1991
Van de Weg, R F

THE REPORT OF THE SEVENTH REGULAR SESSION OF THE LVFO SCIENTIFIC COMMITTEE
Lake Victoria Fisheries Organization

REPORT OF THE TECHNICAL COMMITTEE ON THE ORGANISATION STRUCTURE OF IGADD SECRETARIATE
IGADD Secretariate

ADOBE ACROBAT READER VER 301 FOR WINDOWS
Adobe Systems Incorporated

PROJECT PREPARATION AND FORMULATION ON HOUSEHOLD ENERGY IN THE IGADD MEMBER COUNTRIES
IGADD

ROTHAMSTED RESEARCH ANNUAL REPORT 2006- 2OO7
Bolton Susannah

TRAINING AND EDUCATION REPORTS NO 21 REPORT OF THE CTA / ICRAF TRAINING COURSE ON MICROCOMPUTER BASED AGROFORESTRY INFORMATION MANAGEMENT
Hailu , Michael ; Niang , Thiendou ; Munyua , Hilda

PEAP REVISION GUIDE
Ministry of Finance ,Planning and Economic Development

INCEPTION REPORT THE NAADS COMMUNICATION AND INFORMATION STRATEGY
Ramirez , Ricardo

ASARECA CONCLUSIONS AND RECOMMENDATIONS OF THE PLANNING MEETING FOR REGIONAL AGRICULTURAL RESEARCH NETWORKS / PROGRAMMES OPERATING UNDER THE AUSPICES OF ASARECA HELD IN ENTEBBE, UGANDA FROM FEBRUARY 9 TO 12 1998
Regional Networks / Programmes

ANNUALPROGRESS REPORT FOR 1996/ 97 AND PROPOSAL FOR 1997/98
ASARECA

TEN YEAR DRAFT STRATEGIC PLAN FOR THE KENYA SUGAR RESEARCH FOUNDATION , KESREF
Kenya Sugar Research Foundation

AGRICULTURAL RESEARCH AND TRAINING PROJECT MID-TERM REVIEW AIDE MEMOIRE
Quisumbing , Messrs E ; Kampen , J

INTERNATIONAL ASSOCIATION PANAFRICAN INSTITUTE FOR DEVELOPMENT [PAID]
Panafrican Institute for Development

FRONT DOOR COMMUNICATIONS SYSTEM USER GUIDE
Resystom Community Networks

MICROFISCHE-FULL-TEXT-DOCUMENTS
Aris

THE GATSBY CHARITABLE FOUNDATION ANNUAL REPORT AND ACCOUNTS 2005.
PATTISON, M

SCOTTISH CROP RESEARCH INSTITUTE ANNUAL REPORT 2004-2005
STEPHENS, S

AGREEMENT FOR TECHNICAL ASSISTANCE BETWEEN THE GOVERNMENT OF THE REPUBLIC OF UGANDA AND AGRAR CONSULTING GMBH EINBECK FEDERAL REPUBLIC OF GERMANY.
AGRAR

MINUTES OF STEERING COMMITTEE MEETINGS OF THE CIAT REGIONAL PROGRAMME ON BEANS IN EASTERN AFRICA.
CIAT

REPORT OF THE SECOND JOINT FAO/WHO CONFERENCE ON FOOD ADDITIVES.
FAO

LAND USE PLANNING PROJECT TABORA REGION, TANZANIA FINAL REPORT
WHEELER, J.R; WHITE, R.J

COUNTRY REPORT 1ST QUARTER 20000 KENYA.
THAKER, P

NATIONAL CROPS RESOURCES RESEARCH INSTITUTE ANNUAL REPORT 2014
ASEA, G

ROTHAMSTED RESEARCH ANNUAL REPORT 2005-2006.
BARLET, D.E

SEMI-ANNUAL REPORT JULY TO DECEMBER 1997 OF THE CATTLE BREEDING PROJECT.
HASHAKIMANA, K.G

FINAL TECHNICAL REPORT ELECTRONIC DELIVERY OF AGRICULTURAL INFORMATION TO RURAL COMMUNITIES IN UGANDA.
ADUPA, J

NAMULONGE AGRICULTURAL AND ANIMAL PRODUCTION RESEARCH INSTITUTE ANNUAL REPORT 1995-1996.
NAARI

ASARECA ANNUAL REPORT 2008
KETEMA, S

POTATOES AND PROVIDING FOOD SECURITY ANNUAL REPORT
EGGER, R

UGANDA GATSBY TRUST ANNUAL REPORT AND FINANCIAL STATEMENT 2006.
KASULE, I

ANNUAL GENERAL MEETING 2001 OCTOBER 30-31 WASHINGTON DC, USA STAKEHOLDERS MEETING.
JOHNSON, I

P M A JOINT ANNUAL REVIEW 2005.
KASSAMI, C.M

CENTRE FOR BASIC RESEARCH ANNUAL REPORT 2002-2003.
BARYA, J

PMA ANNUAL REPORT 2005-2006.
MUKWAYA, J

ASARECA ANNUAL REPORT 2008
KETEMA, Y

4TH ANNUAL NATIONAL INTERNAL AUDIT CONFERENCE.
GARITTE, P.J

ANNUAL REPORT ROTHAMSTED RESEARCH 2007
SUSANNAH, B; PLUMB, R

UGANDA COFFEE DEVELOPMENT AUTHORITY ANNUAL REPORT
MWESIGYE, H

CTA ANNUAL REPORT 2009 HIGHLIGHTS.
NEUN, H

MATERIALS FOR THE PME MISSION ON REPORTS AND REPORTING IN THE PARIS.
PARI

2012 GLOBAL FOOD POLICY REPORT.
POPHAM, D; HALLOWELL, C

REPORT OF THE REGIONAL AGRO INDUSTRIES FORUM FOR THE MIDDLE EAST AND NORTH AFRICA.
MARIA, E

IFPRI EASTERN AFRICA FOOD POLICY NETWORK REPORT 12 NOVEMBER 2004.
KAUNDA, E; KAMANGA, L

COUNTRY REPORT 3RD QUARTER 1998 ETHIOPIA ERITREA SOMALIA DJIBOUTI.
KRISTEN, A

CTA ANNUAL REPORT 2007.
NEUN, H

COUNTRY REPORT 1ST QUARTER 2000 INDIA NEPAL
BIHARI, A; MURASOLI, M
Bills and Statutes

NEW PRINCIPLES OF PHYTOSANITARY LEGISLATION.
DURAND, S; BOUSQUET, P

UGANDA DISTRICTS INFORMATION HANDBOOK EXPANDED EDITION 2007-2008.
MPAGI, S.A

INNOVATIONS IN INNOVATIONS REFLECTION ON PARTNERSHIP, INSTITUTIONS AND LEARNING.
YOGANAND, B; REJESWARI,
Biotechnology

BIOTECHNOLOGY AND PLANT GENETIC RESOURCES
Callow, J A; Ford, B V; Newbury, H J

ECOLOGY AND BIOLOGY OF RHAMPHICARPA FISTULOSA
Stella, K

INTELLECTUAL PROPERTY RIGHTS FOR AGRICULTURAL BIOTECHNOLOGY
Jeroen, W; Joel, I C; John, K

AGRICULTURAL BIOTECHNOLOGY IN DEVELOPING COUNTRIES
John, K; Gabrielle, P

AGRICULTURAL BIOTECHNOLOGY AND THE POOR
Persley, G J; Lantin, M M

RESOURCE BOOK FOR IMPLEMENTATION OF BIOSAFE IN EAST AFRICA
Charles, M; John, A B

BIOENGINEERING OF CROPS
Henry, W K; Roger, B; Thomas, E; Fred, G H; Peter, H R; Jozef, S S; Swaminathan, M S

THE EXPLOITATION OF PLANT GENETIC INFORMATION POLITICAL STRATEGIES IN CROP DEVELOPMENT
Pistorius, R; Wijk, J

BIOTECHNOLOGY AND FOOD SAFETY
Who

INTEGRATING BIOTECHNOLOGY IN AGRICULTURE: INCENTIVES, CONSTRAINTS AND COUNTRY EXPERIENCES
Carliene, B; John, K

PROMETHEAN SCIENCE AGRICULTURAL BIOTECHNOLOGY, THE ENVIRONMENT, AND THE POOR
Ismail, S; Persley, G J

MODIFYING AFRICA
Florence, W

ASSESSING THE IMPACTS OF AGRICULTURAL BIOTECHNOLOGIES
Herbert, B C

INTELLECTUAL PROPERTY RIGHTS FOR AGRICULTURAL BIOTECHNOLOGY
Jeroen, W; Joel, I C; John, K

BIOTECHNOLOGY: BUILDING ON FARMERS` KNOWLEDGE
Joske, B; Bertus, H; Wim, H

AGRICULTURAL BIOTECHNOLOGY: OPPORTUNITIES, BENEFITS AND RISKS
Kisamba, W M

RICE BIOTECHNOLOGY
Gurdev, S K; Gary, H T

BIOFERTILIZER GERMPLASM COLLECTIONS AT IRRI
Watanabe, I; Roger, P A; Ladha, J K; Hove, C V

BIOLOGICAL RESOURCE CENTRES

THE BENEFITS OF BIOTECHNOLOGY FOR SMALL-SCALE BANANA PRODUCERS IN KENYA
Florence, M W; Romano, K

SOCIOPOLITICAL EFFECTS OF NEW BIOTECHNOLOGIES IN DEVELOPING COUNTRIES
Klaus, M L

BIOTECHNOLOGY IN AGRICULTURE, FORESTRY AND FISHERIES
Haen, H

THE UGANDA BIOTECHNOLOGY INITIATIVE
Julian, S

AGRICULTURAL BIOTECHNOLOGY FOR DEVELOPING COUNTRIES
John, R; Maria, Z

ANALYSIS OF A NATIONAL BIOSAFETY SYSTEM: REGULATORY POLICIES AND PROCEDURES IN ARGENTINA
Moises, B; Patricia, L T

ANALYSIS OF A NATIONAL BIOSAFETY SYSTEM: REGULATORY POLICIES AND PROCEDURES IN EGYPT
Magdy, A M; Amin, S N; Patricia, L T

GLOBAL REVIEW OF THE FIELD TESTING AND COMMERCIALIZATION OF TRANSGENIC PLANTS: 1986TO 1995 THE FIRST DECADE OF CROP BIOTECHNOLOGY
Anatole, F K; Clive, J

TURNING PRIORITIES INTO FEASIBLE PROGRAMS
John, K; Joel, I C; Zenda, O

PLANT SPERM CELLS AS TOOLS FOR BIOTECHNOLGY
Wilms, H J; Keijzer, C J

BIOTECHNOLOGY: ENHANCING RESEARCH ON TROPICAL CROPS IN AFRICA
Thottappily, G; Monti, L M; Mohan, D R R; Moore, A W

BIOTECHNOLOGY AND INTEGRATED PEST MANAGEMENT
Persley, G J

BIOTECHNOLOGY AND DEVELOPING COUNTRIES
Gottlieb, K; Reule, M; Franzen, H

APPLICATION OF BIOTECHNOLOGY TO NUTRITION OF ANIMALS IN DEVELOPING COUNTRIES
Leng, R A

RESOURCE BOOK FOR IMPLEMENTATION OF BIOSAFETY IN EAST AFRICA
Charles, M; John, A B

COMING TO LIFE. BIOTCHNOLOGY IN AFRICA ECONOMIC RECOVERY
Calestous, J; John, M; Patricia, K M

AGRICULTURAL BIOTECHNOLOGY IN THE
Fao

BIOTECHNOLOGY POLICY AND THE CGIAR
Isnar
PROCEEDINGS OF THE NATIONAL WORKSHOP ON ENLARGING PUBLIC-PRIVATE PARTNERSHIPS FOR BIOTECHNOLOGY
Julius, E; Deborah, K

PROCEEDINGS OF THE FIRST BIONET-INTERNATIONAL CONSULTATION, LONDON.
Tecwyn, J E; Mark, A C
.jpg)
BIOTECHNOLOGIES IN DEVELOPING COUNTRIES: PRESENT AND FUTURE
Albert, S

NATIONAL BIOTECHNOLOGY AND BIOSAFETY POLICY

FREEDOM TO INNOVATIVE
Calestous, J; Ismail, S

THE TECHNOLOGY TRIANGLE
Deborah, M S; David, K

HORTICULTURE, ENVIRONMENT, AND BIOTECHNOLOGY
Kee Yoeup Paek

A NEW MODEL FOR TECHNOLOGY TRANSFER IN GUATEMALA
Ramiro, O; Sergio, R; Horacio, J; Francisco, O; Adlai, Mes

GLOBAL BIODIVERSITY ASSESSMENT
Heywood, V H; Watson, R T

WORLD JOURNAL OF MICROBIOLOGY ANF BIOTECHNOLOGY
Ratledge, C; Large, P J

ANALYSIS OF THE BIOSAFETY SYSTEM FOR BIOTECHNOLOGY IN KENYA: APPLICATION OF A CONCEPTUAL FRAMEWORK
Patricia, L T; Harrison, K M

USE OF MOLECULAR MARKERS IN SORGHUM AND PEARL MILLET BREEDING FOR DEVELOPING COUNTRIES
DUNCAN, R.R; WITCOMBE, J.R

POSTHARVEST BIOTECHNOLOGY OF VEGETABLES.
SALUNKHE, D.K

CAPACITY BUILDING IN AGRICULTURAL BIOTECHNOLOGY RESEARCH.
ENYARU, J; KYETERE, D

TOWARDS SAFE AND EFFECTIVE USE OF CHEMICALS IN COASTAL AQUACULTURE.
ALDERMANN, J.D

GETTING STARTED IN ELECTRONIC JOURNAL PUBLISHING.
SALLY,M

MANUAL ON THE DEVELOPMENT AND USE OF FAO SPECIFICATIONS FOR PLANT PROTECTION PRODUCTS.
DEBRAT, W; HENRIET, J

IRRIGATION WATER MANAGEMENT TRAINING MANUAL NO 1.
BROUWER, C; HEIBLOEM, M

HOW TO ACCELERATE YOUR INTERNET.
FLICKENGER, R

BIOTECHNOLOGY INDIAN FARMERS.
SIDDIQ, E.A; KOPPA, S

GENERAL INFORMATION FOR BIOTECHNOLOGY AND BIOSAFETY AWARENESS.
UNCST

UGANDA JOURNAL OF AGRICULTURAL SCIENCES.
EBONG, C

AGROBIOTECHNOLOGY AND FOOD SECURITY.
CHAGARA, E; WEKUNDAH, S

REPORT OF THE TECHNICAL CONSULTATION ON THE ENHANCEMENT OF SMALL WATER BODY FISHERIES IN SOUTHERN AFRICA.
HAIGHT, A.B

ELECTRONIC JOURNALS PACKAGE
ROTHSCHILD, G.H

JOURNALS 2007 ROYAL SOCIETY OF CHEMISTRY.
HALL, E

AMERICAN PHYSICAL SOCIETY JOURNALS BROCHURE.
TAYLOR, D; BONATTO, C

UNITED NATIONS DEVELOPMENT PROGRAMME
SEMATA, F

ELECTRONIC JOURNALS PACKAGE.
CABI

TRAINING MANUAL FOR EMBRYO TRANSFER IN WATER BUFFALOES.
KACHEVA, M; KAMONPATANA, M

SAWDOCTORING MANUAL.
FAO

MANUAL ON THE APPLICATION OF THE HACCP SYSTEM IN MYCOTOXIN PREVENTION AND CONTROL.
CHATHAM, M; PINEIRO, M

ECOLOGY AND RURAL EDUCATION MANUAL FOR RURAL TEACHERS.
CHIAPPINI, A; ALLISON, R

HANDBOOK FOR PREPARING AND WRITING RESEARCH PROPOSALS.
REID, P

LAND TENURE JOURNAL.
FAO

REPORT OF THE CGIAR PANEL ON GENERAL ISSUES IN BIOTECHNOLOGY.
SERAGELDIN,I

CONDUCTING SMALL-SCALE NUTRITION SURVEY; A FIELD MANUAL
LUNVEN, P

PROCEEDINGS OF THE 17TH BIENNIAL WEED SCIENCE SOCIETY CONFERENCE FOR EASTERN AFRICA.
CHIVINGE, O.A; TUSIIME, G; ADIPALA, E
Crop Husbandry

African Crop Science
tenywa and j.s nampala

DEVELOPMENT OF CROPS TOLERANT TO ADVERSE ENVIRONMENTS
M. Wissuwa

CROP RESIDUE BASED DENSIFIED TOTAL MIXED RATION
T.K WALLI

EAST AFRICA ROOT CROPS RESEARCH NETWORK 1994-95
MR KAMAU

DEPARTMENT OF AGRICULTURE CROP PRODUCTION TARGETS 1973
P.F. Kunya

A GUIDE TO SERICULTURE PRACTICES IN UGANDA
John Ndyabagye

TECHNICAL REPORT DRAFT CASSAVA MULTIPLICATION PROJECT
G.W OTIM NAPE AND A. BUA

A DRAFT PROPOSAL FOR THE ESTABLISHMENT OF AN IITA REGIONAL SUBSTATION IN EAST AND SOUTHERN AFRICA FOR CASSAVA, BANANA AND OLANTAIN IMPROVEMENT
Naro and iita

INTERNATIONAL CASSAVA-TRANS PROJECT
Dr. C. Fauquet, ORSTOM, and Prof. R.N. Beachy, Washington University

ANNUAL FOOD CROPS RESEARCH PLAN FOR UGANDA 1988
IITA

MARKETING OF BANANA AND BANANA PRODUCTS IN UGANDA: RESULTS OF A RAPID RURAL APPRAISAL
Philip Digges

NEXT CHALLENGES IN RICE DEVELOMENT FOR AFRICA :WORKSHOP FOR NEW COLLABORATION BETWEEN JIRCAS AND AFRICA RICE
S. YANAGIHARA

BANANA BASED CROPPING SYSTEMS RESEARCH
S.B. Mukasa

PRODUCTION PROSPECTS FOR CASSAVA IN UGANDA
Felix I. Nweke, G.W. Otim, A.G.O Dixon, C.L.A. Asadu, A bUA, o. and B.O Ugwu

Rice Science innovations and Impact for Livelihood
d.s brar and t.w mew

Management Arrangements for Accommodating Nonrice Crops in Rice Based Irrigation System
Senen, N M

PROMOTING CROP DIVERSIFICATION IN RICE BASED IRRIGATION SYSTEMS
SENEN, M M

TROPICAL SOYBEAN IMROVEMENT AND PRODUCTION

IRRI Rice Almanac
klaus, L

MAIZE
Karl, S

CITROUS JUICES,TRENDS AND PROSPECTS IN WORLD PRODUCTIONSND INTERNATIONAL TRADE
Fao

GLOBAL EVALUATION OF MUSA GERMPLASM FOR RESISTANCE TO FUSARIUM WILT, MYCOSPHAERELLA LEAF SPOT DISEASES AND NEMATODES
Jean, C; De Waele, D; Jean-Vincent, E

CANE SUGAR. THE SMALL-SCALE PROCESSING OPTION
Raphael, K

Impact of ICRISAT Research on sorghum midge on australian agriculture
BANTILAN, JP MCS

MAKING THE MOST OF MUSA INIBAP
Ipgri

RESOURCE CONSERVING TECHNOLOGIES : TRANSFORMING THE RICE-WHEAT SYSATEMS OF THE INDO GANGETIC PLAINS
RAJ, K G; PETER, R H

THE DYNAMICS OF CASSAVA PRODUCTION IN AFRICA
Felix, I N

THE TOMATO CROP
Atherton, J G; Rudich, J

INFOMUSA THE INTERNATIONAL MAGAZINE ON BANANA AND PLANTAIN

EDIBLE HORTICULTURAL CROPS
Clive, H; Julie, C

A FARMER PRIMER ON GROWING RICE
BENITO, S V

GRAIN QUALITY EVALUATION OF WORLD RICES
JULIANO, B O; VILLAREAL, C P

SOIL PHYSICAL PROPERTIES
WOPEREIS, M; WOODHEAD, T

PRODUCTION OF ACP FRESH FRUITS AND VEGETABLES FOR EXPORT TO THE EFC
Judith, N W

LA PROMOTION DE LA PRODUCTION DES FRUITS ET LEGUMES DANS LES PAYS ACP POUR L`EXPORTATION VER LES PAYS DE LA CEE

WORLD RICE STASTISTICS 1990
FAO

CASSAVA VARIETAL NEEDS OF FARMERS AND THE POTENTIAL FOR PRODUCTION GROWTH IN AFRICA
Felix, I N; Dixon, A G O; Asiedu, R S A; Folayan

PROCEEDINGS OF A SEMINAR ON CROP PROTECTION FOR RESOURCE-POOR FARMERS
Gibson, R W; Sweetmore, A.

RICE THE ESSENTIAL HARVEST
WILLIAM, G

SHOOT-TIP CULTURE FOR THE PROPAGATION, CONSERVATION, AND DISTRICUTIONOF MUSA GERMPLASM
Vuylsteke

HYBRID RICE TECHNOLOGY NEW DEVELOPMENTS AND FUTURE PROSPECTS
VIRMANI, S S

SCREENING OF MUSA GERMPLASM FOR RESISTANCE AND TOLERANCE TO NEMATODES
Paul, R S; De Waele, D

TROPICAL AND SUBTROPICAL FRUITS

BREAKING THE YIELD BARRIER
CASSMAN, K J

RICE PRODUCTION IN UTTAR PRADESH
Pathak, M D

TROPICAL AND SUB-TROPICAL FOODS
Susan, M; Anne, P

DIRECT SEEDED FLOODED RICE IN THE TROPICS
Barbier, J M

THE STORAGE OF FOOD GRAINS AND SEEDS
Appert, J

FARMERS` SEED PRODUCTION
Conny, A; Niels, L

Rice biotechnology
Gurdey, S K

RICE THE ESSENTIAL HARVEST
PETER, T W

MULTIPLE CROPPING
Papendick, R I; Sanchez, P A; Triplett, G B

AFRICAN INDIGENOUS VEGETABLES IN URBAN AGRICULTURE
Charlie, M S; Margaret, W P; Axel W D

METHANE EMISSIONS FROM MAJOR RICE ECOSYSTEMS IN ASIA
WASSMANN, R

ADOPTTION OF MAIZE PRODUCTION TECNOLOGIES
Aloyce, R M K; Hugo, V; Wilfred, M; Alfred, J M; Amos, C; Joseph, S K; Ponniah, A

THE POTATO IN THE HUMAN DIET
Jennifer, A W

CASHEW
Ohler, J G

RICE HUNGER OR HOPE
CAROLYN, D

IMPACT OF RICE RESEARCH
Prabhu, L P; Mahabub, H

ROOT AND TUBER CROPS

BUCKWHEAT GENETIC RESOURCES IN EAST ASIA
Ibprg

RICE IN HUMAN NUTRITION
BIENVENIDO, O J

GROWING DIVERSITY
Davd, C; Renee, Hobbelink

SAFEGUARDING THE GENETIC BASIS OF AFRICA`S TRADITIONAL
Putter, A

AFRICAN CEREAL STEM BORERS ECONOMIC IMPORTANCE, TTAXONOMY, NATURAL ENEMIERS AND CONTROL
Polaszek, A

A REVIEW OF THE BIOLOGY AND CONTROL OF THE RICE MOTH CORCYRA CEPHALONICA STAINTON
WEBLEY

GREEN MANURE PRODUCTION SYSTEMS FOR ASIAN RICELANDS
Ladha, J K; Garrity, D P

BAMBARA GROUNDNUT
Heller, J; Begemam, F; Mushonga, J

a mannual of rice seed health testing
MEW, T W; MISRA, J K

ORGANIC/ENVIRONMENTALLY FRIENDLY BANANA PRODUCTION
Rosales, F E; Tripon, S C; Cerna, J

CYTOGENETICS OF ARACHIS
Moss, J P

CROPS OF THE DRIER REGIONS OF THE TROPICS
Gibbon, D; Pain, A

STEM AND POD ROTS OF GROUNDNUT
Mehan, V K; Mayee, C D; Brenneman, T B; McDonald, D

QUALITY DECLARED PLANTING MATERIAL
Juan, F; NeBambi, L; Micheal, L; Cadmo, R

RICE IN HUMAN NUTRITION
JULIANO, O

RICE IN CRUCIAL ENVIRONMENT
LARUE, P

A HANDBOOK FOR WEED CONTROL IN RICE
KWESI, A N

COMPTES RENDUS DE LA SIXIEME REUNION REGIONALE DE L`ICRISAT SUR L`ARACHIDE EN AFRIQUE OCCIDENTALE ET CENTRALE
Marfo, K O

A REVIEW OF THE AFRICA MAIZEW STRESS PROJECT
Naro

HYBRID RICE SEED PRODUCTION
VIRMANI, S S

PROMUSA, A GLOBAL PROGRAMME FOR MUSA IMPROVEMENT
Frison, E A; Orjeda, G; Sharrock, S L

GENETIC IMPROVEMENT OF RICE FOR WATER
Ito, O; O`Toole, J; hardly, B

UTILIZATION AND PROCESSING OF MAIZE
Augustine, E O

THE WILD RELATIVES OF RICE
DUNCAN, A V

A POLICYMAKERS` GUIDE TO CROP DIVERSIFICATION: THE CASE STUDY OF THE POTATO
Wachira, K; Alice, N; John, N

INTERNATIONAL SORGHUM AND MILLETS NEWSLETTER
Sicna

FOOD LEGUMES
Daisy, E K

SUGAR PROSESSING: THE DEVELOPMENT OF A THIRD-WORLD TECHNOLOGY
Raphael, K

MAIZE GROWING PACKAGE FOR SNALLHOLDER MAIZE GROWERS

CRYOPRESERVATION OF MUSA GERMPLASM
Bart, P; Nguyen, T T

WORLD RICE STATISTICS 1993
GEORGE, R

POTENTIAL FOR DIVERSIFIED CROPPING IN THE RICE LANDS OF SRI LANKA
WIJAYARATNA, C M; PANABOKKE, C R

INTEGRATING SCIENCE WITH FARMER KNOWLEDGE: SORGHUM DIVERSITY MANAGEMENT IN NORTH-EAST GHANA
Comfort, Y K

MEASURING THE SOURCE OF GROWTH IN RICE YIELDS;ARE GROWTH RATES DECLINING IN ASIA
HOWARTH, E B

HANDBOOK ON RICE POLICY FOR ASIA
Annette, T; Imelda, M; Harold, G V; Khondoker, A

Workshop on Research and Training Needs in the Field of integrated Vector borne Disease Control in Riceland Agroecosystems of Developing Countries
SLOOFF, R

BREADWHEAT IMPROVEMENT AND PRODUCTION
Curts, B C; Rajaram, S; Gomez, H M

the dynamics of irrigated rice farming in mali
loes, k

RICE PRODUCTION IN CAMBODIA
NESBITT, H J

IMPACT ASSESSMENT OF CROP AND RESOURCE MANAGEMENT TECHNOLOGY
Josh, P K; Bantilan, M C S

OPPORTUNITIES FOR BIOLOGICAL NITROGEN FIXATION IN RICE AND OTHER NON LEGUMES
LADHA, J K

RICE IN DEEP WATER
David, C

APOMIXIS EXPLOITING HYBRID VIGOR IN RICE
KHUSH, G S

INFLUENCE OF MSMA ON STRAIGHTHEAD, ARSENIC UPTAKE AND GROWTH RESPONSE IN RICE
ROBERT, F

HERBICIDES IN ASIAN RICE; TRANSITIONS IN WEED MANAGEMENT
ROSAMOND, N

COVER CROPS FOR NATURAL RESOURCE MANAGEMENT IN WEST AFRICA
CARSKY, R J

NODULATION AND NITROGEN FIXATION IN RICE
KHUSH, G S

THE WORLD RICE MARKET STRUCTURE, CONDUCT, AND PERFORMANCE
AMMAR, S

TWO LINE HYBRID RICE BREEDING MANUAL
VIRMANI, S S

ADVANCES IN HYBRID RICE TECHNOLOGY
VIRMANI, S S

AGRICULTURAL GROWTH AND INVESTMENT OPTIONS FOR POVERTY REDUCTION IN RWANDA
KANYARUKIGA, S

RICE PEST AND MANAGEMENT
TENG, P S

RICE RESEARCH IN DEVELOPED POLICY
ZEIGLER, R S

HETEROSIS AND HYBRID RICE BREEDING
VERLAG, S

POTENTIAL FOR IMPROVING RICE PRODUCTION IN TABORA REGION, TANZANIA AND IMPLICATIONS FOR VILLAGE PLANNING
SILVA, G L

REPORT OF THE STRATEGIC PLANNING MEETING ON THE INTERSPEFFIC HYBRIDIZATION OF RICE IN AFRICA
TASHUSHI, T

COLLECTING PLANT GENETIC DIVERSITY
LUIGI, G

LISTENING TO THE FARMERS
JAVELLANA, A

THE CONSTRUCTION AND OPERATION OF A RICE HUSK BURNER
ROBINSON, A P

A CENTURY OF RICE IMPROVEMENT IN BURMA
KLAUS, L

MARKETING OF SMALLHOLDER CROPS IN UGANDA
BIBAGAMBAH, J R

RICE BLAST MODELING AND FORECASTING
BASTIAANS, L

NEEM PESTICIDES IN RICE POTENTIAL AND LIMITATIONS
LIMGUAN, S; DALE, G

LEGUME GREEN MANURES IN THE MANAGEMENT OF MAIZE BEAN CROPPING SYSTEMS IN EASTERN AFRICA WITH SPECIAL REFERENCE TO CROTALARIA
FISCHLER, M

RICE ROOTS NUTRIENTS AND WATER
KIRK, G J D

UPLAND RICE, HOUSEHOLD FOOD SECURITY AND COMMERCIALIZATION OF UPLAND AGRICULTURE IN VIETNAM
PANDEY; TIEN, T C
TECHNICAL GUIDELINERS FOR RESPONSIBLE FISHERIES
BARRY, W

RICE IN ASIA; IS IT BECOMING A COMMERCIAL GOOD
HOWARTH, E B

RICE AND CORN TECHNOLOGY
BIENVENIDO, O J

ALLELOPATHY IN RICE
OLOFSDOTTER, M

RICE POPULATION EFFECTS ON YIELD AND NUTRIENTS STATUS
PAUL, A C

SEASONAL RICE PRICE VARIATION IN THE PHILIPPINES; MEASURING THE EFFECTS OF GOVERNMENT INTERVENTION
HOWARTH E

EFFECTS OF IRRIGATION INDUCED TECHNOLOGICAL CHANGE IN BANGLADESH RICE PRODUCTION
KHUTER, A U A

IMPACT OF PESTICIDES ON FARMER HEALTH AND THE RICE ENVIRONMENT
PRABHU, L P

A RICE VILLAGE SAGA
YUJIRO, H

PHARLAP A CROPPING SYSTEMS STUDY ON RAINFED RICE FARMS IN ANTIQUE PROVINCE AND PHILIPPINES
TASIC, R C

WHEAT HEALTH MANAGEMENT
JAMES, R C

THE WORLD SORGHUM AND MILLET ECONOMIES
PATANCHERU

THE TRAINING AND VISIT SYSTEM AND THE LINKS BETWEEN RICE RESEARCH
STEPHAN, S

RICE AREA BY TYPE OF CULTURE
ROBERT, E H

A STUDY IN THE DETERMINATION OF QUALITY RELATIONSHIPS IN RICE
CONWAY, J A

PROSPECTS FOR GROWING EXTRA SHORT DURATION PIGEONPEA IN ROTATION WITH WINTER CROPS
LAXMAN, S

A PARTNERSHIP IN RICE RESEARCH
DENNING, G L; VO TONG XUAN

RESOURCE MANAGEMENT IN RICE SYSTEMS
LADHA, J K

POTATO GENETICS
BRADSHAW, J E

RICE GENETICS 3
KHUSH, G S

STRENGTHENING MAIZE SEED SUPPLY SYSTEMS FOR SMALL-SCALE FARMERS IN WESTERN KENYA AND UGANDA
MUGO, S

IMPACT OF IITA-IMPROVED GERMPLASM ON MAIZE PRODUCTION IN WEST AND CENTRAL AFRICA
MANYONG, V M

COMPENDIUM OF SORGHUM DISEASES
BANDYOPADHYAY, R

COMPENDIUM OF SORGHUM DISEASES
RICHARD, A F

INCREASING PRODUCTIVITY OF INTENSIVE RICE SYSTEMS THROUGH SITE SPECIFIC NUTRIENT MANAGEMENT
DOBERMANN, A
THE FOREST FOR THE TREES , GOVERNMENT POLICIES AND THE MISUSE OF FOREST RESOURCES
ROBERT, R

THE POTENTIAL ROLE OF AGROFORESTRY IN ACP COUNTRIES
BEETS, W C

PROCEEDINGS OF THE FIFTH REGIONAL GROUNNUT WORKSHOP FOR SOUTHERN AFRICA
NAGESWARA, RC R

CROP RESIDUES IN SUSTAINABLE MIXED/LIVESTOCK FARMING SYSTEMS
RENARD, C

HANDBOOK ON RICE POLICY FOR ASIA
MOHANTY, S

BREAD WHEAT IMPROVEMENT AND PRODUCTION
CURTIS, B.C

CRYOPRESERVATION OF MUSA GERMPLASM
NGUYEN, T T

IDENTIFYING PRODUCTION PROBLEMS IN TROPICAL MAIZE
MUHTAR, H; AFE, P

SUGAR PROCESSING THE DEVELOPMENT OF A THIRD WORLD TECHNOLOGY
ALISTAIR, N

THE MARKET FOR DRIED FRUIT IN THE UNITED KINGDOM, THE FEDERAL REPUBLIC OF GERMANY AND FRANCE
ANAND, N

MAIZE GROWING PACKAGE FOR SMALLHOLDER MAIZE GROWERS
NYAMBARE, CF; OLUM, G

LEGUMES IN RICE BASED CROPPING SYSTEMS IN TROPICAL ASIA
GOWDA, G LL; RAMAKRISHNA, A

REGIONAL INTERGRATION AND FOOD SECURITY IN DEVELOPING COUNTRIES
MATHEW, A

RICE TODAY
SERANO, I

UGANDA NATIONAL FARMERS ASSOCIATION
ESTER A

SOME LOCAL VEGETABLES AND FRUITS OF UGANDA
NARO

IMPACT ASSESSMENT OF CROP AND RESOURCES MANAGEMENT TECHNOLOGY
JOSHI, PK

GROUNDNUT
PANDE, S

AGRICULTURAL RESEARCH DELIVERY IN AFRICA
EMERSON, F.G

PROCCEDINGS OF THE CONSULTANTS GROUP DISCUSSION ON THE RESISTANCE TO SOIL BORNE DISEASE OF LEGUMES
NENE, Y.L

METHODOLOGIES FOR ROOT DROUGHT STUDIES IN RICE
SHASHIDHAR

INTERNATIONAL NETWORK FOR THE IMPROVEMENT OF BANANA AND PLANTAIN
JEFF, D

COMBATING MICRONUTRIENT DEFICIENCIES
HAWKS, B T C

PLANTAIN CULTIVATION UNDER WEST AFRICAN CONDITION
SWENNEN, R

EFFECT OF ASSOCIATED CROPS ON NEMATODES
MARKHAM, R

NEMATODES AND THE BORER WEEVIL IN BANANAS
BRIDGE, J

UTILIZATION AND PROCESSING OF MAIZE
NANCY, J

SPACING STUDIES OF SORGHUM AND MAIZE
DYER A.

A POLICYMAKER GUIDE TO CROP DIVERSIFICATION
KAGUONGO, W; NYANGWESO, A

SWEETPOTATO IN THE FARMING AND FOOD SYSTEMS OF UGANDA
OCITTI C

STEM AND POD ROTS OF GROUNDNUT
MEHAN V.K

CROPS OF THE DRIER REGIONS OF THE TROPICS
GIBB0N, D

QUALITY DECLARED PLANTING MATERIAL
FAJARDO, J

SUMMARY PROCEEDINGS OF THE SIXTH ICRISAT REGIONAL GROUNDNUT MEETING FOR WESTERN AND CENTRAL AFRICA
MARFO

BAMBARA GROUDNUT
HELLER J.

UTILIZATION AND PROCESSING OF MAIZE
OKURUWA, A

A GLOBAL PROGRAMME FOR MUSA IMPROVEMENT
FRISON E.

A REVIEW OF THE AFRICAN MAIZE STRESS PROJECT
NARO

INTERNATIONAL SORGHUM AND MILLETS
REDDY, S

NEW FRONTIERS IN RESISTANCE BREEDING FOR NEMATODE
VALMAYOR, R

CYTOGENETICS OF ARACHIS
RAMANNATHA, R

FOOD LEGUMES
DAISY, K

CASSAVA IN TROPICAL AFRICA
IBADAN

GROUNDNUT SEED PRODUCTION MANUAL
NIGAM SN

RICE IN DEEP WATER
CATLING, D

GENETIC IMPROVEMENT OF RICE FOR WATER LIMITED ENVIRONMENT
TOOLE JO.

SORGHUM FINGER MILLET AND PIGEONPEA GERMPLASM COLLECTION IN UGANDA
MENGESHA, M

TROPICAL AND SUBTROPICAL FRUITS
SABEL W.

A PROCEEDINGS OF THE FIRST EASTERN CENTRAL AND SOUTHERN AFRICA REGIONAL MAIZE WORKSHOP
KIYIBIGI M

THE WORLD BANANA ECONOMY
ARIAS, P

SHARING RICE
FREDENBURG, P

PLANT GENETIC RESOURCES AND FOOD SECURITY
CHRISTINE

SUSTAINABLE GROUNDNUT PRODUCTION IN SOTHERN AND EASTERN AFRICA
NDUNGURU B.J

ADVANCES TEMPERATE IN RICE RESEARCH
JENA K.K

REGULATION OF STATCH SYNTHESIS IN CASSAVA
YONA, B

SUMMARY AND RECOMMENDATIONS OF THE INTERNATIONAL WORKSHOP ON AFLATOXIN CONTAMINATION OF GROUNDNUT
SWINDALE L.D

A RESEARCH AND NETWORK STRATEGY FOR SUSTAINABLE SORGHUM AND PEARL MILLET PRODUCTION SYSTEMS FOR LATIN AMERICA
TINDALI H.D

SAFEGUARDING THE GENETIC BASIS OF AFRICA TRADITIONAL CROPS
PUTTER A.

SCREENING OF MUSA GERMPLASM FOR RESISTANCE AND TOLERANCE TO NEMATODES
PAUL, R; DIRK, W

INTEGRATING SCIENCE WITH FARMER KNOWLEDGE;SORGHUM DIVERSITY MANAGEMENT IN NORTH EAST GHANA
KUDADJIE, C

GROWING DIVERSITY
COOPER, D

TROPICAL SOYA BEAN IMPROVEMENT AND PPRODUCTION
NEUMAIER N

BUCKWHEAT GENETIC RESOURCES IN EAST AFRICA
KAZUMI, K

THE STORAGE OF FOOD GRAINS AND SEEDS
APPERT, J

TROPICAL AND SUB-TROPICAL FOODS
MAYHEW, S

AFRICAN CEREAL STEM BORERS ECONOMIC IMPORTANCE, TAXANOMY, NATURAL ENEMIES AND CONTROL
POLASZEK, A

RICE PRODUCTION IN UTTAR PRADESH

TROPICAL AND SUBTROPICAL FRIUTS
CHARLEY, F

MORPHOLOGY AND GROWTH OF MAIZE
KLING, J

SHOOT-TIP CULTURE FOR THE PROPAGATION,CONSERVATION AND DISTRIBUTION OF MUSA GERMPLASM
VUYLSTEKE DR.

PROCEEDINGS OF A SEMINAR ON CROP PROTECTION FOR RESOURCE POOR FARMERS
GIBSON R.W

PRODUCTION OF ACP FRESH FRUITS AND VEGETABLES FOR EXPORT TO THE EEC
ARNHEM, P

ADOPTION OF MAIZE PRODUCTION TECHNOLOGIES IN EASTERN TANZANIA
CHILAGANE, A

CASSAVA VARIETAL NEEDS OF FARMERS AND THE POTENTIAL FOR PRODUCTION GROWTH IN AFRICA
NWEKE, F

THE POTATO IN THE HUMAN DIET
WOOLFE, J

IMPACT OF RICE RESEARCH
PRABHU, P

ROOT AND TUBER CROPS RESEARCH HIGHLIGHTS
SEMUGURUKA G.H

LOOOKING AHEAD A STRATEGY OF CHOICE
ZANDSTRA H.G

FARMERS SEED PRODUCTION
ALMEKINDERS, C

MULTIPLE CROPPING
PAPENDICK R; SANCHEZ A

AFRICAN INDIGINENOUS VEGETABLES IN URBAN AGRICULTURE
SHACKLETON, C M

MAIZE CULTIVATION AND FERTILIZATION
SCHRIMPF

CITRUS JUICES TRENDS AND PROSPECTS IN WORLD PRODUCTION AND INTERNATIONAL TRADE
DAVID R

FRESH FRUITS AND VEGETABLES
BUNNIK, J SC

GLOBAL EVALUATION OF MUSA GERMPLASM FOR RESISTANCE TO FUSARIUM WILT, MY
CARLIER J

A STUDY IN THE DETERMINATION OF QUALITY VALUE RELATIONSHIPS IN RICE
CONWAY J.A

THE CONSTRUCTION AND OPERATION OF A RICE HUSK BURNER
ROBINSON A.P

THE TOMATO CROP
ARTHERTON J.G; ROBERTS

THE DYNAMICS OF CASSAVA PRODUCTION IN AFRICA
NWEKE, F

MAKING THE MOST MUSA
CLAUDINE, P; RUTH, R

CANE SUGAR THE SMALL SCALE PROCESSING OPTION
KAPLINSKY, R

THE INTERNATIONAL MAGAZINE ON BANANA AND PLANTAIN
DAVID, J

PANICLE INSECT PESTS SORGHUM AND PEARL MILLET
MWANZE KF; YOUM O

DESCRIPTORS FOR PEARL MILLET
PENNISETUM, G

SORGHUM AND MILLETS COMMODITY AND RESEARCH ENVIRONMENT
PARODA R.S

CEREAL POLICIES REVIEW
GREENFIELD J.N

USES OF SORGHUM AND MILLET
DENDY D.A

INDUSTRIAL UTILIZATION OF SORGHUM
GUGLANI G.K

A POGRAM OF PARTNERSHIP
EICHER C.K

STRENGTHENING SORGHUM RESEARCH COLLABORATION IN ASIA
STENHOUSE JW

RICE TRENDS IN SUB-SAHARAN AFRICA
YOUDEOWEI, A

EMERGING ROLES OF THE PUBLIC AND PRIVATE SECTORS OF MAIZE SEED IDUSTRIES IN THE DEVELOPING WORLD
PEREIRA, L

IDENTIFICATION AND UTILIZATION OF SMUT RESISTANCE IN PEARL MILLET
THAKUR R.P

RICE IN ASIA IS IT BECOMING A COMMERCIAL GOOD
HOWARTH, B E

THE GLOBAL WHEAT IMPROVEMENT SYSTEM
MYWISH, M

COMPENDIUM OF WHEAT DISEASES SECOND EDITION
WIESE M

PARTENERS IN IMPACT ASSESSMENT
BAIDU, F J

IMPACT FROM INVESTMENTS IN CROP BREEDING
ROHRBACH DD

A RESEARCH AND NETWORK STRATEGY FOR SUSTAINABLE SORGHUM AND PEARL MILLET PRODUCTION SYSTEMS FOR LATIN AMERICA
RUIZ, G

IMPACT OF GERMPLASM RESEARCH SPILLOVERS
KAMUANGA M

THE WORLD SORGHUM AND MILLET ECONOMIES
ANDHRA, P

RICE RESEARCH AND PRODUCTION IN THE 21ST CENTURY
Rockwood, W.G

STRATEGIC CHOICES AND RESEARCH PRIORITIES FOR THE ASARECA SUB-REGION FOOD CROPS LIVESTOCK NATURAL RESOURCES MANAGEMENT
SEYFU, K

UTILIZING WILD GRASS BIODIVERSITY IN WHEAT IMPROVEMENT
MAJEEB, K

MAIZE RESEARCH
SURINDER K

INVESTING IN ORPHAN CROPS TO IMPROVE FOOD AND LIVELIHOOD SECURITY OF UGANDA RURAL POOR
NALUWAIRO, R

A MANUAL OF RICE SEED HEALTH TESTING
INNES, R

FINE OR FLAVOR COCOA
SCHEU JJ

COMPENDIUM OF ALFALFA DISEASES
STUTEVILLE, D L.

COTTON IN AFRICA
NICOLAS, V

SYSTEMATICS AND BIOGEOGRAPHY OF ARALIA REVISION OF SECTION
JUN WEN

AFRICAN CROP SCIENCE
JUYUS, R

FINE OR FLAVOR COCOA AN OVERVIEW OF WORLD PRODUCTION AND TRADE
SCHEU JJ

COMPENDIUM OF WHEAT DISEASES
CASTRO, C

A RICE VILLAGE SAGA
HAYAMI, Y

PHARLAP A CROPPING SYSTEMS STUDY ON RAINED RICE FARMS IN ANTIQUE PROVINCE
TASIC R.C

PROCCESSING POTENTIAL FOR CASSAVA PRODUCTION GROWTH IN AFRICA
NWEKE, F

THE WORLD SORGHUM AND MILLET ECONOMIES
FAO

THE TRAINING AND VISIT SYSTEM AND THE LINKS BETWEEN RICE RESEARCH AND EXTENSION IN THE MATARA DISTRICT OF SRILANKA
SEEGERS, S

A CENTURY OF RICE IMPROVEMENT IN BURMA
WIN KHIN

WHEAT HEALTH MANAGEMENT
COOK, J; VOGEL, N

DROUGHT FRONTIERS IN RICE CROP IMPROVEMENT FOR INCREASED RAINFED PRODUCTION
SERRAJ R.

A PARTNERSHIP IN RICE RESEARCH
DENNING GL.

HETEROSIS AND HYBRID
VIRMANI S.S

THE DYNAMICS OF IRRIGATED RICE FARMING IN MALI
LOES, K

ERADICATION STRATEGY FOR MAIZE DOWNY MILDEW
CARDWELL KF

GRAIN QUALITY EVALUATION OF WORLD RICES
JULIANO B.O

AFRICA INLAND FISHERIES THE MANAGEMENT CHALLENGE
GEHEB, K

ROOTS AND TUBERS FOR THE 21 CENTURY.
ROSEGRANT, M

REDESIGNING RICE PHOTOSYNTHESIS TO INCRE4ASE YIELD
SHEEHY J.E

SUSTAINABILITY OF RICE IN THE GLOBAL FOOD SYSTEM
DOWLING N.G

PROCESSING TROPICAL CROPS
ASIEDU JJ

TECHNOLOGY OF HYBRID RICE PRODUCTION
LONG PING YUAN

HYBRID RICE BREEDING NANUAL
CASL C.L; TOLEDO R.S

USE OF PHEROMONE TRAPS FOR MONITORING THYE MILLET STEM BORER
RUSSELl, Y

FIELD PROBLEMS OF TROPICAL RICE
SWAMINATHAN M.S

RICE FEEDING INSECTS OF TROPICAL ASIA
SHEPARD B.M

CONIESTA IGNEFUSALIS
HARIS K.M

WEEDS OF RICE IN ASIA
CATON B.P

MANAGING AGLN CROPS IN RICE BASED CROPPING SYSTEMS
FARIS D.G

RICE ALMANAC
MACLEAN, J

SORGHUM AND MILLETS IN HUMAN NUTRITION
LUBIN, D

CONSUMER DEMAND FOR RICE GRAIN QUALITY
DUFF U D; JULIANO B.O

PRODUCT DEVELOPMENT FOR ROOT AND TUBER CROPS
GREGORY, S J.

ADOPTION AND DIFFUSION OF MODERN RICE VARIETIES IN BANGLADESH AND EASTERN INDIA
HOSSAIN M.

RAINFED LOWLAND RICE;ADVANCES IN NUTRIENT MANAGENT RESEARCH
LADHA J.K

CLIMATE CHANGE AND RICE
KLAUS, L J

RAINFED LOWLAND RICE
FLINN, A

AFRICAN CROP SCIENCE JOURNAL
Ekwamu, Adipala ; Patel, B K
ANNUAL FOOD CROPS RESEARCH PLAN FOR UGANDA
Ministry of Agriculture

FOOD LOSS PREVENTION IN PERISHABLE CROPS
UNEP

CROP YIELD RESPONSE TO WATER.
HSIANO, C.T; FERERES, E

APPLE PREODUCTION AND MANAGEMENT.
NARO

ROBUSTA COFFEE HAND BOOK
MAAIF

GENETIC CHANGE IN FARMER-RECYCLED MAIZE SEED; A REVIEW OF THE EVIDENCE.
MORRIS, L.M; BECK, D

IMPROVEMENT OF SOIL FERTILITY AND WEED SUPPRESSION THROUGH LEGUME BASED TECHNOLOGIES.
OYETUNDE, A

CROP GENETIC DIVERSITY IN THE FIELD AND ON THE FARM.
SCOTT, J; HODGIN, T

ENDAGIRIRO ERI ABALIMI KYOKUSIMBA NOKULABIRIRA PPAMBA ABALE ATE ABE WA MUTINDO.
NARO

DAIRY HUSBANDRY GUIDE FOR ZERO GRAZING FARMERS.
ACC

PUSH PULL IMPROVING LIVELIHOODS.
KHAN, R; PITCHAR, J

MERGER OF WARDA TASK FORCES AND CORAF RICE NETWORK.
MWALOZIE, M; ABDOULAYE, A

COFFEE REHABILITATION PROGRAMME.
KYAMULESIRE, A.R; NAMUDDU, F

FOOD CROPS AND SHORTAGES.
FAO

RICE TODAY.
AUREUS, M

THE SUSTAINABILITY OF RICE FARMING
COHEN, M

ENRICHED COMPOST FOR HIGHER YIELDS.
BWIBO, M

TECHNICAL MEETING ON BENEFITS AND RISKS OF TRANSGENIC HERBICIDE RESISTANT CROPS.
HURLE, K; DARMENCY, H

NEGLECTED CROPS; PROVIDING THE POTENTIAL.
LAISER, L

CROP SCIENCE A PUBLICATION OF THE CROP SCIENCE SOCIETY OF AMERICA.
BOURLAND, F.M; WATSON, J

AFRICAN CROP SCIENCE CONFERENCE PROCEEDINGS.
ADIPALA, E; TENYWA, J.S

RICE TODAY
LAZARO, J; ZWINGER, J

CLONAL ROBUSTA COFFEE FARMING.
MAGAMBO, M.S

FOURTH AFRICAN CROP SCIENCE CONFERENCE; PROGRAMME AND ABSTRACTS OCTOBER 11-14, 1999 CASABLANCA, MOROCCO.
MOHAMMED, I; EKWAMU, A

NILE VALLEY AND RED SEA REGIONAL PROGRAM ON COOL SEASON FOOD LEGUMES AND CEREALS; PROBLEM SOLVING REGIONAL NETWORKS.
MAHMOOD, S; HADDAD, N

GROUNDNUT GROWERS GUIDE; REVISED EDITION NARO
NARO

ROOT AND TUBER CROPS, PLANTAIN AND BANANAS IN DEVELOPING COUNTRIES; CHALLENGES AND OPPORTUNITIES.
FRIEDHEIM, B

DNA MARKER ASSISTED IMPROVEMENT OF THE STAPLE CROPS OF SUB-SAHARAN AFRICA.
CROUCH, J; TENKOUANO, A

POLICY SUPPORT GUIDELINES FOR THE PROMOTION OF SUSTAINABLE PRODUCTION INTENSIFICATION AND ECOSYSTEM SERVICES.
CAMPANHOLA, C

INTEGRATED CROP AND LAND MANAGEMENT IN THE HILLY TERRAINS OF CENTRAL AMERICA; CONCEPTS, STRATEGIES, AND TECHNICAL OPTIONS.
BARBER, R

SOYBEAN IN CROPPING SYSTEMS IN INDIA.
BHATNAGAR, P.S; JOSHI, O.P

IMPROVING THE PRODUCTIVITY AND SUSTAINABILITY OF RICE WHEAT SYSTEMS OF THE INDO-GANGETIC PLAINS; A SYNTHESIS OFNARS-IRRI PARTNERSHIP RESEARCH.
LADHA, J.K; FISCHER, K.S; HOBBS, P.R

CLONAL ROBUSTA COFFEE FARMING.
MAGAMBO, M.J
Crops

Study 2
Geofrey Kapalaga; Florence N Kivunike; Daudi Jjingo
Programming
Geofrey Kapalaga
Dept of Agriculture

AGRICULTURE AND THE ENVIRONMENT: PERSPECTIVE ON SUSTAINABLE RURAL DEVELOPMENT
Ernst, L; Hans, B; Peter, H; McCalla A

EVOLUTION OF PROVISION OF TREE SEED IN EXTENSION PROGRAMMES
Christine, H; William, O

COMPENDIUM OF FOOD ADDITIVE SPECIFICATIONS
Jecfa

HEALING WOUNDS
Surendra, V; Mark, W

AGRICULTURAL REVIEW

EMERGENCY ACTION PLAN FOR CONTROL OF WATER HYACINTH

FARMING SYSTEMS APPROACH AND POSTCONFLICT RECONSTRUCTION
Schelhas, B

UGANDA AGRICULTURE

UGANDA NATIONAL CENSUS OF AGRICULTURE AND LIVESTOCK
Ssenyonga, G S Z

PROGRESS REPORT PREPARED FOR THE 3RD TRIPARTITE REVIEW MEETING TO BE HRLD ON 21ST NOV. 1990
Otage, W O; Gachuki, P N

ANNUAL REPORT OF THE DEPARTMENT OF AGRICULTURE

ANNUAL REPORT OF THE AGRICLTURE DAPARTMENT
KAKONGE, J B T

DEPARTMENT OF AGRICULTURE RECORD OF INVESTIGATIONS
Doka, J B M

ANNUAL REPORT OF THE AGRICULTURE DEPARTMENT
Kakonge, J B T

REPORT OF THE AGRICULTURAL PRODUCTIVITY COMMITTEE
Watson, T Y; Babiiha, J

BUDGET POLICY STATEMENT 1991/92 TO THE NATIONAL RESISTANCE COUNCIL

DEPARTMENT OF AGRICULTURE RECORD OF INVESTIGATIONS
Doka, J B M

PROGRESS REPORTS FROM EXPERIMENT STATIONS: COTTON RESEARCH STATION NAMULONGE, UGANDA
Hutchinson, J B

AGRICULTURE IN KOREA
Choi Sei-Kyun

WORK PLAN AND BUDGET JULY 2005-JUNE 2006

REHABILITATION OF AGRICULTURAL MARKETING
Fao

SOME ASPECTS OF VEGETABLE CROP PRODUCTION
Cantwell, J

SMALLHOLDER VEGETABLE OILS DEVELOPMENT SUPPORT PROJECT
Semple, J

FINAL DRAFT WORK PLAN AND BUDGET
Arc

REGULATIONS GOVERNING ENTRY OF PLANT MATERIALS INTO UGANDA
M.o.A

REPORT OF THE THIRTEENTH SESSION OF THE COMMISSION AND OF THE TENTH SESSION OF THE COMMITTEE FOR THE DEVELOPMENT AND MANAGEMENT OF FISHERIES IN THE LESSER ANTILLES
Fao

AGRICULTURE IN THE TROPICS
Webster , C C ; Wilson , P N

AGRICULTURE AND THE ENVIRONMENT PERSPECTIVES ON SUSTAINABLE RURAL DEVELOPMENT
LUTZ, E

AGRICULTURAL EQUIPMENT SUPPLIES TO UGANDA

UGANDA AGRICULTURE
ETURU, L; KAKAMA, K.N

THE STATE OF THE WORLDS PLANT GENETIC RESOURCES FOR FOOD AND AGRICULTURE.
THOMAS, G; ACHEAMPONG, E

STEYR 8055
PTO

SOCIO-ECONOMIC SURVEY OF COMMUNITIES IN THE BUFFER ZONE OF LAKE MBURO NATIONAL PARK.
MARQUARDT, M

COMBINING SYSTEMATIC AND PARTCIPATORY APPROACHES FOR DEVELOPING AND PROMOTING STRATEGIES FOR SUSTAINABLE LAND AND WATER MANAGEMENT
ORUKA, F

LAND MANAGEMENT IN UGANDA; CHARACTERIZATION OF PROBLEMS AND HYPOTHESES ABOUT CAUSES AND STRATEGIES FOR IMPROVEMENT
SSERUNKUUMA D

AGROFORESTRY RESEARCH NETWORK FOR THE BIMODL RAINFALL HIGHLANDS OF EAST AND CENTRAL AFRICA.(AFRENA E AND C )
TORQUEBIAU, E

FUEL WOOD AS A SOURCE OF ENERGY IN DEVELOPING COUNTRIES; A VIEW OF THE SITUATION, AND THE POSSIBLE SOLUTIONS TO THE ENERGY PROBLEM
TURYATUNGA, F

STRATEGY AND TECHNOLOGY FOR THE INDUSTRY FOOD AND BEVERAGES
UTI

FARMERS TOOLS
MOELLER, O

YELLOW FARM MANAGEMENT CERTIFICATE COURSE
FAO

MALE-FEMALE DIFFERENCES IN AGRICULTURAL PRODUCTIVITY ;METHADOLOGICAL ISSUES AND EMPIRICAL EVIDENCE
QUISUMBING, A.R

WOMEN FARMERS; FOCUS FOR GROWTH
MELAINIE, R; KRIS, R

LAND TENURE AND AGRICULTURAL DEVELOPMENT IN UGANDA
FAO

FOODS RESOURCE BASE CHALLENGE
CORE, P

A REPORT ON THE RAPID RURAL APPRAISAL UNDERTAKEN IN AND AROUND TORO GAME RESERVE.
NYIRAMAHORO, M

LAND DISPUTES IN UGANDAS; AN OVERVIEW OF THE TYPES OF LAND DISPUTES AND THE DISPUTE SETTLEMENT FORA.
KIGULA, J

REPORT OF THE ROUND TABLE ON THE DYNAMICS OF LAND TENURE AND AGRARIAN SYSTEMS IN AFRICA.
BOKANDJO, S.M

ANNUAL REPORT 1993 AGRICULTURAL COMMUNICATION CENTRE
MUBIRU, E

REPORT ON THE UGANDA NATIONAL CENSUS OF AGRICULTURE AND LIVESTOCK 1990-1991.
SEKITOLEKO, V.B

INDIGENOUS AGROFORESTRY SYSTEMS IN SOUTHERN LUWERO DISTRICT UGANDA
NIELSEN, F

UGANDA NATIONAL AGRICULTURAL RESEARCH STRATEGY AND PLAN.
ISNAR

MICRO-LEVEL ANALYSIS OF SEASONAL TRENDS, FARMERS PERCEPTION OF CLIMATE CHANGE AND ADAPTATION STRATEGIES IN EASTERN UGANDA.
MUBIRU, D; AGONA. A

CONSULTATIVE GROUP ON INTERNATIONAL AGRICULTURE RESEARCH
CRAWFORD, J

THE SECRET OF GROWING RECORD SIZED BANANA BENCHES FOR HEALTH AND WEALTH
TIBAZALIKA, E.A

PLANT PROPAGATION PRINCIPLES AND PRACTICES
HARTMANN, T.H; DAVIES, T.F

THE BIRTH OF IGADD
HASSAN, H.

DISTRIBUTION OF FRUITS AND VEGETABLES
UNDP

EVALUATION OF TECHNICAL AND FINANCIAL PROPOSALS FOR CONSULTING SERVICES.
MAAIF

MULTI-FARM USE OF AGRICULTURAL MACHINERY.
FAO

THE REPORT OF THE AGRICULTURAL MECHANISATION COMMITTEE.
OPIO, T.K

CHARCOAL BRIQUTTE PRODUCTION PROJECT CARRIED OUT AT NAMULISA COFFEE FACTORY OF BUSOGA GROWERS COOPERATIVE UNION.
OLORO, M

BUSH CLEARING HIRE SERVICE REPLACEMENT AND EXPANSION PROJECT
MAAR

LAND TENURE AND AGRICULTURAL DEVELOPMENT IN UGANDA.
MAKERERE INSTITUTE OF SOCIAL RESEARCH

ARAPAI AGRICULTURAL COLLEGE FARM BUILDING AND STRUCTURES COURSE MATERIALS.
FURGUSON, G.E.

RAISING INCOME THROUGH PIG FARMING
WAISWA, C; SAAMANYA, J.P

REPORT ON THE UGANDA NATIONAL CENSUS OF AGRICULTURE AND LIVESTOCK 1990-1991 SUPPLEMENTARY VOLUME.
SEKITOLEKO, V

LAND TENURE AND SOIL CONSERVATION.
SEBIKEJJE, L.P.K; SSALI, C.K

MINISTRY OF AGRICULTURE, ANIMAL INDUSTRY AND FISHERIES DEVELOPMENT STRATEGY.
MAAIF

NUTRIENT MANAGEMENT GUIDE FOR MAIZE, COTTON, COFFE, AND BANANA.
IFDC

SOILS AND PRESENT LAND USE OF KYOTERA AND KAKUUTO MICROCATCHMENTS RAKAI DISTRICT.
SSALI, C.K; ISABIRYE, M

EVOLUTION OF PROVISION OF TREE SEED IN EXTENSION PROGRAMMES.
CHRISTIN, H

AGRICULTURE IN UGANDA VOLUME 1
MUKIIBI, J

REHABILITATION OF AGRICULTURAL MARKETING
FAO

GROWING CABBAGES IN UGANDA.
MAIF

SUMMARY REPORT TO THE GOVERNMENT OF UGANDA ON THE LIVESTOCK DEVELOPMENT MISSION FIELD DURING 1975-1976
PIERRE, MM; WOLDEMARIAM, M

PROSPECTS FOR COCOA-GROWING IN UGANDA AND ZANZIBAR.
URQUHART, D.H

A REPORT OF THE PEST SURVEYS IN THE DISTRICTS OF KABALE, BUSHENYI, KABAROLE, MASINDI, JINJA, IGANGA, TORORO AND MBALE DURING THE MONTHS OF OCTOBER, NOVEMBER AND DECEMBER, 1990.
BALIDDAWA, W.C

CREDIT SCHEME FOR SMALL AND MEDIUM SCALE DAIRY FARMERS IN UGANDA
DDC

UGANDA PROTECTORATE ANNUAL REPORT OF THE DEPARTMENT OF AGRICULTURE FOR THE YEAR ENDED 31ST DECEMBER, 1958.
GOVERNOR

IMPROVING MANAGEMENT OF NATURAL RESOURCE FOR SUSTAINABLE RAINFED AGRICULTURE
IWMI

REPORT ON UGANDA NATIONAL CENSUS OF AGRICULTURE AND LIVESTOCK 1990-1991
SEKITOLEKO, V.B

ANNUAL REPORT OF THE DEPARTMENTOF AGRICULTURE FOR THE YEAR ENDED 31ST DECEMBER 1959
GOVERNOR

REPORT ON UGANDA NATIONAL CENSUS OF AGRICULTURE AND LIVESTOCK VOLUME 5; LIVESTOCK CHARACTERISTICS.
SEKITOLEKO, V.B

GROWING CABBAGES IN UGANDA.
NARO

CONSULTATIVE GROUP ON INTERNATIONAL AGRICULTURE RESEARCH.
CRONFORD, J

REPORT ON UGANDA CENSUS OF AGRICULTURE VOL 1-4.
MUKIIBI, L.

AGRICULTURAL POLICY ANALYSIS PROJECT, PHASE 111.
ELLSWORTH, L

AGRICULTURE IN UGANDA VOLUME 1 GENERAL INFORMATION.
MUKIIBI, J.K

REPORT ON UGANDA CENSUS OF AGRICULTURE VOLUME 1 KARAMOJA CENSUS OF LIVESTOCK 1963.
MORRIS,D

PARTNERS IN RESEARCH FOR DEVELOPMENT.
CTA

AGRICULTURE IN KOREA.
KOREA RURAL ECONOMIC

PRINCIPLES AND PRACTICE FOR AGRICULTURAL RESEARCH EVALUATION AND PRIORITY SETTING.
ALSTON, M.J;PARDEY, P.G

SCIENCE FOR AGRICULTURAL DEVELOPMENT.
BINSWANGER, P.H; HAZELL, P

AGRICULTURE AND THE ENVIRONMENT.
ERNST, L

DEVELOPMENT OF THE HORTICULTURE INDUSTRY
CALLISTUS, B.

INTERNATIONAL POTATO CENTRE PROGRAM REPORT 1995-1996.
EZETA, F; LAGNAOUUI, A.

UGANDA JOURNAL NOD AGRICULTURAL SCIENCES
LUBEGA, M

PARTNERS IN RESEARCH FOR DEVELOPMENT.
ACIAR

PROCEEDINGS OF THE 3RD FARA GENERAL ASSEMBLY ENTEBBE, UGANDA, 6-12 JUNE 2005.
KAUFMANN, V.R; NDULI, N

DEVELOPING SKILLS TO INFLUENCE ADOPTION OF AGRICULTURAL POLICY ANALYSIS RESULTS.
OLUOCH, K.W; MBECHE, I

UGANDA JOURNAL OF AGRICULTURAL SCIENCES.
ODOGOLA, W; KYETERE, T.D

REPORT OF THE SCIENCE FORUM ON CGIAR PRIORITIES ; SCIENCE FOR THE POOR.
CHAPMAN, R

CONSULTATIVE GROUP ON INTERNATIONAL AGRICULTURAL RESEARCH SCIENNCE COUNCIL
LANTIN, M

INTENSIFYING PRODUCTION AMONG SMALLHOLDER FARMERS; THE IMPACT OF IMPROVED CLIMBING BEANS IN RWANDA.
NYABYENDA, P; MUNYANESA, S

INTERNATIONAL NETWORK FOR THE IMPROVEMENT OF BANANA AND PLANTAIN.
MCNICOLL, A

SNAP BEANS IN THE DEVELOPING WORLD.
JANSSEN, W; HENRY, G

THE NATIONAL AGRICULTURAL RESEARCH POLICY.
MUGERWA, K.W

FARMERS AND RESEARCHERS; A PROGRESSIVE PARTNERSHIP.
COLLISON, L

UGANDA JOURNAL OF AGRICVULTURAL SCIENCES
LUBEGA, A

CSIR RURAL TECHNOLOGIES.
CSIR

SCIENCE FOR AGRICULTURAL DEVELOPMENT CHANGING CONTEXTS, NEW OPPORTUNITIES.
CGIAR

IMPROVING MANAGEMENT OF NATURAL RESOURCES FOR SUSTAINABLE RAINFED AGRICULTURE.
IWWI

A SUDY OF INDEGENOUS KNOWLEDGE OF SOIL AND WATER, TOROMO VILLAGE, KATAKWI DISTRICT, UGANDA.
OTTO, D

GROWING CABBAGES IN UGANDA
FAO

STRESSED ECOSYSTEMS AND SUSTAINABLE AGRICULTURE.
VIRMAN, S.M; KATYAL, H

TECHNOLOGICAL INNOVATION IN AGRICULTURE.
ALAIN, D.J;

NIGERIA PROFILE OF AGRICULTURAL POTENTIAL.
MARITIME, C;

AGRICULTURAL TECHNOLOGY IN SUB SAHARAN AFRICA.
SUZANNE, G; BROSSIER, J; COLLINS, C.J

USE OF PHOSPHATE ROCKS FOR SUSTAINABLE AGRICULTURE.
ZAPATA, F; ROY, R.N

GATSBY OCCASIONAL PAPER MASTERING MOSAIC; THE FIGHT FOR CASSAVA PRODUCTION IN UGANDA DECEMBER 1997.
OTIM, W

SUSTAINABLE AGRICULTURE; SOME CONTRIBUTION OF GCPF MEMBER COMPANIES AND ASSOCIATIONS.
DOLLACKER, A

AGRICULTURE, FORESTRY AND FISHERIES.
DICKSON, C; JORGENSEN, K

FERTILIZERS AND THEIR USE.
FAO

REPORT OF THE PANEL OF EMINET EXPERTS ON ETHICS IN FOOD AND AGRICULTURE.
ASBJORN, E

IMPACT OF THE URUGUAY ROUND ON AGRICULTURE.
PERKINS, R.J

INSTITUTIONALIZATION OF A FARMING SYSTEMS APPROACH TO DEVELOPMENT.
FRIEDRICH, K.H

AID TO AGRICULTURE; REVERSING THE DECLINE.
HOPKINS, R; RAJUL, P
.jpg)
AGRICULTURE IN THE NEWS JANUARY TO APRIL 1996
SEEMANA, D

NATIONAL AGRICULTURAL RESEARCH SYSTEM REFORM PROGRAMME.
NARS

THE STATE OF FOOD AND AGRICULTURE.
MAINA, S

VETERINARY EDUCATION.
BLACKBURN, JT

GREEN MANURE COVER CROPS AND CROP ROTATION IN CONSERVATION AGRICULTURE ON SMALL FARMS.
FLORENTIN, M.A; MELISSA, J

IMPACT OF UGANDA NATIONAL AGRICULTURAL ADVISORY SERVICES PROGRAM.
OKECHO, E

STRATEGIES AND PRIORITIES FOR AFRICAN AGRICULTURE ECONOMY WIDE PERSPECTIVES FROM COUNTRY STUDIES.
XINSHEN, D; SHENGGEN,F

CLONAL ROBUSTA COFFEE FARMING.
MAGAMBO, M.J

DRYING AGRICULTURAL PRODUCE.
CHIDONG, M

DEVELOPING WORLD AGRICULTURE.
RANNEY, J.W; HORTON, D.E

DIRECTORY FOR AFRICAN AGRICULTURAL RESEARCH 2001.
KEMSLEY, E.J; WAUGH, E

YIELD GAPS AND POTENTIAL AGRICULTURAL GROWTH IN WEST AND CENTRAL AFRICA
ALEJANDRRO, N.P; JORDAN, C; MAGALHAES, E; LIANGZHI, Y
Economics

Economics Test
Test

USING ECONOMETRICS : A PRACTICAL GUIDE
Studenmund, A H

STATISTICS FOR SPATIAL DATA REVISED EDITION
Cressie, N A C

GLOBAL ECONOMIC PROSPECTS : AND THE DEVELOPING COUNTRIES
World Bank

JOURNAL OF ECONOMIC ENTOMOLOGY
Butts, R A; Ghidhu, G M; Stark, J D; Todd, J l

ENVIRONMENTAL ECONOMICS : A CRITICAL OVERVIEW
Gilpin, A

ECONOMICS OF PROTECTED AREAS : A NEW LOOK AT BENEFITS AND COSTS
Dixon, J A; Serman, P B

GUIDELINES ON SOCIO-ECONOMIC INDICATORS FOR MONITORING AND EVALUATING AGRARIAN REFORM AND RURAL DEVELOPMENT
FAO

ELEPHANTS, ECONOMICS AND IVORY
EDWARD, B,B; BURGESS, C

BACKGROUND TO THE BUDGET 1996-1997.
CFA

LAND RESOURCE BIBLIOGRAPHY.
CARDOW, L

FOOD POLICY ANALYSIS, 1975-1995; REFLECTIONS BY A PRACTITIONER.
FLCON, P.W

THE RISING SEAS.
INCE, M

BRAVE NEW THIRD WORLD STRATEGIES FOR SURVIVAL IN THE GLOBAL ECONOMY.
BELLO, W

DECENTRALISATION AND TRANSFORMATION OF GOVERNANCE IN UGANDA.
ASIIMWE, D; NAKANYIKE, B

RESEARCH MANAGEMENT FOR DEVELOPMENT.
NICKEL, J

INPUT/ OUTPUT TABLES FOR UGANDA 1989-1992.
REPUBLIC OF UGANDA.

APPLIED STATISTICS AND FIELD EXPERIMENTATION.
OSIRU, D.S

SEASONAL BREEDING AND MIGRATIONS OF THE DESERT LOCUST IN THE NORTH EASTERN AFRICA AND THE MIDDLE EAST.
DAVIES, D E

SOCIAL PROTECTION AND CASH TRANSFERS TO STRENGTHEN FAMILIES AFFECTED BY HIV AND AIDS.
BASSET, L; ADATO, M

ECONOMIC POLICY RESEARCH BULLETIN
OPIO, F; KITABIRE, D

HOW GOOD THE EARTH.
SAU

METHODOLOGIES FOR STUDYING AGRICULTURAL MARKETS IN DEVELOPING COUNTRIES.
MARGRATH, P

SOLUBLE COFFEE; TECHNICAL AND MARKETING OPPORTUNITIES AND CONSTRAINTS FOR ORIGIN PRODUCERS.
HONE, A

TRENDS IN REAL FOOD PRICES IN SIX SUB-SAHARAN AFRICAN COUNTRIES.
JAYNE, T.S; MUKUMBU, M.

RICE MARKETING IN INDONESIA; METHODOLOGY, RESULTS AND IMPLICATIONS OF A RESEARCH STUDY.
ELLIS, F; TROTTHER, B

SUSTAINABLE HUMAN DEVELOPMENT AND MICROECONOMICS.
WIJKMAN, A

POVERTY POLICY PERSPECTIVES.
LAMUNYU, R; OKELO, T

TRANSPORT POLICY AND THE ENVIRONMENT.
PHILIPPE, B.J; BUTTON, K

AUSTRALIA AS A SOURCE OF BENEFICIAL INSECTS FOR BIOLOGICAL CONTROL.
FRANK, W

INTERNATIONAL CONFERENCE ON POPULATION AND DEVELOPMENT.
UN

CULTIVATING KNOWLEDGE GENETIC DIVERSITY, FARMER EXPERIMENTATION AND CROP RESEARCH.
WALTER, D; WELLARD, K

A NEW ERA OF TRANSFORMATION IN CHINA.
RAMATU, H; THURLOW, J

PROCEEDINGS OF THE 3RD FARA GENERAL ASSEMBLY ENTEBBE, UGANDA, 6-12 JUNE 2005.
NJABULO, N; MONTY, P

THE UGANDAN ECONOMY TODAY.
TUMUKWASIBWE, T; OBWONA, M

FOOD POLICY ANALYSIS, 1975-1995; REFLECTIONS BY A PRACTITIONER.
FALCON, W

REORIENTING THE COOPERATIVE STRUCTURE IN SELECTED EASTERN EUROPEAN COUNTRIES.
JUHAZ, J; FISCHER, K

ECONOMIC ASSESSMENT OF DESILTED SEDIMENT IN TERMS OF PLANT NUTRIENTS EQUIVALENT; A CASE STUDY IN THE MEDAK DISTRICT OF ANDHRA PRADESH.
PADMAJA, K.V; WANI, S.P

DIVERSITY DEMOCRANCY, AND HIGHER EDUCATION.
BECKHAM, E

STATEMENT BY MR EDOUARD SAOUMA DIRECTOR GENERAL OF THE FOOD AND AGRICULTURE ORGANIZATION OF THE UNITED NATIONS ON THE OCCASSION OF THE SEVENTH SESSION OF THE UN CONFERENCE ON TRADE AND DEVELOPMENT.
SAOUMA, E

INNOVATIVE APPROACHES TO AGRIBUSINESS DEVELOPMENT IN SUB-SAHARAN AFRICA.
MAXWELL, J; HOLTZMAN, J

FAO WORKSHOP ON NATIONAL PREPAREDNESS FOR ACUTE AND LARGE-SCALE FOOD SHORTAGES IN EASTERN AND SOUTHERN AFRICA.
HUDDLESTON, B

INSTITUTIONALIZING THE ROLE OF THE ECONOMIST IN NATIONAL AGRICULTURAL RESEARCH INSTITUTES.
BYERLEE,D; FRANZEL, S

FROST PROTECTION; FUNDAMENTALS, PRACTICE, AND ECONOMICS.
RICHARD, L.S; PAULO, J.M

REPORT OF AN INDEPENDENT WORKING GROUP ON THE UGANDAN ECONOMY.
HELLEINER, G; KALEMA, W

AN ECONOMIC SURVEY OF FARMING IN A WET, LONG-GRASS AREA OF TORO
TRAIL, R

LAND FOOD AND PEOPLE.
SAOUMA, E

REGIONAL ASSISTANCE TO TRAINING IN WILDLIFE AND PROTECTED AREA MANAGEMENT IN AFRICA.
FAO

DEMAND-SIDE CONSTRAINTS AND STRUCTURAL ADJUSTMENT IN SUB-SAHARAN AFRICAN COUNTRIES.
HARTWIG, S; ALBERTO, C

THE ROLE OF FOOD SAFETY IN HEALTH AND DEVELOPMENT.
BRYAN, F.L; CHARLES, R.H

AGRICULTURAL TRADE BETWEEN DEVELOPING COUNTRIES.; PATTERNS AND FUTURE POSSIBILITIES.
ISLAM, N

EXPERT CONSULTATION ON CROP INSURANCE ITS PLACE IN DEVELOPMENT.
FAO

UGANDA CENSUS OF AGRICULTURE 2008/2009.
MUKASA, J

AFRICAN REVIEW OF MONEY FINANCE AND BANKING
MAURI, A;

HANDBOOK OF ECONOMIC ACCOUNTS FOR AGRICULTURE.
FAO

ENDING HUNGER THE CYPRUS INITIATIVE.
TEMU, P; ALAIN, N

EVALUATING DEMAND FOR CALORIES FOR URBAN AND RURAL POPULATIONS IN THE PHILLIPINES; IMPLICATIONS FOR NUTRITION POLICY UNDER ECONOMIC RECOVERY.
BOUIS, H.E

FOOD TODAY AND TOMORROW.
CGIAR

THE LOCUST AND GRASSHOPPER AGRICULTURAL MANUAL.
HASKELL, P.T
.jpg)
IMMS GENERAL TEXTBOOK OF ENTOMOLOGY TENTH EDITION.
RICHARDS, O.W; DAVIS, R.G

URBANIZATION, AGRICULTURAL DEVELOPMENT, AND LAND ALLOCATION.
BHADRA, D; ANTONIO, S.P

SMALL SCALE FOOD PRODUCTION; THE HUMAN ELEMENT.
DYER, L.A

AFRICAN REVIEW OF MONEY FINANCE AND BANKING.
ARNALDO, M

MODELING THE DEMAND FOR CROP INSURANCE.
HOJJAT, B; BOCKSTAEL, E.N

PRECAUTIONARY SAVING, CREDIT CONSTRAINTS, AND IRREVERSIBLE INVESTMENT; THEORY AND EVIDENCE FROM SEMIARID INDIA.
FAFCHAMPS, M

TRAINING PROGRAMS 1986-1987.
KINDEL,KK

VISUAL PRESENTATION OF RESEARCH RESULTS.
CARMEN, S

ECONOMIC POLICY BULLETIN.
TUMUSIIME, M

ECONOMIC POLICY RESEARCH BULLETIN
OBWONA, M

NAMIBIA OUTLOOK; LAND AND SOCIETY ECONOMY EDUCATION HEALTH AGRICULTURE EXTERNAL ASSISTANCE.
BANNISTER, A

QUARTERLY BULLETIN OF STATISTICS.
FAO

ADOPTION OF CONTOUR HEDGEROWS BY UPLAND FARMERS IN THE PHILIPPINES; AN ECONOMIC ANALYSIS.
LAPAR, A. L; HERMAN, W

THE ECONOMIC DEVELOPMENT OF UGANDA.
DAVIS, D

REORIENTING THE COOPERATIVE STRUCTURE IN SELECTED EASTERN EUROPEAN COUNTRIES,
JUHASZ, J

PARTCIPATION IN PRACTICE
VIGIER, B; THOMAS, G

SCIENCE FOR DEVELOPMENT IN AFRICA.
ODHIAMBO, T; ISOUN, T.T

FOOD POLICY ANALYSIS.
TIMMER, P; FALCON, P.W

FOOD AND POPULATION.
BEKELE, M; SALAS, I.M

A STUDY OF COMMUNITY ATTITUDES, PERCEPTIONS AND INVOLVEMENT IN HEALTH COST SHARING IN TORORO.
OKONGO, B

AGRICULTURE AND PUBLIC HEALTH ASPECTS OF RADIOACTIVE CONTAMINATION IN NORMAL AND EMMERGENCY SITUATIONS.
POCHIN, EE

FOOD GRAIN PRICE STABILIZATION IN DEVELOPING COUNTRIES.
ISLAM, N; THOMAS, SAJI

HOW THIRD WORLD RURAL HOUSEHOLDS ADAPT TO DIETARY ENERGY STRESS.
LIPTON, M; PAYNE, P

LIBERALIZING TANZANIA FOOD TRADE.
BRYCESON, F; D

FROM AGRONOMIC DATA TO FARMER RECOMMENDATIONS.
BYERLEE, D

REGIONAL CONSULTATION ON THE ROLE OF AGRICULTURAL TRADE UNIONS IN RURAL DEVELOPMENT IN AFRICA.
HALIGAH, K; RIAD, M

EMPLOYMENT FOR POVERTY REDUCTION AND FOOD SECURITY.
BRAUN, J

A METHOD FOR FORECASTING EXPECTED ECONOMIC EFFECTS OF EXPORT-CROP RESEARCH IN PAPUA NEW GUINEA.
ANTONY, G; JOCK, R

SPILLOVER EFFECTS OF AGRICULTURAL RESEARCH; IMPORTANCE FOR RESEARCH POLICY AND INCORPORATION IN RESEARCH EVALUATION MODELS.
DAVIS, J

ACROSS-COMMODITY SPILLOVER EFFECTS OF RESEARCH AND OPPORTUNITY COSTS IN A MULTI-PRODUCT PRODUCTION ENVIRONMENT.
DAVIS, J; CYNTIA, B

THE STATE OF WORLD POPULATION.
SADIK, N

AND STILL THEY DANCEWOMEN, WAR AND THE STRUGGLE FOR CHANGE IN MOZAMBIQUE

INSTRUCTION FOR COUNTRY PILOT STUDIES ON ECONOMIC ACCOUNTS FOR AGRICULTURE, AND PUBLIC EXPENDITURE ON AGRICULTURE.
FAO

COLEACP TRADE DATA BANK.
COLEACP

THE PRODUCTION, CONSUMPTION AND PRICE DATABASE DEVELOPED FOR RESEARCH PRIORITY ASSESSMET IN PHILLIPINE AGRICULTURE.
MANGABAT, M.C; OLALO, C.C

THE CHALLENGE OF DEVELOPMENT AND POVERTY REDUCTION IN AFRICA.
KABBAJ, O

A LEGAL SUPPLEMENT TO; CZECHOSLOVAKIA A MARKET FOR PRODUCTS FROM DEVELOPING COUNTRIES.
ITC

TOWARDS A REGIONAL SYSTEM OF TECHNOLOGY INNOVATION FOR THE FOOD AND AGRICULTURAL SECTOR.
PINEIRO, M
PROMISE TO KEEP THE UNITED NATIONS DEVELOPMENT PROGRAMME.
UNDP

A CASE STUDY ANALYSING MONOSTRUCTED COFFEE ECONOMIES AND THE DUMPING PRICES OF PRIMARY AGRARIAN PRODUCTS.
ROLF, U; SHAKER, V

FOOD POLICY IN SUB-SAHARAN AFRICA.
ANDERSEN, P; HAZELL, P

THE ROLE OF THE WORLD BANK.
LIPTON, M

PARTNERSHIP FOR CAPACITY BUILDING IN AFRICA.
EDI

TRENDS IN THE AGRICULTURAL SECTOR.
DEPARTMENT OF AGRICULTURE

DEVELOPMENT STUDY UNIT DEPARTMENT OF SOCIAL ANTHROPOLOGY.
BERLEKOM, M; LARSSON, R

ASSESSING AGROECOLOGICAL AND COMMODITY PRIORITIES IN INTERNATIONAL AGRICULTURAL RESEARCH.
RYAN, G.J; DAVIS, S

FOOD FROM PEACE BREAKING THE LINKS BETWEEN CONFLICT AND HUNGER.
MESSER, E; COHEN, J.M

THE WORLD BANK EXTERNAL AFFAIRS UNIT, AFRICA REGION.
WORLD BANK

INVESTING IN AGRICULTURAL DEVELOPMENT.
LOFTAS, T

INTERNATIONAL MARKETS FOR AFRICAN AGRICULTURAL EXPORTS; AGRICULTURAL POLICY REFORM AND AGRICULTURAL EXPORT.
GORDON, P; MARTER, A

POPULATION GROWTH AND REPRODUCTION IN SUB-SAHARAN AFRICA TECHNICAL ANALYSES OF FERTILITY AND ITS CONSEQUENCES.
ACSADI, T.F; RODOLFO, A.B

FOOD SECURITY ISSUES IN SOUTHERN AFRICA.
INSTITUTE OF SOUTHERN AFRICA STUDIES.

EXPERT CONSULTATION ON LANDLESSNESS; DYNAMICS, PROBLEMS AND POLICIES.
GHOSE, A.K; IBRAHIM, E.I

OUTLOOK BERLIN.
WETZLAUGK,U

FAO HEADQUARTERS FACILITIES.
LUBIN, D

POTENTIAL POPULATION SUPPORTING CAPACITIES OF LANDS IN THE DEVELOPING WORLD.
HIGGINS, G.M; KASAM, A.H

AFRICA DEVELOPMENT CRISIS; AGRICULTURAL STAGNATION, POPULATION EXPLOSION, AND ENVIRONMENTAL DEGRADATION.
MCNAMARA, S.R

WORLD CONFERENCE ON AGRARIAN REFORM AND RURAL DEVELOPMENT.
FAO

REPORT OF THE FOURTH TECHNICAL CONSULTATION ON THE SCHEME FOR AGRICULTURAL CREDIT DEVELOPMENT.
BONTE, F.C

ADJUSTMENT IN AFRICA REFORMS, RESULTS, AND THE ROAD AHEAD.
IBADAN, B

FOOD SECURITY BEYOND 2000.
STANLEY, L

WORKSHOP ON DECENTRALIZED RURAL FINANCE.
BRANKS B

POPULATION AND THE WORLD BANK IMPLICATIONS FROM THE EIGHT CASE STUDIES.
ROVANI, Y

PROCEDINGS OF THE INTERNATIONAL WORKSHOP ON LAND TENURE ADMINISTRATION..
YUKO, T; MASATO, N

LABOR, LAND, FOOD AND FARMING; A HOUSEHOLD ANALYSIS OF URBAN AGRICULTURE IN KAMPALA, UGANDA.
MAXWELL,D

ICRISAT IN THE 21ST CENTURY; TOWARDS SUSTAINABLE FOOD SECURITY.
SWAWKI, M.B
.jpg)
KAMPALA BIOTECH CONFERENCE.
MAKARA, A

MEETING THE POPULATION CHALLENGE.
SADIK, N

AGRICULTURAL GROWTH LINKAGES IN SUB-SAHARAN AFRICA.
DELGADO, C.L; HOPKINS, J

FOOD AND ENVIRONMENT.
SAOUMA,E

MOBILIZING SCIENCE FOR GLOBAL FOOD SECURITY.
COHEN, J; SMITH, R

BLUEPRINT FOR A GREEN ECONOMY.
MARKANDYA, A

WORLD FOOD TRENDS AND FUTURE FOOD SECURITY.
ANDERSEN, P

GENERAL TECHNICAL ASSISTANCE PROGRAMME.
KUALA, L

STRENGTHENING THE ROLE OF AHMADU BELLO UNIVERSITY IN THE NATIONAL AGRICULTURAL RESEARCH SYSTEM OF NIGERIA.
OLUGBEMI, L.B; OYEDIPE, E.O

A GLOBAL POPULATION POLICY TO ADVANCE HUMAN DEVELOPMENT IN THE 21ST CENTURY.
MCNAMARA, R

MARKETING OF AGRICULTURAL PRODUCTS.
RICHARD, K; JOSEPH, N

TSETSE BIOLOGY AND ECOLOGY
STEPHEN, L.G

ORGANIZATION AND STRUCTURE OF FAO.
FAO

MARKETING THAILANDS POTATO; PRESENT PATTERNS AND FUTURE PROSPECTS.
GREGORY, J.S

STATUTORY INTERVENTION IN AGRICULTURAL MARKETING.
VERONICA, J; GRANT, M

THE FEEDING OF WORKERS IN DEVELOPING COUNTRIES.
GANZIN, M

NEITHER MARKET NOR STATE; GOVERNANCE OF COMMON-POOL RESOURCES IN THE TWENTY-FIRST CENTURY.
OSTROM, E

POPULATION AND FOOD IN THE EARLY TWENTY-FIRST CENTURY.
NURUL, I

GUIDELINES TO TECHNICAL ASSISTANCE PROCEDURES FOR THE EXPORT MARKET DEVELOPMENT PROGRAMME.
CFTC

DRAFT ESTIMATES OF REVENUE AND EXPENDITURE (RECURRENT AND DEVELOPMENT).
ROU

THE FINANCE ACT 1998
REPUBLIC OF UGANDA

LINKAGES BETWEEN GOVERNMENT SPENDING, GROWTH, AND POVERTY IN RURAL INDIA.
SHENGGEN, F; HAZELL, P

A 2020 VISION FOR FOOD, AGRICULTURE, AND THE ENVIRONMENT.
GROSVENOR, M.G; DAVID, E

STERILIZING CAPITAL INFLOWS.
JANG, Y.L

ENDOWMENTS IN AFRICA
JONES, P

DISTRIBUTION, FREQUENCY OF ATTACK AND SEASONAL INCIDENCE OF THE AFRICAN ARMWORM .
TDR

PEOPLES PARTICIPATION PROGRAMME IN PUJEHUN, SIERRA LEONE
THOMAS, C

ACHIEVING SUSTAINABLE FOOD SECURITY FOR ALL BY 2020.
RAJUL, P

THE FINANCIAL CONDITION OF ARKANSAS FARM SURVEY RESPONDENTS.
COLLINS, R

PARTICIPATION AND DEVELOPMENT IN EASTERN AND SOUTHERN AFRICA.
BUTEGWA, F; MULWANDA, P

AGRICULTURAL POLICY REFORMS AND REGIONAL NARKET INTEGRATION IN MALAWI, ZAMBIA, AND ZIMBABWE.
ALBERTO, V; KOESTER, A

DEFENDING THE FUTURE. AGUIDE TO SUSTAINABLE DEVELOPMENT
STEPHEN, B

FOOD TRENDS IN ACP COUNTRIES.
TREITZ, W
.jpg)
DRAFT ESTIMATES OF REVENUE AND EXPENDITURE RECURRENT AND DEVELOPMENT.
ROU

THE PILOT FOOD PRICE SUBSIDY SCHEME IN THE PHILIPPINES; ITS IMPACT ON INCOME, FOOD CONSUMPTION, AND NUTRITIONAL STATUS.
GARCIA, M

FOOD IN THE THIRD WORLD; PAST TRENDS AND PROJECTIONS TO 2000.
LEONARD, A

TRAINING FOR DECENTRALIZED PLANNING
MEETZ, M; MARIA, G

WOMEN INCOME AND BOY-GIRL ANTHROPEMETRIC STATUS IN THE COTE DIVOIRE.
HODDINOTT, J

EFFECTS OF EXCHANGE RATE AND TRADE POLICIES ON AGRICULTURE IN PAKISTAN.
DOROSH,P

TRADE PESSIMISM AND REGIONALISM IN AFRICAN COUNTRIES; THE CASE OF GROUNDNUT EXPORTERS.
OUSMANE, B; SAMBOUTH, K

THE CHANGING ROLES OF MULTILATERAL AND BILATERAL FOREIGN ASSISTANCE.
JOHN, W; WILLIAM, A

ISSUES IN THE ANALYSIS OF THE EFFECTS OF POLICY ON CONSERVATION AND PRODUCTIVITY AT THE HOUSEHOLD LEVEL IN DEVELOPING COUNTRIES.
THOMAS, R; STEPHEN, A

HOW IMPORTANT TO INDIA POOR IS THE SECTORIAL COMPOSITION OF ECONOMIC GROWTH.
MARTIN, R; GAURAV, D
.jpg)
INCENTIVES AND CONSTRAINTS IN THE TRANSFORMATION OF PUNJAB AGRICULTURE.
ANYA, M; YAIR, M

DROUGHT AND FAMINE RELATIONSHIPS IN SUDAN; POLICY IMPLICATIONS.
TESFAYE, T; JOACHIM, B

GROWTH IN JAPAN HORTICULTURAL TRADE WITH DEVELOPING COUNTRIES; AN ECONOMIC ANALYSIS OF THE MARKET.
HONMA, M

FOODGRAIN SUPPLY, DISTRIBUTION, AND CONSUMPTION POLICIES WITHIN A DUAL PRICING MECHANISM;
RAISUDDIN, A

ECONOMIC DEVELOPMENT INSTITUTE.
WILLOUGHBY, C

LIST OF RESEARCH WORKERS 1966
BERRY, E.W; BUTLER, P

COMMERCIALIZATION OF AGRICCULTURE UNDER POPULATION PRESSURE; EFFECTS ON PRODUCTION, CONSUMPTION, AND NUTRITION IN RWANDA.
JOACHIM, B; JUERGEN, B

ADOPTION OF HYBRID MAIZE IN ZAMBIA; EFFECTS ON GENDER ROLES, FOOD CONSUMPTION, AND NUTRITION.
SHUBH, K.K

PRIORITIES IN FUTURE ALOCATION OF UNFPA RESOURCES.
UNFPA

DOES IT MATTER HOW WE SURVEY DMAND FOR FOOD.
HOWARTH, B; EILEEN, K

PROMOTING INTERSECTORAL GROWTH LINKAGES RURAL AFRICA THROUGH AGRICULTURAL TECHNOLOGY AND POLICY REFORM
PETER, H; JANE, H

PARALLEL MARKETS FOR AGRICULTURE IN A WEST AFRICAN SETTING; ORIGINS AND DISTRIBUTIONAL EFFECTS.
DETLEV, P; BRAUN, V

MACRO AND MICRO EFFECTS OF SUBSIDY CUTS; A SHORT-RUN CGE ANALYSIS FOR EGYPT.
HANS, L

RESEARCH, PRODUCTIVITY, AND OUTPUT GROWTH IN CHINESE AGRICULTURE.
SHENGGEN, F

FAMINE AS THE OUTCOME OF POLITICAL PRODUCTION AND MRKET FAILURES.
TESFAYE, T; WEBB, P

INSTITUTIONS AND MARKET DISTORTIONS; INTERNATIONAL EVIDENCE FOR TOBACCO.
BEGHIN, C.J; FOSTER, W

RURAL INFRASTRUCTURE AND AGRICULTURAL DEVELOPMENT IN SOUTHERN AFRICA; A CENTRE-PERIPHERY PERSPECTIVE.
SUDHIR, W; ISLAM, Y

MACRO-POLICIES AND TECHNOLOGY CHOICE IN THE PHILIPPINES.
ROMEO, M.B

CHINA AND INDIA ; A COMPARATIVE PERSPECTIVE ON FERTILIZER POLICY REQUIREMENTS FOR LONG TERM GROWTH AND TRANSITIONAL NEEDS.
STONE, B; GUNVANT, M

SOCIAL SECURITY IN SUB-SAHARAN AFRICA; REFLECTIONS ON POLICY CHALLENGES.
JOACKIM, V.B

AGRICULTURAL COMMERCIALIZATION AND DIVERSIFICATION; PROCESSES AND POLICIES.
PRABHU, L.P; ROSEGRANT, M

MEASURING FOOD INSECURITY; THE FREQUENCY AND SEVERITY OF COPING STRATEGIES.
MAXWELL, D

GENDER BIAS IN THE ALLOCATION OFRESOURCES WITHIN HOUSEHOLDS IN BURKINAFASO; A DISAGGREGATED OUTLAY EQUIVALENT ANALYSIS.
THOMAS, R; HADDAD, L

RURAL SERVICES, RURAL INFRASTRUCTURE AND REGIONAL DEVELOPMENT IN INDIA.
SUDHIR, W

GENDER DIFFERENTIALS IN FARM PRODUCTIVITY; IMPLICATIONS FOR HOUSEHOLD EFFICIENCYAND AGRICULTURAL POLICY.
UDRY, C; ALDERMAN, H

RETHINKING TRAINING IN FOOD POLICY ANALYSIS; HOW RELEVANT IS IT TO POLICY REFORMS.
SURESH, C

FOOD SECURITY AND HEALTH SECURITY; EXPLAINING THE LEVELS OF NUTRITIONAL STATUS IN PAKISTAN.
HAROLD, A; MARITO, G

GETTING EARLY INTERVENTION EFFORTS RIGHTS-THE KEY ROLE OF AGRICULTURAL DEVELOPMENT IN THIRD WORLD FOOD SECURITY.
NDERSEN, P.P

FALLING TRANSPORT COSTS AND AGRICULTURAL DEVELOPMENT
NERLOVE, M; SADKA, E

PROTECTION AND EXPORT PERFORMANCE IN SUB-SAHARAN AFRICA.
DEROSA, D

EMPIRICAL DEMAND SYSTEMS.
TESFAYE, T; ZUHAIR, A

A.I.D RESEARCH AND DEVELOPMENT ABSTRACTS.
AID

INSIDE BUSINESS OPPORTUNITIES AT BUZARDI.
SSEKIWOKO, F

FINANCIAL LITERACY FOR WEALTH CREATION.
NOEL, C

MALARIA AMONG GOLD MINERS IN SOUTHERN PARA BRAZIL; ESTIMATES OF DETERMINANTS AND INDIVIDUAL COSTS.
VOSTI, S.A

GUIDELINES FOR SAFE WAREHOUSING OF PESTICIDES.
PARTON, T.W

FIRST ANNUAL MEETING OF THE AFRICAN FERTILIZER TRADE AND MARKETING INFORMATION NETWORK.
MAKKEN, L

PMA CIVIL SOCIETY PARTNERSHIP PRINCIPLES.
PMA

AN OUTLOOK FOR FERTILIZER DEMAND, SUPPLY,AND TRADE, 1988/89-1993/94.
COSTANT, K; SHELDRICK, F.W

DECENTRALISATION IN UGANDA.
KISEMBO, S.W

HARNESSING THE POTENTIAL OF PUBLIC /PRIVATE PARTNERSHIP.
THOMSON, J.A

CHECKLIST TO ASSIST PREPARATION OF SMALL SCALE IRRIGATION PROJECTS IN SUB SAHARAN AFRICA.
COLLIER, F.W; WALLINGFORD, H.R

ACHIEVEMENTS, CONSTRAINTS AND IMPACTS.
ICRAF

WORKSHOP ON REDUCING POVERTY IN AFRICA BY STRENGTHENING COFFEE PROJECTS.
ONZIMA, R.J; MBONDJI, P

GLOBAL REVIEW OF RURAL COMMUNITY ENTERPRISES.
DONOVAN, J; DIETMAR, S

INTERNATIONAL SEAFOOD TRADE; CHALLENGES AND OPPORTUNITIES.
EINARSSON, H; EMERSON, W

IITA STRATEGIC PLAN 2001-2010
ROSEGRANT, C.M; STEINFIELD, H

FAO COMMISSION FOR CONTROLLING THE DESERT LOCUST IN THE EASTERN REGION OF ITS DISTRIBUTION AREA IN SOUTH WEST ASIA.
TEHRAN, R.I

RURAL TRANSPORT.
DORAN, J

APPROACHES TO PARTICIPATION IN RURAL DEVELOPMENT.
OAKLEY, P; MARSDEN, D

COMMODITY MARKET REVIEW.
GRIFFIN, M

MEDIUM-TERM PLAN PROSPECTS FOR AGRICULTURAL COMMODITIES.
MAURIZIO, N

PRODUCER GAS; ANOTHER FUEL FOR MOTOR TRANSPORT.
LINCOLN, J

SEED PRODUCTION BY SMALLHOLDER FARMERS.
HANSON, J

AQUACULTURE PRODUCTION STATISTICS.
FAO
.jpg)
THE ROLE OF SEED CERTIFICATION IN THE SEED INDUSTRY.
PARDEE, W.D

EVALUATING THE DIRECTOR GENERAL; THE ASSESSMENT PROCESS.
DILLON, J

STRATEGICISSUES FOR NATIONAL POLICY DECISIONS IN MANAGING GENETIC RESOURCES.
COLLINS, W; PETIT, M

AGRICULTURAL FINANCE REVISITED; WHY?
ROBERTS, R.A; NORMAN, R

INTERNATIONAL STANDARDS FOR PHYTOSANITARY MEASURES PART 1 IMPORT REGULATIONS.
DIOUF, J

INTERNATIONAL STANDARDS FOR PHYTOSANITARY MEASURES EXPORT CERTIFICATION SYSTEM.
DIOUF, J

INTERNATIONAL STANDARDS FOR PHYTOSANITARY MEASURES GUIDELINES FOR REGULATING WOOD PACKAGING MATERIAL IN INTERNATIONAL TRADE.
DIOUF, J

TOWARDS A COMMON REGIONAL POLICY, REGULATORY AND BIOSAFETY FRAME ON GENETICALLY MODIFIED ORGANISMS IN EAST AFRICA.
SENGOOBA, T; MUGOYA, C

LIBRARY FUNDING ADEQUATE FINANCIAL SUPPORT FOR AFRICAN UNIVERSITY LIBRARIES.
WILLEMSE, J

MINUTES, AUDIT COMMITTEE PROGRAM COMMITTEE BOARD OF TRUSTEES 29TH APRIL TO 2 MAY 1996.
OKELLO, M; LUVENTIS, A

THE POWER OF VISIONING A HANDBOOK FOR FACILITATING THE DEVELOPMENT OF COMMUNITY ACTIONS PLANTS.
PASCAL, C; COLLETAH, A.

BUILDING A DIGITAL LIBRARY AT THE UNIVERSITY OF ZIMBABWE.
MBAMBO, T

EXECUTIVE COMMITTEE, PROGRAM COMMITTEE AND BOARD OF TRUSTEES 27-30 APRIL 1992.
MUMBA, N; BUVINIC, M

AUDIT COMMITTEE, EXECUTIVE COMMITTEE PROGRAM COMMITTEE BOARD OF TRUSTEES.
OKELO, M; ARNOR, N

THE CONSTITUTION OF THE REPUBLIC OF UGANDA.
ROU

PROMOTING THE PRODUCTIVITY AND COMPETITIVENESS OF AFRICAN AGRICULTURE IN A GLOBAL ECONOMY.
SANDTON, C

THE ECONOMICS OF INTERNATIONAL AGREEMENTS FOR THE PROTECTION OF ENVIRONMENTAL AND AGRICULTURAL SERVICES.
BARRET, S

INVENTORY CREDIT AN APPROACH TO DEVELOPING AGRICULTURAL MARKETS.
COULTER, J; SHEPHERD, A
.jpg)
REPORT OF THE SUBCOUNTY PLANNING MEETINGS FOR THE SELECTED SUBCOUNTIES IN THE MODERNISATION OF AGRICULTURE.
KAZIBWE, W

REORIENTING THE COOPERATIVE STRUCTURE IN SELECTED EASTERN EUROPEAN COUNTRIES.
HUNEK, T

BACKGROUND TO THE BUDGET FOR FINANCIAL YEAR 2005/2006.
ROU

WHEN DOES CIVIL SOCIETY MAKE SENSE FOR POVERTY REDUCTION AND DEMOCRACY IN UGANDA? A SUMMARY OF THE FINDING.
SSEWAKIRYANGA, R

STRUCTURAL ADJUSTMENT AND AGRICULTURAL MARKETING.
PAPASOLOMONTOS, A

FEED FORMULATION; INCREASED DEMAND FOR INFORMATION.
KOELEMAN, E; BURGIN, R

INTERNATIONAL PROGRAM FOR DEVELOPMENT EVALUATION TRAINING 2008.
VINOD, T; BARBARA, L

PRACTICAL INFORMATION REPACKAGING WORKSHOP FARMER COMMUNICATION MATERIALS DEVELOPMENT.
JOYCE, A

PESTICIDE STORAGE AND STOCK CONTROL MANUAL.
UNEP

AUTO ATTRACTION AFRICAN CONSUMERS SHIFT TOWARDS CHINESE CAR BRANDS.
FREEMANTLE, S

EAST AFRICA AGRIBUSINESS.
NALUBEGA, J; MUCOORI, P

REPORT OF THE FOURTH SESSION OF THE SUB-COMMITTEE ON FISH TRADE.
MAYGOLINEJAD, E

GLOBAL STATUS OF COMMERCIALIZED TRANSGENIC CROPS.
CLIVE, J

THE ECONOMICS OF OCEAN RANCHING.
ARNASON, R;

FERMENTATION INSTALLATIONS.
SEMANDA, H

CONDITIONS OF LABOUR ON COMMERCIAL DIARY FARMS IN KABALE DISTRICT.
MURINDWA, R

WORKING PAPER CAPITAL AND CONDITIONS OF FISHER LABOURERS OF LAKE KYOGA AND VICTORIA CANOE FISHERIES.
ASOWA, O

SIMPLE ECONOMICS AND BOOKKEEPING FOR FISH FARMERS.
WILLIAMS, C

AFRICA GATHERS IN EGYPT REPORTS AND ANALYSIS FROM THE FORUM ON CHINA AFRICA COOPERATION.
SEBASTIAO, C

PARTICIPATORY APPROACHES FOR COOPERATIVE GROUP EVENTS.
EBERHARD, G

AFRICAN FERTILIZER TRADE AND MARKETING INFORMATION NETWORK ON FERTILIZER PROMOTION AND SALES TECHNIQUES TECHNIQUES IN SUB SAHARAN AFRICA.
MOKWUNYE, U

AGRICULTURAL TAXATION UNDER STRUCTURAL ADJUSTMENT.
SARRIS, H.A

TACKLING PRICE INSTABILITY.
LUDWIQ, F; KABAT, H

POST LIBERALISATION CEREAL COMMODITY MARKETS IN EASTERN AND SOUTHERN AFRICA.
OPIO, F; SANAT, R

FOOD AND INTERNATIONAL TRADE.
MENSBRUGGHE, V.D

GOOD PRACTICES IN PLANNING AND MANAGEMENT OF INTEGRATED COMMERCIAL POULTRY PRODUCTION IN SOUTH ASIA.
PRABAKARAN, R

ECONOMIC APPRAISAL OF THE PELAGIC FISHERY OF LAKE KARIBA.
HOREMANS, B

BACKGROUND TO THE BUDGET 1987-1988.
NUWAGABA, A.H

MINISTRY OF INTERNAL AFFAIRS BUDGET STATEMENT 1993/94.
BUTIME, T

BUDGET POLICY STATEMENT FOR 1993/94 FISCAL YEAR.
ADRIKO, E.T.S

POVERTY ERADICATION ACTION PLAN 2004/5-2007/8
KYETERE, D

BACKGROUND TO THE BUDGET 1988-1989.
SSEKITOLEKO, V

PRACTICAL CONSIDERATIONS FOR PLANNING AND IMPLEMENTING COMMUNICATION ACTIVITIES.
IMAIKORIT, F; ORUKO, L

REPORT OF THE THIRD WORKSHOP ON THE BIOLOGICAL AND ECONOMIC MODELLING OF THE SHRIMP RESOURCES OF THE GUYANZA BRAZIL SHELF.
CHARLIER, P

A MICRO ECONOMIC DEMOGRAPHIC MODEL OF THE AGRICULTURAL HOUSEHOLD IN THE PHILIPPINES.
YOTOPOULOS, P.A

WHOLESALE MARKET MANAGEMENT A MANUAL.
DENSLEY, B

REPORT OF THE FOURTH SESSION OF THE SUB COMMITTEE ON FISH TRADE.
FAO

PROFIT FOR THE POOR CASES IN MICRO FINANCE.
HARPER, M

VALUE CHAIN DYNAMICS AND THE SMALL SCALE SECTOR.
BJORNDAL, T; LEM, A

PRODUCTION AND CONSUMPTION OF FOOD GRAINS IN INDIA; IMPLICATIONS OF ACCELERATED ECONOMIC GROWTH AND POVERTY ALLEVIATION.
SARMA, J.S; GANDHI, V.P

INCOME AND NUTRITIONAL EFFECTS OF THE COMMERCIALIZATION OF AGRICULTURE IN SOUTHWESTERN KENYA.
KENNEDY, T.E; COGILL, B
.jpg)
IRRIGATION TECHNOLOGY AND COMMERCIALIZATION OF RICE IN THE GAMBIA; EFFECTS ON INCOME AND NUTRITION.
BRAUN, J; WEBB, P

AN AUDIT OF INLAND CAPTURE FISHERY STATISTICS AFRICA.
WELCOMME, R; LYMER, D

COOPERATIVE DAIRY DEVELOPMENT IN KARNATAKA INDIA; AN ASSESSMENT.
ALDERMAN, H

AFRICAN DEVELOPMENT REPORT 2005
KABBAJ, O

SUSTAINABLE DEVELOPMENT ECONOMICS AND ENVIRONMENT IN THE THIRD WORLD.
PEARCE, D; MARKANDYA, A

RURAL CREDIT ; LESSONS FOR RURAL BANKERS AND POLICY MAKERS .
PADMANABHAN, K.P

PROMOTION GROWTH AND DEVELOPMENT OF SMALLHOLDER SEED ENTERPRISES FOR FOOD SECURITY CROPS
NEATE,P; ROBERT, G.G

REGIONAL PRIORITIES AND EMERGING GLOBAL PROGRAMMES; A PRELIMINARY REPORT ON A STAKEHOLDER DIALOGUE.
GFAR

RICE PRICE FLUCTUATION AND AN APPROACH TO PRICE STABILIZATION IN BANGLADESH.
BERNARD, A; RAISUDDIN, A

COMMUNICATION MATERIAL DEVELOPMENT FOR FARMERS; TRAINERS MANUAL
KAYANJA,D

PLANNING FOR EFFECTIVE TRAINING.
WENTLING, T

RURAL PROPERTY TAX SYSTEMS IN CENTRAL AND EASTERN EUROPE.
MAXIMILIANO, C

TRAFFIC BULLETIN; IRANS TRADE IN ORCHID TUBERS.
LOCHEN, S

MOUNTAIN RESEARCH AND DEVELOPMENT;
WYMANN, S; ZIMMERMANN,A

NURTURING TREES AND FORESTS FOR POVERTY ERADICATION.
ONEK,H

UGANDA DISTRICT INFORMATION HANDBOOK.
RWABOOGO, O.M

CREDIT AND REDUCTION OF POVERTY IN UGANDA; STRUCTURAL ADJUSTMENT REFORMS IN CONTEXT.
MUHUMUZA,W

WORKING FOR SUSTAINABLE FOOD SECURITY.
CGIAR

BACKGROUND TO THE BUDGET 1993-1994; ECONOMIC PERFORMANCE 1992-93 AND PROSPECTS FOR 1993-1994.
REPUBLIC OF UGANDA

FOREIGN INVESTMENT LAWS AND AGRICULTURE.
HENDERSON,J; BRANCH, L

HOME-ECONOMICS HAND BOOK.
UNICEF

PLANNING FOR EFFECTIVE TRAINING
WENTLING, T

GENDER EQUALITY AND INVESTMENTS IN ADOLESCENTS IN THE RURAL PHILIPPINES.
BOUIS,H; WESTBROOK, D; LIMBO,A

DRAFT ESTIMATES OF REVENUE AND EXPENDITURE RECURRENT AND DEVELOPMENT.
REPUBLIC OF UGANDA

DRAFT ESTIMATES OF REVENUE AND EXPENDITURE RECURRENT AND DEVELOPMENT 1995-1996
THE REPUBLIC OF UGANDA

STRENGTHENING AGRICULTURAL MARKETING TRAINING AND MANPOWER DEVELOPMENT;REPORT ON THE FAO WORKSHOP ON STRENGTHENING TRAINING IN AGRICULTURAL AND FOOD MARKETING IN EASTERN AND SOUTHERN AFRICAN COUNTRIES NAIROBI,KENYA,
69

WORLD BANK DISCUSSION PAPER; MAKING MOTHERHOOD SAFE.
KOBLINSKY, M.A;TINKER, A

RURAL FINANCE PROFILES IN AFRICAN COUNTRIES VOLUME 2
MASINI, M

NOW IS THE TIME; A PLAN TO CUT HUNGER AND POVERTY IN AFRICA.
SENATOR, R.D;HAMILTON, L

WORKING PAPER CONDITIONS OF LABOUR ON COMMERCIAL DAIRY FARMS IN KABALE DISTRICT.
RUTANGA,M

ECONOMIC DEVELOPMENT INSTITUTE OF THE WORLD BANK; THE DESIGN AND MANAGEMENT OF POVERTY REDUCTION PROGRAMS AND PROJECTS IN ANGLOPHONE AFRICA.
BAMBARGER, M; MATOVU, G

SUPPLEMENT TO THE LAWS OF UGANDA CONTAINING THE NOTER-UP AND AMENDED TEXTS COVERING THE PERIOD 1ST JANUARY 1996 TO 31ST MAY 1967.
SSALI, H

THE MAKING OF ECONOMIC POLICY IN AFRICA.
GULHATI, R

REVIVING GLOBAL POVERTY EDUCATION; WHAT ROLE FOR GENETICALLY MODIFIED PLANT
LIPTON, M

POPULATION AND EMPLOYMENT IN DEVELOPING COUNTRIES.
FAROOQ, M.G

ADJUSTMENT IN AFRICA REFORMS, RESULTS, AND THE ROAD AHEAD.
IBADAN, B

MULTILATERAL OFFICIAL DEBT RESCHEDULING RECENT EXPERIENCE
KUHN, G.M; GUZMAN, P.J

THE ROLE OF THE WORLD BANK IN AGRICULTURAL DEVELOPMENT IN THE 1990
MICHEAL, L; PAARLBERG, R

MONTHLY BULLETIN OF AGRICULTURAL ECONOMICS AND STATISTICS.
SAKOFF, A.N
Education Extension

SWIDDENS IN TRANSITION; SHIFTED PERCEPTIONS ON SHIFTING CULTIVATORS IN INDONESIA.
NOORDWIJK, M

GENDER CONCEPTIONS AND PERCEPTIONS THAT PREDISPOSE GIRLS TO PREMATURE TERMINATION OF EDUCATION; THE CASE FOR KABAROLE DISTRICT UGANDA.E
MANYIRE, H

GENDER GAP IN ACCESS TO EDUCATION IN NIGERIA; PILOT STUDY.
OKOJIE,C; OKPOKUNU,E

THE ATTITUDE TOWARDS SCIENCE AMONG PRIMARY AND SECONDARY SCHOOL STUDENTS IN KENYA.
WASANGA, M.C

CAUSES OF LOW ENROLMENT AND HIGH DROPOUT RATES IN PRIMARY EDUCATION AMONG FEMALE CHILDREN.
AYIGA, N

FEMALE PARTICIPATION IN SCIENCE; AN ANALYSIS OF SECONDARY SCHOOL SCIENCE CURRICULUM MATERIALS IN NIGERIA.
ERINOSHO, S

GENDER GAP IN ACCESS TO EDUCATION IN NIGERIA; FOCUS GROUP DISCUSSION WITH ADULT MEN AND WOMEN.
OKPOKUNU, E

THE KNOWLEDGE, ATTITUDES AND PRACTICES OF WOMEN AND GIRLS AT GRASS ROOT LEVEL REGARDING THE ENVIRONMENT IN TANZANIA.
RAJABU, A.R; CHEDIEL, R.W

LITERATURE ON GENDER ISSUES IN EDUCATION IN UGANDA.
KYAMUREKU, P.T

THE ROLE OF RELIGIOUS INSTITUTIONS IN FEMALE EDUCATION IN KENYA.
KWAMBOKA, E

SCHOOL ADMINISTRATION AND GIRLS ACADEMIC PERFORMANCE; A COMPARATIVE STUDY OF ACADEMIC PERFORMANCE IN CENTRAL UGANDA SECONDARY SCHOOLS.
BASIRIKA, E.I; MANYIRE, H

SCHOOL AND HOME FACTORS AS CORRELATES OF ACADEMIC ACHIEVEMENT OF NIGERIAN FEMALE TEENAGERS IN MATHEMATICS.
IFELUNNI, C.S

GENDER GAP IN ACCESS TO EDUCATION IN NIGERIA; FOCUS GROUP DISCUSSIONS WITH ADULT MEN AND WOMEN IN NSUGBE ANAMBRA STATE OF NIGERIA.
OKOJJE, C.E; CHIEGWE, O

FACTORS CAUSING UNDER-ACHIEVEMENT IN MATHEMATICS AMONG SECONDARY SCHOOL GIRLS IN ZAMBIA.
NDIMBIRWE, B.J

HOUSEHOLD BASED FACTORS AS DETERMINANTS OF SCHOOL PARTICIPATION OF GIRLS IN KENYA; THE CASE OF NAIROBI AND SIAYA DISTRICTS
OWINO, W; OKWACH, A

GIRLS UNDERSTANDING OF CONCEPTS OF THERMAL PROPERTIES OF MATTER.
ZIETMAN, A; SHARADH, N

PRIORITY RESEARCH THEMES ON FEMALE EDUCATION IN AFRICA.
HYDE, K

GENDER GAP IN ACCESS TO EDUCATION IN NIGERIA;FOCUS GROUP DISCUSSION WITH ADULT MEN AND WOMEN IN ITAOGBOLU, ONDO STATE.
OKOJIE, EE; OKPOKUNNU, E

GENDER GAP IN ACCESS TO EDUCATION IN NIGERIA; FOCUS GROUP DISCUSSIONS WITH ADULT MEN AND WOMEN IN DU PLATEAU STATE.
OKOJJE, E.C; OKPOKUNU, E

THE ROLE OF RELIGIOUS NETWORKS IN THE PROVISION OF EDUCATION TO WOMEN IN AFRICA; KENYA CASE.
HINGA, M,T

THE DYNAMICS OF FAMILY STRUCTURES AND WOMEN ACCESS TO EDUCATION IN ZAIRE; THE CASE OF KINSHASA CITY
MUKENI, B; GNONDO, P; LUTUTALA, M

GENDER HIV AIDS AND PRIMARY SCHOOL ENROLMENT AND DROPOUT IN SOUTH WESTERN UGANDA.
TUMUSHABE, J; NYAKIKONGORO, R

PROCESSES INFLUENCING GENDER DIFFERENCES IN ACCESS TO POST SECONDARY INSTITUTIONS INUGANDA.
KASENTE, D.H

DEVELOPMENT OF INNOVATIVE VIDEO METHODOLOGY IN EDUCATIONAL RESEARCH AND DEVELOPMENT.
KIRAGU, F; LANGE, R

BOTSWANA PREGNANCY RELATED EDUCATIONAL POLICIES AND THEIR IMPLICATIONS ON EX PREGNANCY GIRLS EDUCATION AND PRODUCTIVITY.
MURANGI, K; BAYONA, E.L

GIRLS USE OF SPATIAL PERCEPTORS AND VISUAL SEGMENTATION IN SOLVING VISUALLY ORIENTED PROBLEMS.
SPROULE,S

GENDER GAP IN ACCESS TO EDUCATION IN NIGERIA; REPORT OF HOUSE HOLD SURVEYS.

TOWARDS A PLAN OF ACTION FOR THE IMPROVEMENT OF FEMALE LITERACY AND ENROLMENT IN SOUTHWESTERN NIGERIA.
AFONJA, S.

GENDER GAP IN ACCESS TO EDUCATION IN NIGERIA; REPORT OF FOCUS GROUP SESSIONS WITH CHILDREN 12-22 YEARS.
OKOJIE, C.E; CHIEGWE, O

A WORLD BANK POLICY STUDY; EDUCATION IN SUB-SAHARAN AFRICA. POLICIES FOR ADJUSTMENT, REVITALIZATION AND EXPANSION.
CONABLE, B.B

PARTICIPATION IN PRACTICE; LESSONS FROM THE FAO PEOPLES PARTICIPATION PROGRAMME.
GRAEME, T; SANSONETTI, G

GENDER GAP IN ACCESS TO EDUCATION IN NIGERIA; FOCUS GROUP DISCUSSIONS WITH ADULT MEN AND WOMEN IN BEJI, NIGER STATE.
OKOJIE, E.E; CHIEGWE, O; OKPOKUNU, E.
Extension Guides

IMPROVING THE EFFECTIVENESS OF EXTENSION SERVICES IN UGANDA
Semana A.R.; Opio J.M.A.; Zziwa S.
FEASIBILITY STUDIES ON THE REHABILITATION AND DEVELOPMENT OF SEED FARMS, FOOD CROPS & OIL SEED PROJECTS
Kamugira F.
UGANDA AGRICULTURE

REPORT OF THE NATIONAL WORKSHOP ON FOOD PRODUCTION AND AVAILABILITY
Kitariko R.

TOWARDS A NATIONAL FOOD STRATEGY: VOLUME 1: MAIN STRATEGY REPORT

INFORMATION AND COMMUNICATION MANAGEMENT STRATEGY DEVELOPMENT

STUDIES ON UTILIZATION AND MANAGEMENT OF NATURAL RESOURCES (SOIL AND WATER)
Aniku J; Shone G.; LUNOGELO B H.; Rusoke C; Nyakuni A; Kariuki J; Gachanja J; Wangu C

STRENGTHENING REGIONAL CAPACITY IN VALUE ADDED CROP PROCESSING TECHNOLOGIES FOR SUSTAINABLE FOOD SECURITY IN EAST AND CENTRAL AFRICA

MANUAL FOR HORTICULTURAL EXPORT QUALITY ASSURANCE
Henderson D.

QUARTERLY BULLETIN
Houten H; Mwagore D; Kebaara K; Mukanyange J; Tom K
.jpg)
THE FIRST NATIONAL SCIENTIFIC CONFERENCE ON FOOD & AGRICULTURE
Nape O G.W.; Odongo B.; Mwesigye C.; Ebiyau J.

DRAFT PROPOSAL FOR THE UGANDA NATIONAL FOOD PROGRAM

THE MAKING OF NEW POWERGUDA: COMMUNITY EMPOWERMENT AND NEW TECHNOLOGIES TRANSFORM A PROBLEM VILLAGE IN ANDHRA PRADESH
E D`Silva, SP Wan; Nagnath B

AGRICULTURAL REVIEW JOURNAL OF THE AGRICULTURAL INDUSTRY IN AFRICA
Muthee M ; Kabuzire I

PARTICIPATING IN EUROPEAN RESEARCH
LANNOY,DJ.

WORLD CLASS SCIENCE FOR SUSTAINABLE LAND MANAGEMENT,
BARLET, ELSPETH

POVERTY REDUCTION THROUGH PARTNERSHIP IN NATURAL RESOURCES RESEARCH.
NRSP.

THE MARKET FOR NON TRADITIONAL AGRICULTURAL EXPORTS.
HALLLAM, D; CLARO, J.

MODELING SALINITY IMPACT ON GROUND WATER IRRIGATED TURMERIC CROP.
KIIZA, T.

SECOND GLOBAL PLAN OF ACTION.
GRAZIANO, J D.S

STATE OF THE WORLD FOREST
CARLE, C.M; HOLMGREN, P.

POLICY MANUAL FOR THE BOARD OF TRUSTEES.
SCOTT, B R.

UNASYLVA
PERLIS, A; ANYONGE, H.C

A PROVISIONAL METHODOLOGY FOR SOIL DEGRADATION ASSESSMENT.
FAO

CONSULTATIVE GROUP ON INTERATIONAL AGRICULTURAL RESEARCH
ANTONIO, M.G;GEBHARDT, C

VOLUNTARY STANDARDS AND CERTIFICATION FOR ENVIRONMENTALLY AND SOCIALLY RESPONSIBLE AGRICULTURAL PRODUCTION AND TRADE.
LUI, P; PAZDERKA, C

EXPERT CONSULTATION ON REGIONAL PRIORITY SETTING FOR AGRICULTURAL RESEARCH FOR DEVELOPMENT IN THE ASIA PACIFIC REGION AND SIXTH EXECUTIVE COMMITTEE MEETING OF APAARI
PARODA, R.S

COMPEDIUM OF TOBACCO DISEASES.
LUCAS, G.B; SHEW H.D

MANUAL FOR SWEETPOTATO INTEGRATED PRODUCTION AND PEST MANAGEMENT FARMER FIELD SCHOOLS IN SUB SAHARAN AFRICA.
NAMANDA, S.M;KAPINGA, R

21ST CENTURY AGRICULTURE; A CRITICAL ROLE FOR SCIENCE AND TECHNOLOGY
VENEMAN, M A

CIFAD ANNUAL REPORT 1988
VENT. O.

REFLECTING ON AN IMPORTANT DECADE FOR AGRICULTURAL RESEARCH IN DEVELOPING COUNTRIES.
STEIN, W.B

THE INTERNATIONAL JOURNAL ON BANANA AND PLATAIN
VEZINA, A.

UGANDA JOURNAL OF AGRICULTURAL SCIENCES
MIKENGA, S

GLOBAL HUNGER INDEX
GREBMER, KV;HEADY, D

HANDBOOK OF BEST PRACTICES FOR MANAGEMENT OF INTELLECTUAL PROPERTY IN HEALTH RESEARCH AND DEVELOPMENT.
MAHONEY, T.R.; FEIDT, H.H

CARBON SEQUESTRATION IN DRYLAND SOILS
ANTOINE, J.

HUMAN ENERGY REQUIREMENTS
TONTISIRIN, K.

WATER CHARGING IN IRRIGATED AGRICULTURE.
CORNISH,G.; BOSWORTH.B.

TOWARDS EFFECTIVE AND SUSTAINABLE SEED RELIEF ACTIVITIES.
SPERLING, L; OSBORN, T.

REPORT OF THE SEVENTH EXTERNAL PROGRAM AND MANAGEMENT REVIEW EPMR OF THE INTERNATIONAL
EDMEADES, G.

EVALUATION AND IMPACT OF TRAINING IN THE CGIAR.
STREN, E;LYNAM, J.

THE RESEARCH DIVISION KAWANDA RESEARCH STATION.
CHENERY, E.M;ARCHIBALD, J.F

A COLLECTIVE EXHIBIT OF AFRICAN SCHOLARLY PERIODICALS AT THE ZIMBABWE INTERNATIONAL BOOK FAIR 1998
GILKS,G.L;UTOUCH, LSL.

NARO DFID CLIENT ORIENTED AGRICULTURAL RESEARCH AND DISSEMINATION PROJECT
SERUNJOGI, L.K

HANDBOOK OF PIGEONPEA DISEASES
SHARMA,S.B;MCDONALD, D.

ABI ZONAL AGRICULTURAL RESEARCH AND DEVELPOMENT INSTITUTE.
MUKALAZI, J.

SHELL AGRICULTURE
LSLA

OKUTUMBULA OMUTINDO GWOBULUNZI BWENTE MU UGANDA.
NARO

CASSAVA SEED BUSINESS TRAINING MANUAL
EKIYAR, V; MUKISA, R.

USING TRIAL FOLLOWUP SURVEYS TO ASSES VARIETAL ADOPTION.
WORTHMAN, C; MUGISHA, MM.

CASSAVA SEED BUSINESS TRAINING MANUAL.
EKIYAR, V; PARIYO , A

APPLICATION OF CROP GROWTH MODELS TO COMMON BEAN IN AFRICA.
SIMANE, B; WORTMAN, CWS.

HANDBOOK OF BEST PRACTICES FOR MANAGEMENT OF INTELLECTUAL PROPERTY
MAHONEY,T R.

FOOD IMPORT AND EXPORT INSPECTION AND CERTIFICATION SYSTEMS
WHO

NATIONAL BEAN PROGRAMME
MUSAANA, M.S

PROCESSING OF OIL PALM FRUIT AND ITS PRODUCTS.
CORNELIUS, J.A

NATIONAL BEAN PROGRAMME ANNUAL REPORT 1988
SENGOOBA, T; WORTMANN; G.C

PROTA DYES AND TANNINS
JANSEN, PCM; LEMMENS, R.H.M

SOUTH WESTERN HIGHLANDS FARMING SYSTEMS IMPROVEMENT PROGRAMME
NARO

GUIDELINES FOR ACOUSTIC SURVEYS IN THE NORTHWEST AFRICAN REGION.
EMANUELA, D

PAAP STAKEHOLDERS DIRECTORY.
WAITHAKA, M

FAO UGANDA INFORMATION BULLETIN.
NANDELENGA, R; BONTE, A; OWACH, C
FAO Section

RURAL AREA DEVELOPMENT PLANNING
AVROM BENDAVID

GUIDELINES FOR PLANNING IRRIGATION AND DRAINAGE INVESTMENT PROJECTS
YODER, ROBERT

RURAL DEVELOPMENT PLANNING
AVROM

FRUITS AND USEFUL PLANTS IN AMAZONIAN LIFE
ALECHANDRE, A

HARVESTING NATURES DIVERSITY
EDOUARD SAOUMA

MAP OF THE FUEL WOOD SITUATION IN THE DEVELOPING COUNTRIES
UN

GLOBAL FOREST LAND-USE CHANGE 1990-2005
ERIK J. LINDQUIST

TRENDS IN WOOD PRODUCTS 1961-2003
WULF KILLMANN

IMPACT OF THE URUGUAY ROUND ON AGRICULTURE
R.J PERKINS

FAO STATISTICAL YEARBOOK 2012
Adam Prakash and Matthieu Stigler

SIXTH MEETING OF THE EASTERN AFRICAN SUB-COMMITTEE FOR SOIL CORRELATION AND LAND EVALUATION
Fao

ENVIRONMENT IN DECENTRALIZED DEVELOPMENT
SantiagoFunes

FAO TECHNICAL ASSISTANCE AND THE URUGUAY ROUND AGREEMENTS
Fao

AGRICULTURAL RESEARCH AND EXTENSION PROJECT-RESEARCH SUB-PROJECT
Fao

AGRICULTURAL ENGINEERING IN DEVELOPMENT: HUMAN RESOURCE DEVELOPMENT-TRAINING AND EDUCATION PROGRAMMES
Mr. B. Pathak and Mr. J. Ashburner

FAO QUARTERLY BULLETIN OF STASTISTICS
AVDA L. BENARDO

FAO PRODUCTION
SENDIRIAN BERHAD

AGROCLIMATOLOGICAL DATA
O. Brauer

TIMBER PLANTANTATIONS IN THE HUMID TROPICS OF AQFRICA
B. DUPUY

FAO`S 40TH ANNIVERSARY 1945-1985
Fao

FAO QUARTERLY BULLETIN OF STASTISTICS
UN

SOCIOECONOMIC ATTRIBUTES OF TREES AND TREE PLANTING PRACTICES
JOHN B. RAINTREE

CHANGES AND DEVELOPMENT IN SOLO VALLEY FARMING SYSTEMS, INDONNESIA
D.J MCCONNELL

GENDER AND ACCESS TO LAND
VAN KOPPEN

FARMING SYSTEMS DEVELOPMENT AND SOIL CONSERVATION
DAVID AND MALCOLM DOUGLAS

MILK AND MILK PRODUCTS
FAO

THE LAW AND THE SEA
Jean Carroz

ORGANIZATION AND MANAGEMENT STRUCTURES FOR RURAL DEVELOPMENT
Fao

FARMING SYSTEMS AND POVERTY
JOHN DIXON AND GULLIVER AIDAN

SHARING EXPERIENCE FOR PROGRESS
Edouard Saouma

TECHNICAL GUIDELINE FOR CEREAL SEED TESTING
A.O WIGNELL

ESTABLISHING AND OPERATING PLANTS CLINIC INTEGRATED WITH EXTENSION SERVICES IN DEVELOPING COUNTRIES
R. AUSHER AND PALTI

FARMING SYSTEMS DEVELOPMENT: GUIDELINES FOR THE CONDUCT OF A TRAINING COURSE IN FARMING SYSTEMS DEVELOPMENT
K.H. Friedrich

THE FARMING SYSTEMS APPROACH TO DEVELOPMENT AND APPROPRIATE TECHNOLOGY GENERATION
D.W. Norman, F.D. Worman, and E. Modiakgotla

PARTICIPATORY PLANT BREEDING
P. Eyzaguire and M. Iwanaga

TRAINING MANUAL FOR TSETSE CONTROL PERSONELL
EP CUNNINGHAM

FARM MANAGEMENT RESEARCH FOR SMALL FARMER DEVELOPMENT
John L. Dillon and Brian Hardaker

STATUS OF CADMIUM, SELENIUM IN SOILS AND PLANTS OF THIRTY COUNTRIES
Mikko Sillanpaa and Hakan Jansson

THE FARMING SYSTEMS APPROACH TO DEVELOPMENT AND APPROPRIATE TECHNOLOGY GENERATION
D.W NORMAN AND F.D WORMAN

GUIDELINES FOR DEVELOPING AN EFFECTIVE NATIONAL FOOD CONTROL SYSTEM
Walter R. Moses and John J. Henderson

GLOBAL PLAN OF ACTION FOR THE CONSERVATRION AND SUSTAINABLE UTILIZATION OF PLANT GENETIC RESOURCES
JACQUES DIOUF

COMMISSION ON GENETIC RESOURCES FOR FOOD AND AGRICULTURE
OTTAWA

THE GLOBAL STRATEGY FOR THE MANAGEMENT OF FARM ANIMAL GENETIC RESOURCES
HAMMOND K.

THE PRODUCTION AND STORAGE OF DRIED FISH
MADAMBA, ABDUL AZIZ

DOMESTICATION AND HUSBANDRY OF THE PACA (AGOUTI PACA)
J.P. Lanly

THE STATE OF THE WORLD`S LAND AND WATER RESOURCES FOR FOOD AND AGRICULTURE
Fao

The farming systems approach to development and appropriate technology generation
d.w norman and j.d siebert

FAO QUARTERLY BULLETIN OF STATISTICS
Fao

METHODS OF MICRO-LEVEL ANALYSIS FOR AGRICULTURAL PROGRAMMES AND POLICIES
M. Upton and J.M. Dixon

PERFORMING ANALYSIS OF ON-DEMAND PRESSURIZED IRRIGATION SYSTEMS
LAMADDALENA, N

CONDUCTING AGRICULTURAL CENSUSES AND SURVEYS
FAO

ASSESSING THE EFFECDTS OF CHANGES IN EXPLOITATION PATERN USING LENGTH COMPOSITION DATA
JONES R.

PROPOSAL FOR AN AFRICAN NETWORK ON INTEGRATED IRRIGATION AND AQUACULTURE
MOEHI J.F

LAND AND WATER INTEGRATION AND RIVER BASIN MANAGEMENT
SANDERS, DW; PALLAS, P

NATIONAL PARKS PLANNING A MANUAL WITH ANNOTATED EXAMPLES
LANLY J.P

A SUMMARY OF THE ORGANIZATION ACTIVITIES DURING 1993
ARNEA

FISHERY STATISTICS
FAXON, W W

THE MANAGEMENT OF CROCODILES IN CAPTIVITY
BOLTON, M

IRRIGATION AND WATER CONTROL
FAO

FOREST PRODUCT
JOEET; LOY G

INTEGRATED MANAGEMENT OF COASTAL ZONES
CLARK, J R

CLIMATE FOR CROWAT
SMITH, M

FAO BULLETIN OF STATISTICS
FAXON, W; SURINAME, V

FISHERY STATISTICS
FAO

AGRICULTURAL RESIDUES WORLD DIRECTORY OF INSTITUTIONS
RASTOVSKI, A

RECOGNIZING CONTAGIOUS BOVINE PLEUROPNEUMONIA
TYLER, AA.

CONSERVATION AGRICULTURE
FOWLER, R; OLDREIVE, B

PRODUCER GAS TECHNOLOGY FOR RURAL APPLICATION
IBARRA, C E

MARKET INFORMATION SERVICES
SCHUBERT, B

WOMEN IN AGRICULTURE
OKEYO A.P

THE STATE OF FOOD INSECURITY IN THE WORLD
BANFUL A.B

COMMISSION ON PLANT GENETIC RESOURCES
SAWADOGO A

WATER QUALITY CRITERIA FOR EUROPEAN FRESHWATER FISH
VAN EIJK

PESTICIDE
MATHEWS G.A

NATIONAL AGRICULTURAL RESEARCH
BRADFORD, M

RESIDUES OF SOME VETERINARY DRUGS IN ANIMALS AND FOODS
FURROW R.

RETAIL MARKETS PLANNING GUIDE
TRACEY, W JD

BIBLIOGRAPHY OF FOOD CONSUMPTION SURVEYS
MYER

GLOBAL CONSULTATION ON AGRICULTURAL EXTENSION
FARNER B.J

SILKWORM DISEASES
LIAN YUP LU

TRADITIONAL MANAGEMENT OF SEAWEEDS IN THE DISTRICT OF LEON
PANAYOTOU, R.B; ARZEL, P

AVALANCHE CONTROL
HUGUET L

MANAGEMENT OF UPLAND WATERSHEDS
BOCHET, J

CODEX ALIMENTARIUS COMMISSION
CODEX

THE BUFFALOES OF CHINA
ROSS W; STOUT B.A

EFFICIENT FERTILIZER USE IN ACID UPLAND SOILS OF THE HUMID TROPICS
VON UEXKULL H.R

SAFETY ASSESSMENT OF FOODS DERIVED FROM GENETICALLY MODIFIED ANIMALS, INCLUDING FISH
TILLMANN, B

RISK MANAGEMENT AND FOOD SAFETY
HAEN DE; STUART; CHRISTOPHER

CARBOHYDRATES IN HUMAN NUTRITION
ANGO, O; LINEBACK, D

BIBLIOGRAPHY OF FOOD CONSUMPTION SURVEYS
PARAMARIDO, S

STREET FOODS
BARTH G.A

MANAGEMENT OF NATURAL FORESTS OF DRY TROPICAL ZONES
GATSON A

SPECIFICATIONS FOR IDENTITY AND PURITY OF CERTAIN FOOD ADDITIVES
HOWLETT J.F

INTEGRATED PLANT NUTRITION SYSTEMS
SWIFT, M.J

CONTROL OF WATER POLLUTION FROM AGRICULTURE
ONGLEY, E D

TREADLE PUMPS FOR IRRIGATION IN AFRICA
KAY, M

REMOTE SENSING AND WATER RESOURCES
PUECH C.

TRANSFER OF IRRIGATION MANAGEMENT SERVICES
VERMILLION, J L

IRRIGATION IN THE NEAR EAST REGION IN FIGURES
AZAD, A
.jpg)
TORRENT CONTROL AND STREAMBED STABILIZATION
CADENAS, L

INTERNATIONAL CODE OF CONDUCT ON THE DISTRIBUTION AND USE OF PESTCIDES
FAO

PROSPECTS FOR THE DRAINAGE OF CLAY SOILS
AMER, M H

SEA WATER INTRUSION IN COASTAL AQUIFERS GUIDELINES FOR STUDY MONITORING AND CONTROL
VAN DAM J.C

TROPICAL PALMS
DENNIS, J V
.jpg)
TROPICAL FORESTY ACTION PLAN
FLORES, R

WATER QUALITY MANAGEMENT AND CONTROL OF WATER POLLUTION
ABUBAKAR M.

A COMPUTER PROGRAM FOR IRRIGATION PLANNING AND MANAGEMENT
MARTIN S
.jpg)
AGRICULTURAL RESEARCH AND EXTENSION PROJECT
CORBETT D

RURAL AREA DEVELOPMENT PLANNING
AVROM VAL

THE GLOBAL STRATEGY FOR THE MANAGEMENT OF FARM ANIMAL GENETIC RESOURCES
MILLER R.H

METHODS OF MICRO LEVEL ANALYSIS FOR AGRICULTURAL PROGRAMMES AND POLICIES
DIXON J.M

TRENDS IN WOOD PRODUCTS
KILLMANN, F

GLOBAL FOREST LAND USE CHANGE
ERIK J; BRINK, A

FAO QUARTERLY BULLETIN OF STATISTICS
MUNDI, L

THE STATE OF THE WORLD LAND AND WATER RESOURCES FOR FOOD AND AGRICULTURE
TURRAL, H

SHARING EXPERIENCE FOR PROGRESS
EDOUARD S

FAO QUARTERLY BULLETIN OF STATISTICS
DULCIS M

SOCIOECONOMIC ATTRIBUTES OF TREES AND TREE PLANTING PRACTICES
RAINTREE B

PLANT GENETIC RESOURCES NEWSLETTER
Fao

REORIENTING THE COOPERATIVE STRUCTURE IN SELECTED EASTERN EUROPEAN COUNTRIES
Fischer, K

RESULTS AND RECOMMENDATIONS OF USERS` WORKSHOP ON REMOTE SENSING FOR EARLY WARNING AND FOOD SECURITY IN EASTERN AFRICA

ROME DECLARATION ON HUNGER
Saouma, E

PLANT GENETIC RESOURCES NEWSLETTER
Neykov S.; Stefanova L.; Todorova T.

PLANT GENETIC RESOURCES NEWSLETTER
Vom Brock K.; Christinck A.

PLANT GENERIC RESOURCES NEWSLETTER
Goli, A E

PLANT GENTIC RESOURCES NEWSLETTER
Brenner, D M; Widriechner, M P

PLANT GENETIC RESOURCES NEWSLETTER
Rao, R V.; Riley, K W

HUMAN ENERGY REQUIREMENTS
James W.P.T.; Schofield E.C.

OPERATIONAL AND ADMINISTRATIVE PROBLEMS OF FOOD AID
FitzGerald D.A.

REPORT OF THE JOINT/WHO EXPERT CONSULTATION ON PROTEIN QUALITY EVALUATION

ENERGY AND PROTEIN REQUIREMENTS

FOOD COMES FIRST
Saouma, E

PEEM III/IV/V/VI
Boss, R

A SELECTED BIBLIOGRAPHY ON INDIVIDUAL FOOD CONSUMPTION SURVEYS OF CHILDREN 0-14 YEARS OLD IN DEVELOPING COUNTRIES
Van Heel C.M.G.

WFP FIELD PROJECT PERSONNEL

A GUIDE TO STAPLE FOODS OF THE WORLD

COOPERATIVE ACTION FOR PLANT HEALTH PLANT PROTECTION IN AFRICA
AGRIS
INTERNATIONAL PROGRAMME FOR TECHNOLOGY AND RESEARCH IN IRRIGATION AND DRAINAGE
Kay, Melvyn ; Brabben, Tom

CONTROL OF WATER POLLUTION FROM AGRICULTURE
Ongley , Edwin D

TELEDETECTION ET RESSOURCES EN EAU REMOTE SENSING AND WATER RESOURCES
FAO

DRIFTNET FISHERIES AND THEIR IMPACTS ON NON-TARGET SPECIES A WORLDWIDE REVIEW
Northridge , Simon P

FAO STATISTICAL YEARBOOK 2012
PRAKASH, A; STIGLER, M

MANUAL OF FOOD QUALITY CONTROL.
FAO

STATEMENT BY MR EDOUARD SAOUMA DIRECTOR GENERAL OF THE FOOD AND AGRICULTURE ORGANIZATION OF THE UNITED NATIONS TO THE EIGHTY SEVENTH SESSION OF THE FAO COUNCIL.
FAO

JAMAICAN FAO 20 YEARS OF COOPERATION.
SEAGA, E

25 YEARS FAO FERTILIZER PROGRAMME.
FIAC

AGRICULTURAL PESTICIDE SPRAYERS.
MILLER, P.C

SCIENCE AND TECHNOLOGY IN THE WORK OF FAO.
KARL, O.H

A GLOBAL ASSESSMENT OF FISHERIES
ALVERSON, D;

PROCEEDING OF THE FAO EXPERT CONSULTATION ON THE GENETIC ASPECTS OF TRYPANOTOLERANCE.
VERHULST, A

CODEX ALIMENTARIUS COMMISSION PROCEEDURAL MANUAL.
SLORACH, S

LAW FOR WATER MANAGEMENT; A GUIDE TO CONCEPTS AND EFFECTIVE APPROACHES.
VAPNEK, J; POPP, C

FAO WHO GUIDE FOR APPLICATION OF RISK ANALYSIS PRINCIPLES AND PROCEDURES DURING FOOD SAFETY EMERGENCIES.
CALLAHAN, J; TAKEUCHI, M

CODEX ALIMENTARIUS COMMISSION PROCEDURAL MANUAL TWENTIETH EDITION.
FAO

CODEX ALIMENTARIUS COMMISSION PROCEDURAL MANUAL FIFTEENTH EDITION.
FAO

ADAPTING TO CLIMATE CHANGE.
KALAME, F; IDINOBA, M

IMPLEMENTATION GUIDELINES ON PART B OF THE CODE, THE VOLUNTARY GUIDELINES AND THE SAFETY RECOMMENDATIONS.
FAO

ENVIRONMENTAL IMPACT ASSESSMENT
COLBERT, D

REPORT OF THE FIFTH EXTERNAL PROGRAMME AND MANAGEMENT REVIEW OF THE INTERNATIONAL INSTITUTE OF TROPICAL AGRICULTURE.
CASSMAN, K

AGROVOC MULTILINGUAL AGRICULTURAL THESAURUS THIRD EDITION ENGLISH VERSION 1997.
FAO

CREATING LEGAL SPACE FOR WATER USER ORGANIZATION; TRANSPARENCY, GOVERNANCE AND THE LAW.
HODGSON, S

CODEX ALIMENTARIUS COMMISSION; PROCEDURAL MANUAL FIFTEENTH EDITION.
FAO

LAW FOR WATER MANAGEMENT; A GUIDE TO CONCEPTS AND EFFECTIVE APPROACHES.
VAPNEK, J; AYLWARD, B

FORTY YEARS OF FAO IN ASIA AND THE PACIFIC REGION; AGRICULTURAL PLANNING AND POLICY.
HJORT, H.W

FOOD AND AGRICULTURAL STATISTICS IN THE CONTEXT OF A NATIONAL INFORMATION SYSTEM.
FAO

RADURIZATION OF SCAMPI, SHRIMP AND COD.
HANNESSON, G; DAGBJARTSSON, B

FAO SEED REVIEW 1989-1990.
FAO
Fisheries
Study 11
Geofrey Kapalaga; Florence N Kivunike; Daudi Jjingo
Study 12
Geofrey Kapalaga; Florence N Kivunike; Daudi Jjingo

FIRST FARMING AS A BUSINESS
J. Rutaisire, G. Bwanika, P. Walekhwa, D. Khahwa

INREASING THE CONTRIBUTION OF SMALL-SCALE FISHERIES TO POVERTY ALLEVIATION AND FOOD SECURITY
Francis T. Christy Jr.

WATER HYCINTH IN UGANDA DISTRIBUTION COVER AND MOVEMENT
Timothy Twongo and Hannington Ochieng

EMERGENCY ACTION PLAN FOR CONTROL OF WATER HYACINTH

REPORT OF THE FAO REGIONAL WORKSHOP ON THE ELABORATION OF NATIONAL PLANS OF ACTION TO PREVENT, DETER AND ELIMINATE ILLEGAL, UNREPORTED AND UNREGULATED FISHING
Fao

REVIEW OF THE STATE OF WORLD MARINE FISHERY RESOURCES
Fao

FISHERY COMMITTE FOR THE EASTERN CENTRAL ATLANTIC
Fao

UNDERSTANDING AQUACULTURE
Fao

COASTAL FISHERIES OF LATIN AMERICA AND THE CARIBBEAN
Silvia Salas, Ratana Chuenpagdee, Anthony Charles and Juan Carlos Seijo

REPORT OF THE FAO/CECAF WORKSHOP ON PORT STATE MEASURES TO COMBAT ILLEGAL
Fao

REPORT OF THE SECOND GLOBAL FISHERIES ENFORCEMENT TRAINING WORKSHOP
Fao

FISHERY AND AQUACULTURE STATISTICS
Fao

FUTURE CLIMATE CHANGE AND REGIONAL FISHERIES: A COLLABORATIVE ANALYSIS
Fao

LIVESTOCK AND FISHERIES
J.K. Mukiibi, J.P. Esele

POLICY STATEMENT
TRESS BUCYANAYANDI

A SURVEY OF THE SUBSISTENCE AND ARTISANAL FISHERIES IN RURAL AREAS OF VITI LEVU, FIJI9694
N.J.F. Rawlinson, D.A. Milton, S.J.M. Blaber, A. Sesewa, and S.P. Sharma

REPORT OF THE FAO WORKING GROUP ON THE ASSESSMENT OF SMALL PELAGIC FISH OFF NORTHWEST AFRICA
Fao

MORTALITY OF FISH ESCAPING TRAWL GEARS
Petri Suuronen

HABITAT REHABILITATIONFOR INLABD FISHERIES
Phil Roni, Karrie Hanson, Tim Beechie, George Pess, Micheal Pollock and Devin M. Bartley

RESPONSIBLE USE OF ANTIBIOTICS IN AQUACULTURE
Pilar Hernandez Serrano

REPORT OF THE TECHNICAL CONSULTATION ON THE USE OF SUBSIDES IN THE FISHEWRIES SECTOR
Fao Fao

FISHERIES IN IRRIGATION SYSTEMS OF ARID ASIA
Tomi Petr

ECONOMIC PERFORMANCE AND FISHING EFFICIENCY OF MARINE CAPTURE FISHERIES
Uwe Tietze

DISCARDS IN THE WORLD`S MARINE FISHERIES
Kieran Kelleher

REPORT OF THE WORKSHOP ON DEEP-SEA SPECIES IDENTIFICATION
Fao

THE STATE OF WORLD FISHERIES AND AQUACULTURE 2004
Ichiro Nomura

OUTLOOK FOR FISH TO 2020
Christopher L. Delgado

FISHING BOAT DESIGNS: 2 VIBOTTOM BOATS OF PLANKED PLYWOOD CONSTRUCTION
Oyvind Gulbrandsen

REPORT OF THE SEVENTEENTH SESSION OF THE FISHERY COMMITTEE FOR EASTERN CENTRAL ATLANTIC
Fao

THE AFRICAN JOURNAL OF TROPICAL HYDROBIOLOGY AND FISHERIES
Micheni J. Ntiba

TOWARDS SAFE AND EFFECTIVE USE OF CHEMICALS IN COASTAL AQUACULTURE
Imo, Fao, Unesco, Who, Iaea, Un, Unep

FISHERY AND AQUACULTURE STATISTICS
Fao

FISHERY STATISTICS
Fao

GENERAL FISHERIES COMMISSION FOR THE MEDITERRANEAN
Fao

GENERAL FISHERIES COMMISSION FOR THE MEDITERRANEAN
Fao

REPORT OF THE FAO WORKSHOP ON BYCATCH MANAGEMENT AND LOW-IMPACT FISHING
Fao

REPORT OF THE FAO/WORLDFISH CENTER WORKSHOP ON INTERDISCIPLINARY APPROACHES TO THE ASSESSMENT OF SMALL-SCALE FISHERIES
Fao

FISH FARMING IN UGANDA
Dr. Chagema Kedera

JOIN FAO/WHO EXPERT MEETING ON THE PUBLIC HEALTH RISKS OF HISTAMINE AND OTHER BIOGENIC AMINES FROM FISH AND FISHERY PRODUCTS
Who/Fao

HANDLINING AND SQUID JIGGING
B.A. Bjarnason

GENERAL FISHERIES COMMISSION FOR THE MEDITERRANEAN COMMISSION
Fao

REPORT OF THE CONSULTATION ON THE ESTABLISHMENT OF A FISHERIES CREDIT NETWORK FOR ASIA AND THE PACIFIC
Fao

REPORT OF THE INTERREGIONAL WORKSHOP ON FINDING AND RESULTS OF MICRO-LEVEL STUDIES AND CURRICULUM DEVELOPMENT ACTIVITIES OF THE FAO/UNFPA PROJECT ON STRENGTHENING OF RESEARCH AND TRAINING IN POPULATION AND DEVELOPMENT DYNAMICS OF RURAL FISHING COMMUNITIES
Fao

REVIEW OF INLAND FISHERIES AND AQUACULTURE IN THE EIFAC AREA BY SUBREGION AND SUBSECTOR
Kevin O`Grady Penner, Middlesex, UK

DEEP SEA 2003: CONFERENCE ON THE GOVERNANCE AND MANAGEMENT OF DEEP-SEA FISHERIES
Ross Shotton

COMMITTEE FOR THE DEVELOPMENT AND MANAGEMENT OF FISHERIES IN THE SOUTH CHINA SEA
Fao

REPORT OF THE WORKSHOP AND EXCHANGE OF VIEWS ON FISCAL REFORMS FOR FISHERIES-TO PROMOTE GROWTH, POVERTY ERADICATION AND SUSTAINABLE MANAGEMENT
Stephen Cunninghan

STATUS OF FISH STOCKS AND FISHERIES OF THIRTEEN MEDIUM-SIZED AFRICAN RESERVOIRS
Martin van der Knaap

FISHERY STATISTICS
Fao

FISHERY STATISTICS
Fao

FISHERY STATISTICS
Fao

ENHANCING OR RESTORING THE PRODUCTIVITY OF NATURAL POPULATIONS OF SHELLFISH AND OTHER MARINE INVERTEBRATE RESOURCES
J.F. Caddy

TOWARDS SUSTAINABLE DEVELOPMENT AND MANAGEMENT OF THE LAKE VICTORIA BASIN
Naro

REPORT OF THE WORKSHOP OF NATIONAL COORDINATORS OF THE UNEP/GEF/FAO PROJECT ON REDUCING THE IMPACT OF TROPICAL SHRIMP TRAWLING FISHERIES ON LIVING MARINE RESOURCES THROUGH THE ADOPTATION OF ENVIRONMENTALLY FRIENDLY TECHNIQUES AND PRACTICES
Fao

SUMMARY REPORT OF AND PAPERS PRESENTED AT THE TENTH SESSION OF THE WORKING PARTY ON FISH TECHNOLOGY AND MARKETING
Fao

REPORT OF THE CONSULTATION ON THE APPLICATION OF ARTICLE 9 OF THE FAO CODE OF CONDUCT FOR RESPONSIBLE FISHERIES IN THE MEDITERRANEAN REGION
Fao

REPORT OF THE FAO/CIFA/NACA EXPERT CONSULTATION ON THE INTENSIFICATION OF FOOD PRODUCTION IN LOW INCOME FOOD DEFICIT COUNTRIES THROUGH AQUACULTURE
Fao

GENERAL FISHERIES COMMISSION FOR THE MEDITERRANEAN COMMISSION
CGPM,Fao

AQUACULTURE PROJECT FORMULATION
David Insull and Colin E. Nash

SMALL-SCALE FISH FARMING FOR FOOD SECURITY AND INCOME GNERATION
Dept of ID

CONSERVATION OF LIVESTOCK AND FISH GENETIC RESOURCES
Drs John Gibson and Roger Pullin

WESTERN CENTRAL ATLANTIC FISHERY COMMISSION
Fao

PROSPECTIVE ANALYSIS OF AQUACULTURE DEVELOPMENT
Nathanael Hishamunda, Florence Poulain and Neil Ridler

MICROFINANCE IN FISHERIES AND AQUACULTURE
Uwe Tietze and Lolita V. Villareal

MEASURING AND ASSESSING CAPACITY IN FISHERIES
S. Pascoe, J.E. Kirkley, D. Greboval, and C.J Morrison-Paul

MANUAL OF FISHERIES SAMPLING SURVEYS: METHODOLOGIES FOR ESTIMATIONS OF SOCIO-ECONOMIC INDICATORS IN THE MEDITERRANEAN SEA
Evalina Sabatella and Ramon Franquesa

STRATEGIES FOR WATER HYACINTH CONTROL
R. Charudattan, Ricardo Labrada, Ted D. Center and Christine Kelly-Begazo

REPORT OF THE TWENTY-FOURTH SESSION OF THE EUROPEAN INLAND FISHERIES ADVISORY COMMISSION
Fao

REPORT OF THE TENTH SESSION OF THE SUB-COMMITTEE ON FISH TRADE
Fao

REPORT OF THE TWENTY-SEVEN SESSION OF THE COMMITTEE ON FISHERIES
Fao

GENERAL FISHERIES COMMISSION FOR THE MEDITERRANEAN
Fao

REPORT OF THE SIXTH SESSION OF THE SUB-COMMITTEE ON AQUACULTURE
Fao

DEVELOPING FISH LANDING CENTRES: EXPERIENCES AND LESSONS FROM SRI LANKA
Simon Diffey

REGIONAL WORKSHOP ON PREPAREDNESS AND RESPONSE TO AQUATIC ANIMAL HEALTH EMERGENCIES INASIA
Rohana P. Subasinghe and J. Richard Arthur

DEEP SEA 2003: CONFERENCE ON THE GOVERNANCE AND MANAGEMENT OF DEEP-SEA FISHERIES
Ross Shotton

REPORT OF THE ELEVENTH SESSION OF THE SUB-COMMITTEE FOR LAKE TANGANYIKA
Fao

WESTERN CENTRAL ATLANTIC FISHERY COMMISSION
Fao

REPORT OF THE SIXTH SESSION OF THE ADVISORY
Fao

DIRECTORY OF AGRICULTURAL RESEARCH PROJECTS IN UGANDA
Esther Lwanga-Semakula, Joyce Adupa, Janet Okot, and Julius Lubega

BANGKOK FAO TECHNICAL CONSULTATION ON POLICIES FOR SUSTAINABLE SHRIMP CULTURE
Fao

SHARING THE FISH `06 ALLOCATION ISSUES IN FISHERIES MANAGEMENTw
Fao

MARINE PROTECTED AREAS COUNTRY CASE STUDIES ON POLICY, GOVERNANCE AND INSTITUTIONAL ISSUES
Jessica S. Sanders, Dominique Greboval and Antonia Hjort

REPORT OF THE SEVENTH SESSION OF THE SUB-COMMITTEE ON AQUACULTURE
Fao

REPORT OF THE FAO TECHNICAL WORKSHOP ON A SPATIAL PLANNING DEVELOPMENT PROGRAMME FOR MARINE CAPTURE FISHERIES AND AQUACULTURE
Fao

CASE STUDIES ON THE ALLOCATION OF TRANSFERABLE QUOTA RIGHTS IN FISHERIES
Ross Shotton

IMPACT OF RISING FEED INGREDIENT PRICES ON AQUACULTURE PRODUCTION
Krishen J. Rana and Mohammad R. Hasan

THE DRAFT ON THE NATIONAL FISHERIES POLICY
Dept of Fisheries

REPORT OF THE TWENTY-THIRD SESSION OF THE COORDINATING PARTY ON FISHERY STASTICS
Fao

REPORT OF THE SIXTH MEETING OF THE RECOFI WORKING GROUP ON FISHERIES MANAGEMENT
Fao

RECENT WORK IN BANGLADESH ON THE UTILISATION OF WATER HYACINTH
Dr. S Z Haider

MEASURING CAPACITY IN FISHERIES
S. Pascoe and D. Greboval

FISHERY STATISTICS
Fao

REPORT OF THE SYMPOSIUM ON INLAND FISHERIES MANAGEMENT AND THE AQUATIC ENVIRONMENT
Fao

A DRAFT ON SINO-UGANDA FISHERIES JOINT VENTURE COMPANY LIMITED
Maaif

MARITIME SOCIETIES, FISHERIES LAW AND INSTITUTIONS IN THE WESTERN MEDITERRANEAN
Prof. F. Feral

FISH STOCK ASSESSMENT MANUAL
Emygdio L. Cadima

UTILIZATION AND CONTROL OF WATER HYACINTH IN SUDAN
Ottmar Philipp, Werner Koch and Heinz Koser

AQUACULTURE DEVELOPMENT
Fao

AQUACULTURE DEVELOPMENT: SIMPLE FISH FARMING METHODS FOR RURAL LIVELIHOOD
Asiimwe Rashid

ANTHROPOGENIC AND ENVIRONMENTAL IMPACTS ON THE ABUNDANCE AND DISTRIBUTION OF COMMERCIAL FISH STOCKS OF LAKE VICTORIA, EAST AFRICA
Anthony Taabu-Munyaho

SETTING UP AND RUNNING A SMALL OR FISH PROCESSING ENTERPRISE
Barrie Axtell, Peter Fellows, Linus Gedi, Henry Lubin, Peggy Oti-Boatend and Rodah Zulu

FISHERIES MANAGEMENT
Fao

PRINCIPLES OF HYDRAULIC MANAGEMENT OF COASTAL LAGOONS FOR AQUACULTURE AND FISHERIES
John M. Miller. Leonard J. Pietrafesa and Ned P. Smith

FISHERY INTENSIFICATION IN SMALL WATER BODIES
John F. Moehl Jr and William D. Davies

FISHERIES MANAGEMENT
Fao

FARM-MADE AQUAFEEDS
Micheal B. New, Albert G.J. Tacon and Imre Csavas

GUIDE FOR IDENTIFYING, ASSESSING AND REPORTING ON SUBSIDIES IN THE FISHERIES SECTOR
Lena Westlund, FAO Consultant

REPORT OF THE EXPERT CONSULTATION ON FISHING VESSELS OPERATING UNDER OPEN REGISTERS AND THEIR IMPACT ON ILLEGAL, UNREPORTED AND UNREGULATED FISHING
Fao

REPORT OF THE THIRD MEETING OF THE WECAF AD HOC FLYINGFISH WORKING GOUP OF THE EASTERN CARIBBEAN
Fao

RECENT DEVELOPMENTS IN THE TUNA INDUSTRY
Makoto Peter Miyake, Patrice Guillotreau, Chin-Hwa Sun ans Gakushi Ishimura

REPORT OF THE EXPERT CONSULTATION ON INTERNATIONAL FISH TRADE AND FOOD SECURITY
Fao

FISHING WITH BEACH SEINES
Uwe Tietze. Robert Lee. Susana Siar. Thomas Moth-Poulsen and Hans E. Bage

REPORT OF THE FAO WORKING GROUP ON THE ASSESSMENT OF SMALL PELAGIC FISH OFF NORTHWEST AFRICA
Fao

REPORT OF THE TWENTY-NINTH SESSION OF THE COMMITTEE ON FISHERIES
Fao

GENERAL FISHERIES COMMISSION FOR THE MEDITERRANEAN
Marie Christine Monfort

FISHERIES AND AQUACULTURE EMERGENCY REPONSE GUIDANCE
Benjamin Cattermoul, David Brown, and Florence Poulain

REPORT OF THE SIXTH SESSION OF THE SCIENTIFIC ADVISORY COMMITTEE
Fao

SHARK UTILIZATION, MARKETING AND TRADE
Stefania Vannuccini

FISHERY STATISTICS
Fao

FISHERY STATISTICS
Fao

MANAUL ON THE PRODUCTION AND USE OF LIVE FOOD FOR AQUACULTURE
Patrick Lavens and Patrick Sorgeloos

THE STATE OF WORLD FISHERIES AND AQUACULTURE
Fao

MANUAL OF METHODS IN AQUATIC ENVIRONMENT RESEARCH
G. Bellan and L. Dalla Venezia

ROAD TRANSPORT OF FISH AND FISHERY PRODUCTS
G.C. Eddie

REPORT OF THE SYMPOSIUM ON SELECTION, HYDRIDIZATION AND GENETIC ENGINEERING IN AQUACULTURE
B. Chevassus and A.G. Coche

REPORT OF THE FAO WORKING GROUP ON THE ASSESSMENT OF SMALL PELAGIC FISH OFF NORTHWEST AFRICA
Fao

ENHANCING OR RESTORING
CADDY, J.F

THE STATE OF THE WORLD FISHERIES AND AQUACULTURE.
GRAZIANO, J.S

MARINE PROTECTED AREAS.
SANDERS, S.J; GREBOVAL, D.

COMMITTEE FOR INLAND FISHERIES OF AFRICA.
FAO UN

REPORT OF THE FAO WORKING GROUP ON THE ASSESSMENT OF SMALL SCALE PELAGIC FISH OFF NORTHWEST AFRICA.
BARROS, P; CARAMELO, M.A.

FISHERY STATISTICS
Fao

REPORT OF THE TWENT-SIXTH SESSION OF THE COMMITTEE ON FISHERIES
Fao

THE STATE OF WORLD FISHERIES AND AQUACULTURE 2012
Arni, M M

CHRONICLE OF CUBAN MARINE FISHERIES (1935-1995)
Baisre, J A

DEFINITION AND CLASSIFICATION OF FISHING GEAR CATEGORIES
Nedelec, C

A REVIEW OF OPERATIONAL INTERACTIONS BETWEEN PINNIPEDS AND FISHERIES
Patti, A W

VIRTUAL POPULATION ANALYSIS
Hans, L; Paul, M

CODE OF CONDUCT FOR RESPONSIBLE FISHERIES
Fao

AQUACULTURE DEVELOPMENT IN CHINA
Nathanael, H; Rohana, P S

GUIDELINES ON THE COLLECTION OF STRUCTURAL AQUACULTURE STATISTICS
Rana, K J

REPORT OF THE CONSULTATION ON INTERACTIONS BETWEEN SEA TURTLES AND FISHERIES WITHIN AN ECOSYSTEM CONTEXT
Fao

REPORT AND PROCEEDINGS OF THE SIXTH FAO EXPERT CONSULTATION ON FISH TECHNOLOGY IN AFRICA
Fao

REPORT OF THE TECHNICAL WORKSHOP ON THE STATUS, LIMITATIONS AND OPPORTUNITIES FOR IMPROVING THE MONITORING OF SHARK FISHERIES AND TRADE
Fao

A STRATEGIC REASSESSMENT OF FISH FARMING POTENTIAL IN AFRICA
Jose, A M; Shree, S N

USE OF ALGAE AND AQUATIC MACROPHYTES AS FEED IN SMALL-SCALE AQUACULTURE
Mohammad, R H; Rina, C

THE POTENTIAL OF SPATIAL PLANNING TOOLS TO SUPPORT THE ECOSYSYTEM APPROACH TO AQUACULTURE
Jose, A M; McDaid, J; Kapetsky; Doris, S

LOW-COST FISH RETAILING EQUIPMENT AND FACILITIES IN LARGE URBAN AREAS OF SOUTHEAST ASIA
Medina, A F P

REPORT OF THE FIFTEENTH SESSION OF THE COMMITTEE FOR INLAND FISHERIES AND AQUACULTURE OF AFRICA
Fao

REPORT OF THE GLOBAL CONFERENCE ON SMALL-SCALE FISHERIES SECURING SUSTAINABLE SMALL-SCALE FISHERIES: GRINGING TOGETHER RESPONSIBLE FISHERIES AND SOCIAL DEVELOPMENT
Fao

REPORT OF THE TWELFTH SESSION OF THE SUB-COMMITTEE ON FISH TRADE
Fao

NATIONAL VIEWS FOR AQUACULTURE DEVELOPMENT IN AFRICA
Balarin, J D

OPTIMUM FISHING EFFORT AND ECONOMIC RENT: A CASE STUDY OF CYPRUS
Rognvaldura, H

MANAGEMENT CONCEPTS FOR SMALL-SCALE FISHERIES: ECONOMIC AND SOCIAL ASPECTS
Theodore, P

PREDICTIVE FISH YIELD MODELS FOR LAKES AND RESERVOIRS OF THE PHILIPPINES, SRI LANKA AND THAILAND
Jacques, M; Sena S S

FISHERIES AND RESEARCH FOR TUNAS AND TUNA-LIKE SPECIES IN THE WESTERN CENTRAL ATLANTIC
Robin, M

INLAND FISHERY ENHANCEMENTS
Tomi, P

QUALITY AND QUALITY CHANGES IN FRESH FISH
Huss, H H

PARTICIPATORY ANALYSIS, MONITORING AND EVALUATION FOR FISHING COMMUNITIES
Maine, R A

REVIEW OF THE STATE OF WORLD MARINE FISHERY RESOURCES
Fao

REFERENCE POINTS FOR FISHERIES MANAGEMENT
Caddy, J. F; Mahon, R

PROMOTION OF SUSTAINABLE COMMERCIAL AQUACULTURE IN SUB-SAHARAN AFRICA
Neil, R; Nathanael, H

AN INTRODUCTION TO MONITORING, CONTROL AND SURVEILLANCE SYSTEMS FOR CAPTURE FISHERIES
Flewwelling, P.

WORLD REVIEW OF HIGHLY MIGRATORY SPECIES AND STRADDLING STOCKS
Garcia, S. M; Caddy, J. F; Csirke, J; Die, D; Grainger

CHRONICLES OF MARINE FISHERY LANDINGS (1950-1994)
Grainger, R J R

OVERVIEW OF WORLD ELASMOBRANCH FISHERIES
Ramon, B

CASE STUDIES OF THE MANAGEMENT OF ELASMONBRANCH FISHERIES
Ross, S

DETERMINATION OF GROWTH IN BONY FISHERIES FROM OTOLITH MICROSTRUCTURE
Morales-Nin, B

MANAGEMENT TECHNIQUES FOR ELASMOBRANCH FISHERIES
John, A M; Ramon, B

PUTTING INTO PRACTICE THE ECOSYSTEMAPPROACH TO FISHERIES
Fao

FISHING BOAT CONSTRUCTION: 3 BUILDING A FERROCEMENT FISHING BOAT
Richard, O N; Jeremy, M T

INTERACTIONS OF PACIFIC TUNA FISHERIES
Richard S. S; Jacek, M; Sarah, L

FISHERY MANAGEMENT OPTIONS FOR LESSER ANTILLES COUNTRIES
Robin, M

INTRODUCTION TO TROPICAL FISH STOCK ASSESSMENT PART 2-EXERCISE
Sparre, P; Siebren, C V

MANUAL ON SAMPLE-BASED DATA COLLECTION FOR FISHERIES ASSESSMENT
Per Johan, S

RESEVOIR FISHERIES OF INDIA
Sugunan, V V

FISHING BOAT CONSTRUCTION: 2 BUILDING A FIBREGLASS FISHING BOAT
Coackley, N

A REVIEW OF LENGTH-BASED APPROACHES TO ASSESSING FISH STOCKS
Gulland, J; Rosenberg, A

MANAGING FISHING CAPACITY
Steve, C; Dominique, G

THE ECONOMICS OF OCEAN RANCHING
Ragnar, A

RESOURCES, FISHINGAND BIOLOGY OF THE TROPICAL TUNAS OF THE EASTERN CENTRAL ATLANTIC
Fonteneau, A; Marcille, J

GUIDELINES FOR DESIGNING DATA COLLECTION AND SHARING SYSTEMS FOR CO-MANAGED FISHERIES
Ashley, S H; Robert, I A; Devin, B; Malene, Richard, G; Wolf, H; Dirk, L; John, P; Parvin, S; Paul, T; Suzannah, W

THE STATE OF WORLD FISHERIES AND AQUACULTURE 2016
Jose Graziano, S

REGIONAL REVIEW ON STATUS AND TRENDS IN AQUACULTURE DEVELOPMENT IN THE NEAR EAST AND NORTH AFRICA-2010
Issam, K

CASE STUDIES OF THE MANAGEMENT OF ELASMOBRANCH FISHERIES
Ross, S

MANAGING FISHING CAPACITY
Dominique, G

GENETIC DIVERSITY OF MARINE FISHERIES RESOURCES
Smith, P J

FISHERIES CHARACTERISTICS OF THE SHARED LAKES OF THE EAST AFRICAN RIFT
Greboval, D M; Bellemans; Fryd, M

INTERACTIONS OF PACIFIC TUNA FISHERIES
Richard, S S; Jacek M; Sarah, L

ASIA REGIONAL TECHNICAL GUIDELINES ON HEALTH MANAGEMENT FOR THE RESPONSIBLE MOVEMENT OF LIVE AQUATIC ANIMALS AND THE BEIJING
Fao

TERRITORIAL USE RIGHTS AND ECONOMIC EFFICIENCY: THE CASE OF THE PHILIPPINE FISHING CONCESSIONS
Ian R S; Theodore P

MANUAL OF METHODS IN AQUATIC ENVIRONMENT RESEARCH
Donald, L R; Philip, S O

SMALL-SCALE FISHING WITH DRIFTNETS
Ludvik, K; Bjorn, A B

THE FISHERY RESOURCES OF PACIFIC ISLAND COUNTRIES
Bour, W

DRIFTNET FISHERIES AND THEIR IMPACTS ON NON-TARGET SPECIES: A WORLDWIDE REVIEW
Simon, P N

AN UPDATED WORLD REVIEW OF INTERACTIONS BETWEEN MARINE MAMMALS AND FISHERIES
Simon, P N

INLAND FISHERIES OF EUROPE
William, A D

LAMPREYS OF THE WORLD: AN ANNOTATED AND ILLUSTRATED CATALOGUE OF LAMPREY SPECIES KNOWN TO DATE
Claude, B R

DIRECTORY OF FISHINGG TECHNOLOGY INSTITUTIONS AND SERVICES
Fao

REPORT OF THE TECHNICAL CONSULTATION ON THE ALLOCATION OF FISHERY RESOURCES
Jean-Louis, G

TROPICAL SHRIMP FISHERIES
Vendeville, P

SEA FARMING AND SEA RANCHING IN CHINA
Jiansan, J; Jiaxin, C

RIVER FISHERIES
Welcomme, R.L

INTEGRATED AGRICULTURE-AQUACULTURE
Fao

USE OF PROPERTY RIGHTS IN FISHERIES MANAGEMENT
Ross, S

RAPID RURAL APPRAISAL, PARTICIPATORY RURAL APPRAISAL AND AQUACULTURE
Philip, T

FREEZING AND REFRIGERATED STORAGE IN FISHERIES
Johnston, W.A; Nicholson, F.J; Roger, A; Stroud, D.

REPORT OF THE SEVENTH SESSION OF THE COMMITTEE ON RESOURCE MANAGEMENT
Fao

REPORT OF THE AD HOC MEETING ON MANAGEMENT OF DEEPWATER FISHERIES RESOURCES OF THE SOUTHERN INDIAN OCEAN
Fao

MANAGEMENT OF MULTISPECIES RESOURCES AND MULTI-GEAR FISHERIES
Nagasaki, F; Chikuni, S.

FIELD IDENTIFICATION GUIDE TO THE SHARKS AND RAYS OF THE MEDITERRANEAN AND BLACK SEA
Fabrizio, S

REPORT OF THE FIRST SESSION OF THE WORKING PARTY ON FISHERY ECONOMICS AND PLANNING
Fao

STRUCTURES ASSISTING THE MIGRATIONS OF NON-SALMONID FISH: USSR
Pavlov, D.S.

FISHERIES CREDIT PROGRAMMES AND REVOLVING LOAN FUNDS: CASE STUDIES
Tietze, U; Merrikinn, P

REPORT OF THE THIRD INTERGOVERNMENTAL CONSULTATION ON THE ESTABLISHMENT OF A SOUTHWEST INDIAN OCEAN FISHERIES COMMISSION
Fao

FEED INGREDIENTS AND FERTILIZERS FOR FARMED AQUATIC ANIMALS
Albert, G.J. T; Marc, M; Mohammed, R. H

REPORT OF THE FOURTH SESSION OF THE SUB-COMMITTEE FOR THE PROTECTION AND DEVELOPMENT OF THE FISHERIES IN THE SAHELIAN ZONE
Fao

ENGINEERING APPLICATIONS: 3. HYDRAULICS FOR SMALL FISHING VESSELS
Daniel, C

EFFECTS OF RIVERINE INPUTS ON COASTAL ECOSYSTEMS AND FISHERIES RESOURCES
Fao

SYMPOSIUM ON THE DEVELOPMENT AND MANAGEMENT OF FISHERIES IN SMALL WATER BODIES
Fao

REPORT AND DOCUMENTATION OF THE INTERNATIONAL WORKSHOP FISHERIES INSTRUMENTS AND FACTORS OF UNSUSTAINABILITY AND OVEREXPLOITATION IN FISHERIES
Fao

GEOGRAPHICAL INFORMATION SYSTEMS: APPLICATIONS TO MARINE FISHERIES
Geoffery, J. M; Thang Do Chi

BULLETIN OF FISHERY STATISTICS
Fao

NATIONAL REPORTS AND SELECTED PAPERS PRESENTED AT THE FIRST SESSION OF THE WORKING PARTY ON FISHERIES ECONOMICS AND PLANNING
Fao

SOURCE BOOK FOR THE INLAND FISHERY RESOURCES OF AFRICA
Vanden, J. P; Bossche; Bernacsek, G. M

FISHERY STATISTICS
Fao

MARINE FISHERY RESOURCES OF THE ANTILLES
Fao

ADJUSTMENTS TO CHANGES IN FISHERIES LAW AND ECONOMICS
Barbara, C C

REVIEW OF THE STATE OF WATER POLLUTION AFFECTING INLAND FISHERIES IN SOUTHEAST ASIA
John, S A

IMPACTS OF PREIMPOUNDMENT CLEARING ON RESERVOIR ECOLOGY AND FISHERIES IN THE UNITED STATES AND CANADA
Gene, R. P

AQUATIC TELEMETRY ADVANCES AND APPLICATIONS
Maria, T S; Giusep L; Gerd, M

MANUAL OF METHODS IN AQUATIC ENVIRONMENT RESEARCH
John S. G; Alasdair D. M; Jose S

FISH CULTURE IN UNDRAINABLE PONDS
Kumar, D

DISTRIBUTION AND IMPORTANT BIOLOGICAL FEATURES OF COASTAL FISH RESOURCES IN SOUTHEAST ASIA
Somsak, C; Purwito, M

A GEOGRAPHICAL INFORMATION SYSTEM AND SATELITE REMOTE SENSING TO PLAN FOR AQUACULTURE DEVELOPMENT: A FAO-UNEP/GRID COOPERATIVE STUDY IN COSTA RICA
James M. K; McGregor, L; Herbert, N E

CONSERVATION OF THE GENETIC RESOURCES OF FISH: PROBLEMS AND RECOMMENDATIONS
Fao

CAGE AND PEN FISH FARMING
Beveridge, M C.M

A TECHNICAL GUIDE TO SUPPORT THE IMPLEMENTATION OF THE VOLUNTARY GUIDELINES ON THE RESPONSIBLE GOVERNANCE OF TENURE OF LAND, FISHERIES AND FORESTS IN THE CONTEXT OF NATIONAL FOOD SECURITY
Fao

DEMOGRAPHIC CHANGE IN COASTAL FISHING COMMUNITIES AND ITS IMPLICATIONS FOR THE COASTAL ENVIRONMENT
Tietze, U; Groenewold, G; Marcoux, A

MANUAL ON HATCHERY PRODUCTION OF SEABASS AND GILTHEAD SEABREAM. VOLUME 2
Alessandro, M; Mario, P F C; Rene V

ECONOMIC ASPECTS OF SMALL-SCALE FISH CANNING
Edwards D; Street P.R; Clucas I.J

FISH HANDLING, PRESERVATION AND PROCESSING IN THE TROPICS: PART 2
Clucas I.J; Cole R,C; Bostock T.W; Rogers J.F; Stephens; Debling G.B; Stephens A.D; Debling G.B; Clifford M; Knowless M; Horner W.

THE HANDLING, PROCESSING AND MARKETING OF FISH IN BANGLADESH
Coulter J.P; Disney J.G

SOLAR DRYING OF FISH AND PADDY
Unmole, H

REPORT OF THE AD HOC TECHNICAL CONSULTATION ON THE DEVELOPMENT AND MANAGEMENT OF THE FISHERIES OF LAKE KARIBA
Fao

FISHERIES MANAGEMENT
Fao

REPORT ON DEEP SEA 2003, AN INTERNATIONAL CONFERENCE ON GOVERNANCE AND MANAGEMENT OF DEEP-SEA FISHERIES
Fao

FISHERIES LAWS AND REGULATIONS IN THE MEDITERRANEAN: A COMPARATIVE STUDY
Cacaud, P

ELASMOBRANCHS OF THE MEDITERRANEAN AND BLACK SEA
Bradai, M N; Becgir; Enajjar, S

MANAGEMENT OF LARGE PELAGIC FISHERIES IN CARICOM COUNTRIES
Mahon, R; McConney, P

REPORT OF THE FIRST MEETING OF DIRECTORS OF THE NETWORK OF AQUACULTURE CENTRES IN CENTRAL-EASTERN EUROPE (NACEE)
Fao

REPORT OF THE FAO AD HOC EXPERT ADVISORY PANEL FOR THE ASSESSMENT OF PROPOSALS TO AMEND APPENDICES I AND II OF CITIES CONCERNING COMMERCIALLY-EXPLOITED AQUATIC SPECIES
Fao

REPORT OF THE TECHNICAL CONSULTATION ON SEA TURTLES CONSERVATION AND FISHERIES
Fao

REPORT OF THE FIFTH SESSION OF THE ADVISORY COMMITTEE ON FISHERIES RESEARCH
Fao

REPORT OF THE REGIONAL WORKSHOP ON APPROACHES TO REDUCING SHRIMP TRAWL BYCATCH IN THE WESTERN INDIAN OCEAN
Fao

REPORT OF THE CFU/FAO FISHERIES STATISTICS AND DATA MANAGEMENT WORKSHOP
Fao

REPORT OF THE EXTRAORDINARY SESSION
Fao

REPORT OF THE TENTH SESSION OF THE SUB-COMMITTEE FOR LAKE TANGANYIKA
Fao

COMPUTER PROGRAMS FOR FISH STOCK ASSESSMENT
Sparre P.

REPORT OF THE FOURTH INTERGOVERNMENTAL CONSULTATION ON THE ESTABLISHMENT OF A SOUTHWEST INDIAN OCEAN FISHERIES COMMISSION
Fao

ASSURANCE OF SEAFOOD QUALITY
Huss H.H

AN INTRODUCTION TO MONITORING, CONTROL AND SURVEILLANCE SYSTEMS FOR CAPTURE FISHERIES
Flewwelling P.

FREEZING AND REFRIGERATED STORAGE IN FISHERIES
Johnston W.A; Nicholson F.J; Roger; Stroud G.D

FISH AND FISHERIES AT HIGHER ALTITUDES
Petr T.

DIRECTORY OF FISHERIES AND AQUACULTURE INFORMATION RESOURCES IN AFRICA
Collins, J; Fode, K K

REPORT AND PAPERS PRESENTED AT THE SECOND WORKSHOP ON FISH TECHNOLOGY, UTILIZATION AND QUALITY ASSURANCE IN AFRICA
Fao

ECONOMIC ENGINEERING APPLIED TO THE FISHERY INDUSTRY
Zugarramurdi, A; Parin, M A; Lupin, H M

AN INTRODUCTION TO MONITORING, CONTROL AND SURVEILLANCE SYSTEMS FOR CAPTURE FISHERIES
Flewwelling P.
MARKETING AND CONSUMPTION OF FISH IN EASTERN AND SOUTHERN AFRICA
Reynolds, E J.

FISHING BOAT DESIGNS: 2 V-BOTTOM BOATS OF PLANKED AND PLYWOOD CONSTRUCTION
Gulbrandsen, O

REGISTER OF INTERNATIONAL TRANSFERS OF INLAND FISH SPECIES
Welcome R.L

SMALL-SCALE FISH LANDING AND MARKETING FACILITIES
Pizzali, M A F

PRODUCTION ENHANCEMENT IN STILL-WATER POND CULTURE
Coche, A G

ICE IN FISHEIES
Graham J; Johnston W. A; Nicholson F.J.

COMPUTER PROGRAMS FOR FISH STOCK ASSESSMENT: APPLICATIONS FOR THE HP 41 CV CALCULATOR
Vakily J.M; Palomares M.L; Pauly D

STATUS OF INTERACTIONS OF PACIFIC TUNA FISHERIES IN 1995
Richard S. Shomura; Majkowski, J; Harman, R F
SOME CONSIDERATIONS FOR THE MANAGEMENT OF COASTAL LAGOON AND ESTUARINE FISHERIES
Kapetsky, J M

WATER QUALITY CRITERIA FOR EUROPEAN FRESHWATER FISH
EIFAC

STOCKING AND INTRODUCTION OF FISH IN LAKES AND RESERVOIRS IN THE ASEAN COUNTRIES
Balayut, E A

MARINE RESOURCE MAPPING: AN INTRODUCTORY MANUAL
Butler M.J.A; LeBlanch C.;Belbin J.A.; MacNeill J.L.

INTRODUCTION TO FISHERIES MANAGEMENT ADVANTAGES, DIFFICULTIES AND MECHANISMS
Troadec J-P

FISHERIES MANAGEMENT IN SOUTH-EAST LAKE MALAWI, THE UPPER SHIRE RIVER AND LAKE MALOMBE
GOM/FAO/UNDP

INLAND FISHERIES IN MULTIPLE USE OF RESOURCES
Petr T.

INTERNATION DIRECTORY OF FISH TECHNOLOGY INSTITUTES
Fao

INTRODUCTION TO TROPICAL FISH STOCK ASSESSMENT PART 2-EXERCISES
Per Sparre; Erik Ursin; Siebren C. Venema

THE FISHERY RESOURCES OF PACIFIC ISLAND COUNTRIES
Conand C.

OCCUPATIONAL AND GEOGRAPHICAL MOBILITY IN AND OUT OF THAI FISHERIES
Theodore; Donna, P

THE POTENTIAL YIELD OF FISH STOCKS
Beddington J.R.; Cooke J.G.

DEFINITION AND CLASSIFICATION OF FISHING GEAR CATEGORIES
Prado J; Claude, N

SELECTED WORKING PAPERS SUBMITTED TO THE ELEVENTH SESSION OF THE ADVISORY COMMITTEE OF EXPERTS ON MARINE RESOURCES RESEARCH
Fao

AN INTRODUCTION TO THE ECONOMICS OF FISHERIES MANAGEMENT
MacKenzie W.C.

REPORT OF THE MEETING OF FISHERIES MANAGERS AND MINISTERS OF THE WECAF AD HOC WORKING GROUP ON SHRIMP AND GROUNDFISH RESOURCES IN THE BRAZIL-GUIANAS SHELF
Fao

REGIONAL REVIEWS AND NATIONAL MANAGEMENT REPORTS FOURTH WORKSHOP ON THE ASSESSMENT AND MANAGEMENT OF SHRIMP AND GROUNDFISH FISHERIES ON THE BRAZIL-GUIANAS SHELF
Fao

REPORT OF THE ELEVENTH SESSION OF THE FISHERY COMMITTEE FOR THE EASTERN CENTRAL ATLANTIC (CECAF)
Fao

REPORT OF THE NINTH SESSION OF THE INDIAN OCEAN FISHERY COMMISSION
Fao

FISHERY COMMITTEE FOR THE EASTERN CENTRAL ATLANTIC
Fao

REPORT OF THE SECOND SESSION OF THE SUB-COMMITTTEE ON FISH TRADE
Fao

REPORT OF THE SECOND SESSION OF THE WORKING PARTY ON FISHERIES TECHNOLOGY
Fao

REPORT OF THE SECOND GFCM TECHNICAL CONSULTATION ON RED CORAL OF THE MEDITERRANEAN
Fao

MANUAL OF METHODS IN AQUATIC ENVIRONMENT RESEARCH
Fao

INTRODUCING FISHERIES SUBSIDIES
Schrank, W E

TECHNO-ECONOMIC PERFORMANCE OF MARINE CAPTURE FISHERIES
Tietze U.; Le Ry J.-M.; Lasch R.

REPORT OF THE ELEVENTH SESSION OF THE ADVISORY COMMITTEE OF EXPERTS ON MARINE RESOURCES RESEARCH
Fao

KRILL FISHERIES OF THE WORLD
Nicol, S; Yoshinari, E

KRILL FISHERIES OF THE WORLD
Nicol, S; Endo, Y

INDIVIDUAL QUOTA MANAGEMENT IN FISHERIES
Gary, R. M

MANUAL OF PROCEDURES FOR THE IMPLEMENTATION OF THE ASIA REGIONAL TECHNICAL GUIDELINES ON HEALTH MANAGEMENT FOR THE RESPONSIBLE MOVEMENT OF LIVE AQUATIC ANIMALS
Fao

FUEL AND FINANCIAL SAVINGS FOR OPERATORS OF SMAL FISHING VESSELS
Wilson J.D.K.

CHECKLIST OF THE PARASITES OF FISHERIES OF THE PHILIPPINES
Arthur, R J.; Susan Lumanian, M
THE REPORT OF THE SEVENTH SESSION OF THE COMMITTEE FOR INLAND FISHERIES OF AFRICA
FAO

REPORT OF THE FAO/CITIES WORKSHOP TO REVIEW THE APPLLICATION AND EFFECTIVENESS OF INTERNATIONAL REGULATORY MEASURES FOR THE CONSERVATION AND SUSTAINABLE USE OF ELASMOBRANCHS
Fao

AQUACULTURE FEED AND FERTILIZER RESOURCES ATLAS OF THE PHILIPPINES
Cruz, P S

A BIO-ECONOMIC MODEL OF SEQUENTIAL ARTISANAL AND INDUSTRIAL SHRIMP FISHERIES
Willman R.; Garcia S.M.

DEEP SEA 2003 CONFERENCE AN D MANAGEMENT OF DEEP SEA FISHERIES.
SHOTTON, R,

COMMITTEE ON FISHERIES REPORT OF THE TENTH SESSION OF THE SUB COMMITTEE ON FISH TRADE.
MIGUEL, O.

GENERAL FISHERIES COMMISION FOR THE MEDITERRANEAN
FAO

REPORT OF THE SIXTH SESSION OF THE SUB COMMITTEE ON AQUACULTURE 2012
FAO

DEVELOPING FISH LANDING CENTRES, EXPERIENCES AND LESSONS FROM SRI LANKA.
DIFFEY, S.

GENERAL FISHERIES COMMISSION FOR THE MEDITERRANEAN
FAO

FARM MADE AQUAFEEDS.
NEW, B.M.

FAO FISHERIES REPORT
NOMURA, I

STRATEGIES FOR WATER HYACINTH CONTROL.
CHARUDATTAN, R.; LABRADA, R.

REGIONAL WORKSHOP ON PREPAREDNESS AND RESPONSE TO AQUATIC ANIMAL HEALTH EMERGENCIES IN ASIA.
SUBASINGHE, P.R; ARTHUR, J.R.

FISHING WITH BEACH SEINES.
TIETZE, U; LEE, R.

REPORT OF THE SECOND SESSION OF THE REGIONAL COMMISSION FOR FISHERIES.
LOVATELLI, A.

REPORT OF THE EXPERT CONSULTATION ON INTERNATIONAL FISH TRADE AND FOOD SECURITY.
MESKI, D.

RECENT DEVELOPMENT IN THE TUNA INDUSTRY.
MIYAKE, P M; GUILLOTREAU, P.

WESTERN CENTRL ATLANTIC FISHERY COMMISSION.
MEDLEY, D

FISHERY COMMITTEE FOR THE EASTERN CENTRAL ATLANTIC.
DOULMAN, D.

FISHERY INTENSIFICATION IN SMALL WATER BODIES A REVIEW FOR NORTH AMERICA.
DAVIES, D.W; MOEHI, F.J.

FISHERY MANAGEMENT MARINE PROTECTED AREAS AND FISHERIES.
BOTSFORD, L.W; CHRISTINE, P.

PRINCIPLES OF HYDRAULIC MANAGEMENT OF COASTAL LAGOONS FOR AQUACULTURE AND FISHERIES
MILLER, M J; PIETRAFESA, J.L

FISHERY MANAGEMENT
FAO

SETTING UP AND RUNNING A SMALL MEAT OR FISH PROCESSING ENTERPRISE.
FELLOWS, P;AXTELL, B.

ANTHROPOGENIC AND ENVIRONMENTAL IMPACTS ON THE ABUNDANCE AND DISTRIBUTION OF COMMERCIAL FISH STOCKS ON LAKE VICTORIA, EAST AFRICA.
MUNYAHO, T.A

AQUACULTURE DEVELOPMENT
ASIMWE, R.

AQUACULTURE DEVELOPMENT HEALTH MANAGEMENT FOR RESPONSIBLE MOVEMENT OF LIVE AQUATIC ANIMALS.
ARTHUR, J.R; BALDOCK, C.

UTILIZATION AND CONTROL OF WATER HYACINTH IN SUDAN.
OTTMAR, P; KOCH, W.

FISHERIES AND AQUACULTURE EMERGENCY RESPONSE GUIDANCE.
CATTERMOUL, B; BROWN, D.

REPORT OF THE FAO WARDA WORKSHOP ON INTEGRATED IRRIGATION AQUACULTURE.
HALWART, M; CONTI, A.

REPORT OF THE TWENTY NINTH SESSION OF THE COMMITTEE ON FISHERIES.
FAO

GENERAL FISHERIES OF COMMISSION FOR THE MEDITERRANEAN.
MORFORT, M C.

GENERAL FISHERIES COMMISSION FOR THE MEDITERRANEAN
MORFORT M.

GUIDE FOR IDENTIFYING, ASSESSING AND REPORTING ON SUBSIDIES IN THE FISHERIES SECTOR.
WESTLUND, L.

LITERATURE ON WATER HYACINTH
REDDY, K.R; SCHNEIDER, G

FAO FISHERY STASTICS 2005
FAO

REPORT OF THE SYMPOSIUM ON SELECTION, HYBRIDIZATION AND GENETIC ENGINEERING IN AQUACULTURE.
CHEVASSUS, B.

THE STATE OF WORLD FISHERIES AND AQUACULTURE 2012.
HASAN, M.R; BIZZARRI, G.

MANUAL ON THE PRODUCTION AND USE OF LIVE FOOD FOR AQUACULTURE.
SORGELOOS, P; LAVENS P.

FISHERY STASTISTICS CAPTURE PRODUCTION.
FISHERY STASTISTICS.

SHARK UTILIZATION, MARKETING AND TRADE.
VANNUCCINI, S.

CODE OF CONDUCT FOR RESPONSIBLE FISHERIES.
FAO

AQUACULTURE DEVELOPMENT IN CHINA.
HISHAMUNDA, N; SUBASINGHE, R.

GUIDELINES ON THE COLLECTION OF STRUCTURAL AQUACULTURE STASTISTICS
RANA, K.J.

REPORT OF THE TWENTY SIXTH SESSION OF THE COMMITTEEON FISHERIES
HURRY, G.

REPORT AND DOCUMENTATION OF THE EXPERT WORKSHOP ON MARINE PROTECTED AREAS AND FISHERIES MANAGEMENT.
FAO

GENERAL FISHERIES COMMISSION FOR THE MEDITERRANEAN 28
RHAFES, T

DIRECTORY OF FISHING TECHNOLOGY INSTITUTIONS AND SERVICES.
FAO

AN ANNOTATED AND ILLUSTRATED CATALOGUE OF LAMPREY SPECIES KNOWN TO DATE.
FAO FISHERIES OFFICERS.

NATIONAL REVIEW FOR AQUACULTURE DEVELOPMENT IN AFRICA (UG.)
BALARIN, J.D

VITUAL POPULATION ANALYSIS.
LASSEN, H; MEDLEY, P

A REVIEW OF OPERATIOPNAL INTERACTIONS BETWEEN PINNIPEDS AND FISHERIES.
WICKENS, A P.

DEFINITION AND CLASSIFICATION OF FISHING GEAR CATEGORIES.
NEDELEC, C.

CHRONICLE OF CUBAN MARINE FISHERIES.
BAISRE, J.A.

LOW COST FISH RETAILING EQUIPMENT AND FACILITIES IN LARGE URBAN AREAS OF SOUTH EAST ASIA.
PIZZALI, M A.F.

REPORT OF THE FIFTEENTH SESSION OF THE COMMITTEE FOR INLAND FISHERIES AND AQUACULTURE OF AFRICA.
FAO

REPORT OF THE GLOBAL CONFERENCE ON SMALL SCALE FISHERIES SECURING SUSTAINABLE SMALL SCALE FISHERIES; BRINGING TOGETHER RESPONSIBLE FISHERIES AND SOCIAL DEVELOPMENT.
FAO

REPORT OF THE TWELFTH SESSION OF THE SUB-COMMITTEE ON FISH TRADE.
BUENOS, A.

A STRATEGIC REASSESSMENT OF FISH FARMING POTENTIAL IN AFRICA
MANJARREZ

USE OF ALGAE AND AQUATIC MACROPHYTES AS FEED IN SMALL SCALE AQUACULTURE.
CHAKRABARTI, R.

THE POTENTIAL OF SPATIAL PLANNING TOOLS TO SUPPORT THE ECOSYSTEM APPROACH TO AQUACULTURE
MANJARREZ, A.J; SOTO, D.

THE STATE OF WORLD FISHERIES AND AQUACULTURE
HASSAN, M R; SAHA,J.

DIRECTORY OF AGRICULTURAL RESEARCH PROJECTS IN UGANDA.
NARO

IMPACT OF RISING FEED INGREDIENT PRICES ON AQUAFEEDS AND AQUACULTURE PRODUCTION.
RAN,A, J.K.

COMMITTEE ON FISHERIES
SISSENWINE, M.

WESTERN CENTRAL ATLANTIC FISHERY COMMISSION
FAO

CASE STUDIES ON THE ALLOCATION OF TRANSFERABLE QUOTA RIGHTS IN FISHERIES
SHOTTON, R

REGIONAL COMMISSION FOR FISHERIES
ICRIST

REPORT OF THE SEVEN SESSION OF THE SUB COMMITTEE ON AQUACULTURE.
FAO

REPORT AND PROCEEDINGS OF THE SIXTH FAO EXPERT CONSULTATION ON FISH TECHNOLOGY IN AFRICA.
MDDEME, Y.E.S.

REGIONAL REVIEW ON STATUS AND TRENDS IN AQUACULTURE DEVELOPMENT IN THE NEAR EAST AND NORTH AFRICA.
KROUMA, I.

CASE STUDIES OF MANAGEMENT OF ELASMOBRANCH FISHERIES.
SHOTON, R

MANAGING FISHING CAPACITY
GREBOVAL, D

GENETIC DIVERSITY OF MARINE FISHERIES RESOURCES.
SMITH, P.J

REPORT OF THE EXPERT CONSULTATION OF INTERACTIONS BETWEEN SEA TURTLES AND FISHERIES WITH IN AN ECOSYSTEM CONTEXT
FAO

INLAND FISHERIES OF EUROPE.
DILL, A W; EIFAC, M

AN UPDATED WORLD REVIEW OF INTERACTIONS BETWEEN MARINE MAMMALS AND FISHERIES.
NORTHRIDGE, P.S.

DRIFNET FISHERIES AND THEIR IMPACTS ON NON TARGET SPECIES; A WORLDWIDE REVIEW.
NORTHRIDGE, P.S.

INLAND FISHERIEZS OF EUROPE.
DILL,W.A

THE FISHERY RESOURCES OF PACIFIC ISLAND COUNTRIES.
BOUR, W.

SMALL SCALE FISHING WITH DRIFNETS.
KARLSEN, L; BJARNASON, A B.

MANUAL OF METHODS IN AQUATIC ENVIRONMENT RESEARCH
REISH, L.D

TERRITORIAL USE RIGHTS AND ECONOMIC EFFICIENCY ;THE CASE OF THE PHILIPPINE FISHING CONCESSIONS
SMITH, L.R; PANAYOTOU, T.

INTERACTIONS OF THE PACIFIC TUNA.
SHOMURA, S.R; LANGI, S.

FISHERIES CHARACTERISTICS OF THE SHARED LAKES OF THE EAST AFRICAN RIFT.
greboval, d; bellemans, m.

SHARING THE FISH 06
METZNER, R; ISOKWA, D.

FISH STOCK ASSESSMENT MANUAL.
CADIMA, L.E.

FAO FISHERY STASTISTICS 2000
FAO UN.

MARITIME SOCIETIES, FISHERIES LAW AND INSTITUTIONS IN THE WESTERN MEDITERRANEAN.
FERAL, F.

SMALL SCALE FISH FARMING FOR FOOD SECURITY AND INCOME GENERATION JUNE 1998
GOU

FISHERY AND AQUACULTURE STASTISTICS
NOMURA, I.

REPORT OF THE TWENTY THIRD SESSION OF THE COORDINATING WORKING PARTY ON FISHERY STATISTICS
FAO

PROSPECTIVE ANALYSIS OF AQUACULTURE DEVELOPMENT
HISHAMUNDA, N; POULAIN,

ANALYSIS OF AQUACULTURE DEVELOPMENT IN SOUTH EAST ASIA
HISHAMUNDA, N; BUENO, B P.

MICROFINANCE IN FISHERIES AND AQUACULTURE
TIETZE, U.

MEASURING AND ASSESSING CAPACITY IN FISHERIES.
PASCOE, S; KIRKLEY J.E

FISHERIES AND AQUACULTURE EMMERGENCY RESPONSE GUIDANCE.
CATTERMOUL, B; BROWN, D.

GENERAL FISHERIES COMMISSION FOR THE MIDIRRANEAN 38.
ABDELLAH, S.

GENERAL FISHERIES COMMISSION FOR THE MEDITERRANEAN.
FAO

DEEP SEA 2003 CONFERENCE ON THE GOVERNANCE AND MANAGEMENT OF DEEP SEA FISHERIES.
SHOTTON, R.

FAO FISHERY STATISTICS 2001
FAO

STATUS OF FISH STOCKS AND FISHERIES OF THIRTEEN MEDIUM SIZED AFRICAN RESERVOIRS.
KNAAP, D VM.

TOWARDS SAFE AND EFFECTIVE USE OF CHEMICALS IN COASTAL AQUACULTURE.
FAO

THE AFRICAN JOURNAL OF TROPICAL HYDROBIOLOGY AND FISHERIES.
NTIBA, M.J;

FISHING BOAT DESIGN 2 V- BOTTOM BOATS OF PLANKED PLYWOOD CONSTRUCTION.
GULBRANDSEN, Y.

OUT LOOK FOR FISH TO 2020
DELGADO, L; ROSEGRANT, W.M

REPORT OF THE SEVENTEENTH SESSION OF THE FISHERY COMMITTEE FOR THE EASTERN CENTRAL ATLANTIC.
TAPSOBA, M.

FISH TO THE RESCUE
NYANGABYAKI, P.

REPORT OF THE WORKSHOP ON DEEP SEA SPECIES IDENTIFICATION.
CLARK, M

PUBLIC HEALTH RISKS OF HISTAMINE AND OTHER BIOGENIC AMINES FROM FISH AND FISHERY PRODUCTS.
FAO

DISCARDS IN THE WORLDS MARINE FISHERIES
KELLEHER, K.

ECONOMIC PERFORMANCE AND FISHING EFFICIENCY OF MARINE CAPTURE FISHERIES.
TIETZE, U; LASCH, R.

FISHERIES IN IRRIGATION SYSTEMS OF ARID ASIA.
PETR, T.

RESPONSIBLE USE OF ANTIBIOTICS IN AQUACULTURE
SERRANO, H. P.

REPORT OF THE TECHNICAL CONSULTATION ON THE USE OF SUBSIDESIN THE FISHERIES BSECTOR.
NOMURA,I

HABITAT REHABILITATION FOR INLAND FISHERIES
PALLOCK, M; PESS, G.

MORTALITY OF FISH ESCAPING TRAWL GEARS.
SUURONEN, P

A SURVEY OF THE SUBSISTENCE AND ARTISANAL FISHERRIES IN RURAL AREAS OF VITI LEVU
SESEWA, S.J.M

FAO FISHERY STATISTICS COMMODITIES 2001
FAO

DEEP SEA 2003 CONFERENCE ON THE GOVERNANCE AND MANAGEMENT OF DEEP SEA FISHERIES.
SHOTTON, R

REPORT OF THE SEVENTEENTH SESSION OF THE FISHERY COMMITTEE FOR THE EASTERN AND CENTRAL ATALANTIC
FAO

THE STATE OF WORLD FISHERIES AND AQUACULTURE 2004.
NOMURA, I

THE AFRICAN JOURNAL OF TROPICAL HYDROBIOLOGY AND FISHERIES
NTIBA, J.M

COASTAL FISHERIES OF LATIN AMERICA AND THE CARIBBEAN.
SALAS, S; CHUNPAGDEE, R

POLICY STATEMENT
MAIF

FISH FARMING AS A BUSINESS
RUTAISIRE, J; BWANIKA, G

REVIEW OF THE STATE OF WORLD MARINE FISHERY RESOURCES
MARINE, R

UNDERSTANDING AQUACULTURE
ANTONI, E

REPORT OF THE THIRD SESSION OF THE SCIENTIFIC SUB COMMITTEE.
COPACE

FUTURE CLIMATE CHANGE AND REGIONAL FISHERIES.
SHARP, G.D

AGRICULTURE IN UGANDA VOLUME 5
TWINAMATSIKO, E

REPORT OF THE FAO WORKSHOP ON PORT STATE MEASURES TO COMBAT ILLEGAL UNREPORTED AND UNREGULATED FISHING FOR THE WEST AFRICAN SUBREGION.
SEMENDO. S H

REPORT OF THE SECOND GLOBAL FISHERIES ENFORCEMENT TRAINING WORKSHOP.
MACLEAN, A.

THE WATER HERALD
MUHAIRWE, W.M

GOVERNMENT POLICY ON INFLATION AND ITS IMPACT ON NWSC.
MIICHLEN, A

A B IO ECONOMIC MODEL OF SEQUENTIAL ARTISANAL AND INDUSTRIAL SHRIMP FISHERIES
MUTAGAMBA, M

APPLICATION OF NITROGEN FIXING SYSTEMS IN SOIL MANAGEMENT.
MUTIKANGA, H

FISH FAMING IN UGANDA.
CTA

CAUSES OF DETENTIONS AND REJECTIONS IN INTERNATIONAL FISH TRADE.
GANDINI, G; ABABOUCH, L

DAMS, FISH AND FISHERIES OPPORTUNITIES, CHALLENGES AND CONFLICT RESOLUTION.
MARMULLA, G

FISHERIES INFORMATION IN DEVELOPING COUNTRIES SUPPORT TO THE IMPLEMENTATION OF THE 1995 FAO CODE OF CONDUCT FOR RESPONSIBLE FISHERY .
WEBSTER,G.J

CAPTURE BASED AQUACULTURE
OTTOLENGHI, F; GIORDANO, C.

FISHERIES MANAGEMENT SUPPL 2
FAO

GENETIC RESOURCES OF COMMON CARP AT THE FISH CULTURE RESEARCH INSTITUTE, SZARVAS, HUNGARY
BAKOS, J; GORDA, S

TOWARDS IMPROVING GLOBAL INFORMATION ON AQUACULTURE.
FAO FISHERIES DEPARTMENT

PRIMARY AQUATIC ANIMAL HEALTH CARE IN RURAL,SMALL SCALE, AQUACULTURE DEVELOPMENT
ARTHUR, R.J; PHILLIPS, M.J

BULLETIN OF FISHERY STATISTICS
FAO

FISH CULTURE IN UGANDA
APOSTOLSKI

CHECKLIST OF THE PARASITES OF FISHES OF BANGLADESH
ARTHUR, R.J

PAPERS PRESENTED AT THE NORWAY FAO EXPERT CONSULTATION ON THE MANAGEMENT OF SHARED FISH STOCKS

FAO/ SPC REGIONAL EXPERT CONSULTATION ON SEA SAFETY IN SMALL FISHING VESSELS
FAO

COMMITTEE ON FISHERIES
FAO

TOWARDS IMPROVING GLOBAL INFORMATION ON AQUACULTURE
FAO

FISHERIES MANAGEMENT MARINE PROTECTED AREAS.
FAO

FAO FISHERY STASTISTICS VOL 90.
FAO UN

FAO FISHERIES REPORT
FAO

CAPTURE BASED AQUACULTURE.
FRANCESCA, O; SILVESTRI, C

MANAGEMENT OF WATER HYACINITH ON LAKE VICTORIA
CSIRO

REPORT OF THE FAO/FFA REGIONAL WORKSHOP TO PROMOTE THE FULL AND EFFECTIVE IMPLEMENTATION OF PORT STATE MEASURES TO COMBAT ILLEGAL, UNREPORTED AND UNREGULATED FISHING.
FAO

CEPHALOPODS OF THE WORLD VOLUME 4
JEREB, P; ROPER, C.F.E

THE STATE OF WORLD FISHERIES AND AQUACULTURE 2002.
FISHERIES DEPARTMENT

WORLD AQUACULTURE 2010
MOHAMMED, R.S

FAO FISHERY STATISTICS 2005
FAO

AGRICULTURAL REVIEW
FAO

CLIMATE CHANGE IMPLICATIONS FOR FISHERIES OF THE BENGUELA CURRENT REGION
YOUNG, C.D; HJORT, A.

PREDICTIVE FISH YIELD MODELS FOR LAKES AND RESERVOIRS OF THE PHILIPPINES, SRI LANKA AND THAILAND.
MOREAU, J; SILVA, S.S

FIFTH WORLD FISH INSPECTION AND QUALITY CONTROL CONGRESS
RYDER, J; ABABOUCH, L

REPORT OF THE EXPERT CONSULTATION ON DATA FORMATS AND PROCEDURES FOR MONITORING, CONTROL AND SURVEILLANCE
SMITH, A; REYNOLD, E.J

AN INTRODUCTION TO MONITORING, CONTROLAND SURVEILLANCE SYSTEMS FOR CAPTURE FISHERIES.
FLEWWELLING, P

OVERVIEW OF WORLD ELASMOBRANCH FISHERIES
BONFIL, R

CHRONICLES OF MARINE FISHERY LANDINDINGS (1950-1994)
GRAINGER, R.J.R

REPORT OF THE SYMPOSIUM ON HABITAT MODIFICATION AND FRESH WATER FISHERIES
DENMARK, A; DANEMARK, A

REPORT OF THE SECOND AND HOC MEETING ON MANAGEMENT OF DEEP WATER FISHERIES RESOURCES OF THE SOUTHERN INDIAN OCEAN
FAO

REPORT OF THE EIFAC WORKING PARTY ON PREVENTION AND CONTROL OF BIRD PREDATION IN AQUACULTURE AND FISHERIES OPERATIONS
FAO

REPORT OF THE GFCM WORKSHOP ON ILLEGAL, UNREPORTED AND UNREGULATED FISHING IN THE MEDITERRANEAN.
FAO

FISHING BOAT CONSTRUCTION; 2 BUILDING A FIBREGLASS FISHING BOAT.
COACKLEY, N; CONWY, G

MANUAL ON SAMPLE BASED DATA COLLECTION FOR FISHERIES ASSESSMENT.
SPARRE, J.P

PUTTING INTO PRACTICE THE ECOSYSTEM APPROACH TO FISHERIES.
ATTWOOD, C

INTRODUCTION TO TROPICAL FISH STOCK ASSESSMENT PART 2 EXERCISES
SPARRE, P; VENEMA, C.S

THE ECONOMICS OF OCEAN RANCHING.
ARNASON, R

MANAGING FISHING CAPACITY
CUNNINGHAM, S

REPORT OF THE EIFAC WORKING PARTY ON PREVENTION AND CONTROL OF BIRD PREDATION IN AQUACULTURE AND FISHERIES OPERATIOINS
FAO DEPARTMENT

APPLICATION OF NITROGEN FIXING SYSTEMS IN SOIL MANAGEMENT
HAMDI, Y.A

FISHERIES AND RESEARCH FOR TUNAS AND TUNA LIKE SPECIES IN THE WESTERN CENTRAL ATLANTIC.
MAHON, R

MANAGEMENT CONCEPT FOR SMALL SCALE FISHERIES
THEODORE, P

OPTIMUM FISHING EFFORT AND ECONOMIC RENT; A CASE STUDY OF CYPRUS.
HANNESSON, R

THE USE OF ICE ON SMALL FISHING VESSELS
SHAWYER, M; PIZZALI, M.F

BYCATCH IN SMALL SCALE TUNA FISHERIES
GILLET, R

REGISTER OF INTERNATIONAL TRANSFERS OF INLAND FISH SPECIES
WELCOMME, R.L

MAPPING COASTAL AQUACULTURE AND FISHERIES STARUCTURES BY SATELLITE IMAGING RADAR.
TRAVAGLIA, C

INTERNATIONAL DIRECTORY OF FISH TECHNOLOGY INSTITUTES
FISHERIES DEPARTMENT

REPORT OF THE THIRD MEETING OF REGIONAL FISHERY BODIES.
FAO

REPORT AND PAPERS PRESENTED AT THE THIRD WORKSHOP ON FISH TECHNOLOGY, UTILIZATION AND QUALITY ASSURANCE IN AFRICA.
VICTORIA, M

REPORT OF THE TWENTY NINTH SESSION OF THE COMMITTEE ON FISHERIES.
FAO

REPORT OF THE FAO REGIONAL WORKSHOP ON THE ELABORATION OF NATIONAL PLANS OF ACTION TO PREVENT, DETER AND ELIMINATE ILLEGAL, UNREPORTED AND UNREGULATED FISHING.
FAO

REGISTER OF INTERNATIONAL TRANSFERS OF INLAND FISH SPECIES.
FAO

DISTRIBUTION AND IMPORTANT BIOLOGICAL FEATURES OF COASTAL FISH RESOURCES IN SOUTHEAST ASIA.
CHULLASORN, S; MARTOSUBROTO, P

BULLETIN OF FISHERY STATISTICS
FAO

FISH CULTURE IN UNDRAINABLE PONDS.
KUMAR, D

MANUAL OF METHODS IN AQUATIC ENVIRONMENT RESEARCH
GRAY, S.J; MCLNTYRE, D.A

REPORT OF THE AD HOC TECHNICAL CONSULTATION ON THE DEVELOPMENT AND MANAGEMENT OF THE FISHERIES OF LAKE KARIBA
FAO

ADJUSTMENTS TO CHANGES IN FISHERIES LAW AND ECONOMICS
CLEVERLAND, C.B

REVIEW OF THE STATE OF WATER POLLUTION AFFECTING INLAND FISHERIES IN SOUTHEAST ASIA.
ALABASTER, S.J

IMPACTS OF PREIMPOUNDMENT CLEARING ON RESERVOIR ECOLOGY AND FISHERIES IN THE UNITED STATES AND CANADA.
PLOSKEY, R.G

MARINE FISHERY RESOURCES OF THE ANTILLES.
JULIO, B

FISHERY STATISTICS AQUACULTURE PRODUCTION 2000.
FAO

ADJUSTMENTS TO CHANGES IN FISHERIES LAW AND ECONOMICS.
CLEVELAND, C.B

REPORT OF THE AD HOC CONSULTATION ON THE ROLE OF REGIONAL FISHERIES AGENCIES.
FAO

WESTERN CENTRAL ATLANTIC FISHERY COMMISSION.
GEORGE, S

FISHERIES MANAGEMENT SUPPL 1
FAO

AQUATIC TELEMETRY.
SPEDICATO, T.M; MARMULLA, G

CAGE AND PEN FISHING FARMING
BEVERIDGE, C.M M

DEMOGRAPHIC CHANGE IN COASTAL FISHING COMMUNITIES AND ITS IMPLICATIONS FOR THE COASTAL ENVIRONMENT.
TIETZE, U; GROENEWOLD, G

THE OWNERSHIP AND MANAGEMENT OF FISHERY VESSELS
EDDIE,C.G

AN INTRODUCTION TO MONITORING, CONTROL AND SURVEILLANCE SYSTEMS FOR CAPTURE FISHERIES.
FLEWWELLING, P

THE POTENTIAL YIELD OF FISH STOCKS.
BEDDINGTON, J.R

FISHERIES MANAGEMENT IN SOUTH EAST LAKE MALAW, THE UPPER SHIRE RIVER AND LAKE MALOMBE.
FAO/GOM

THE FISHERY RESOURCES OF PACIFIC ISLAND COUNTRIES.
CONAND, C

INTRODUCTION TO TROPICAL FISH STOCK ASSESSMENT PART 2
VENEMA, C.S; SPARRE, P

INTERNATIONAL DIRECTORY OF FISH TECHNOLOGY INSTITUTES.
FAO

INLAND FISHERIES IN MULTIPLE USE OF RESOURCES.
PETR, T

GENERAL FISHERIES COUNCIL FOR THE MEDITERRANEAN
FAO

OCCUPATIONAL AND GEOGRAPHICAL MOBILITY IN AN OUT OF THAI FISHERIES.
PANAYOTOU, T; PANAYOTOU, D

MANUAL OF METHODS IN AQUATIC ENVIRONMENET RESEARCH
STIRN, J

NORWAY FAO EXPERT CONSULTATION ON THE MANAGEMENT OF SHARED FISH STOCKS
Fao

INTRODUCING FISHERIES SUBSIDIES
SCHRANK, W

FISH TO THE RESCUE
NARO

INDO PACIFIC FISHERY COMMISSION
Fao

PRINCIPLES OF FISH PRODUCTION.
FAO

DISCARDS IN THE WORLD MARINE FISHERIES
FAO

FUTURE CLIMATE CHANGE AND REGIONAL FISHERIES; A COLLABORATIVE SYSTEM
WILLIAM, E S

HABITAT REHABILITATION FOR INLAND FISHERIES
FAO

COMPUTER PROGRAMS FOR FISH STOCK ASSESMENT APPLICATIONS FOR THE HP 41 CV CALCULATOR
SPARE, P

REPORT OF THE TENTH SESSION OF THE SUBCOMMITTEE FOR LAKE TANGANYIKA.
FAO

SMALL SCALE FISH LANDING AND MARKETING FACILITIES
PIZZALI, M

INTRODUCING FISHERIES SUBSIDIES
SCHRANK, W.E

PRODUCTION ENHANCEMENT IN STILL WATER POND CULTURE
COCHE, G.A

SOME CONSIDERATION FOR THE MANAGEMENT OF COASTAL LAGOON AND ESTUARINE FISHERIES
KAPETSKY, M.J

INDO PACIFIC FISHERY COMMISSION
FAO

PAPERS PRESENTED AT TEH NORWAY FAO EXPERT CONSULTATION ON THE MANAGEMENT OF SHARED FISH STOCK.
FAO

TECHNO ECONOMIC PERFORMANCE OF MARINE CAPTURE FISHERIES
PRADO, J; TIETZE, U

FREEZING AND REFRIGERATED STORAGE IN FISHERIES
NICHOLSON, F.J; JOHNSTON, W.A

INTRODUCTION TO FISHERIES MANAGEMENT ADVANTAGES, DIFFICULTIES AND MECHANISMS.
TROADEC, J.P

MARINE RESOURCE MAPING; AN INTRODUCTORY MANUAL.
BUTLER, M.J.A; LEBLAC. C

FISHERY MANAGEMENT IN JAPAN
ASADA,

STOCKING AND INTRODUCTION OF FISH IN LAKES AND RESERVOIRS IN THE ASEAN COUNTRIES.
BALAYUT, A.E

WATER QUALITY CRITERIA FOR EUROPEAN FRESHWATER FISH
EIFAC

STATUS OF INTERACTIONS OF PACIFIC TUNA FISHERIES IN 1995
SHOMURA, S.R; MAJKOWSKI

COMPUTER PROGRAMS FOR FISH STOCK ASSESSMENT APPLICATIONS FOR THE HP 41 CV CALCULATOR
VAKILY, J.M; D, PAULY

ICE IN FISHERIES
JOHNSTON, W.A; GRAHAM, J.

CASE STUDIES OF MANAGEMENT OF ELESMOBRANCH FISHERIES
FAO

ELEVENTH SESSION OF THE ADVISORY COMMITTEE OF EXPERTS ON MARINE RESOURCES RESEARCH
HENDERSON, H

A STRATEGIC ASSESSMENT OF WARM WATER FISH FARMING POTENTIAL IN AFRICA.
KAPETSKY, J.M

DEFINITION AND CLASSIFICATION OF FISHING GEAR CATEGORIES.
PRADO, J; NEDELEC, C

KRILL FISHERIES OF THE WORLD
NICOL, S; ENDO, Y

SECOND SESSION OF THE WORKING PARTY ON FISHERIES TECHNOLOGY
FAO

REPORT OF THE ELEVENTH SESSION OF THE ADVISORY COMMITTEE OF EXPERTS ON MARINE RESOURCES RESEARCH
FAO/ACMRR

REPORT OF THE SECOND SESSION OF THE SUB-COMMITTEE ON FISH TRADE.
FAO

REPORT OF THE NINTH SESSION OF THE INDIAN OCEAN FISHERY COMMISSION.
FAO

REGIONAL REVIEWS AND NATIONAL MANAGEMENT REPORTS FOURTH WORKSHOP ON THE ASSESSMENT AND MANAGEMENT OF SHRIMP AND GROUNDFISH FISHERIES ON THE BRAZIL GUIANAS SHELF.
CFRAMP

REPORT OF THE EIGTH SESSION OF THE WORKING PARTY ON RESOURCES EVALUATION.
FAO

INDIVIDUAL QUOTA MANAGEMENT IN FISHERIES
MORGAN, R.G

MANUAL OF PROCEDURES FOR THE IMPLEMENTATION OF THE ASIA REGIONAL TECHNICAL GUIDELINES ON HEALTH MANAGEMENT FOR THE RESPONSIBLE MOVEMENT OF LIVE AQUATIC ANIMALS.
FAO

FUEL AND FINANCIAL SAVINGS FOR OPERATORS OF SMALL FISHING VESSELS.
WILSON, J.D,K

CHECKLIST OF THE PARASITES OF FISHES OF THE PHILIPPINES
ARTHUR, J.R
.jpg)
WESTERN CENTRAL PACIFIC
FAO

AN INTRODUCTION TO THE ECONOMIC OF FISHERIES MANAGEMENT.
FAO

WESTERN CENTRAL ATLANTIC FISHERY COMMISSION.
FAO

REPORT OF THE EIGHTH SESSION OF THE WORKING PARTY ON RESOURCES EVALUATION.
FAO

REPORT OF THE SECOND SESSION OF THE SUB-COMMITTEE ON FISH TRADE.
FAO

AGRICULTURAL REVIEW PRINCIPLES OF FISH PRODUCTION
FAO

REPORT OF THE SECOND SESSION OF THE WORKING PARTY ON FISHERIES TECHNOLOGY.
FAO

MARINE FISHERY RESOURCES OF THE ANTILLES
LESSER, A

AN INTRODUCTION TO MONITORING, CONTROL AND SURVEILLANCE SYSTEMS FOR CAPTURE FISHERIES.
FLEWWELING, P

STOCKING AND INTRODUCTION OF FISH IN LAKES AND RESERVOIRS IN THE ASEAN COUNTRIES.
BALAYUT, E.A

OCCUPATIONAL AND GEOGRAPHICAL MOBILITY IN AND OUT OF THAI FISHERIES.
PANAYOTOU, T

PUBLIC HEALTH RISKS OF HISTAMINE AND OTHER BIOGENIC AMINES FROM FISH AND FISHERY PRODUCTS
TURSI,A;VASSEUR,B

FISHERY AND AQUACULTURE STATISTICS 2007
FAO

MANUAL OF FISHERIES SAMPLING SURVEYS; METHODOLOGIESFOR ESTIMATION OF SOCIO-ECONOMIC INDICATORS IN THE MEDITERRANEAN SEA.
SABATELLA, E; FRANQUESA, R

ENHANCING OR RESTORING THE PRODUCTIVITY OFNATURAL POPULATIONS OF SHELLFISH AND OTHER MARINE INVERTEBRATE RESOURCES
CADDY,J

FISHERIES AND AQUACULTURE EMERGENCY RESPONSE GUIDANCE.
CATTERMOUL, B; DEVID, B

IMPLEMENTATION OF THE INTERNATIONAL PLAN OF ACTION TO PREVENT, DETER AND ELIMINATE ILLEGAL, UNREPORTED AND UNREGULATED FISHING; RELATIONSHIP TO, AND POTENTIAL EFFECTS ON, FISHERIES MANAGEMENT IN THE MEDITERRANEAN.
SWAN, J

SAFETY PRACICES RELATED TO SMALL FISHING VESSEL STABILITY.
GUDMUNDSSON, A

REPORT OF THE FIRST SESSION OF THE SCIENTIFIC SUB COMMITTEE ABUJA NIGERIA.
FAO

REPORT OF THE THIRD SESSION OF THE SCIENTIFIC COMMITTEE.
DOMINGOS, G

ESTIMATION OF TUNA FISHING CAPACITY FROM STOCK ASSESSMENT RELATED INFORMATION.
BAYLIFF, W
.jpg)
THE STATE OF WORLD FISHERIES AND AQUACULTURE.
NOMURA, I
FISHERIES PAPERS

DEVELOPING NEW APPROACHES TO GLOBAL STOCK STATUS ASSESSMENT AND FISHERY PRODUCTION POTENTIAL OF THE SEAS.
LONGO, C

ENVIRONMENTAL MANAGEMENT OF FISH RESOURCES IN THE BLACK SEA AND THEIR RATIONAL EXPLOITATION.
DASKALOV, K; MIKHAILOV, K

REVIEW OF THE STATE OF WORLD MARINE FISHERY RESOURCES.
MAJKOWSKI, J; SHOTTON, R

REPORT OF THE AD HOC EIFAC/E C WORKING PARTY ON MARKET PERSPECTIVES FOR EUROPEAN FRESHWATER AQUACULTURE.
VAMVAKAS, C

SYNOPSIS OF BIOLOGICAL DATA ON THE CHUB MACKEREL.
HERNANDEZ, J.J

ABANDONED, LOST OR OTHERWISE DISCARDED FISHING GEAR.
CAPPELL, R

AN INDEXED LIST OF FAO PUBLICATIONS RELATED TO AQUACULTURE, 1960-2001.
COCHE, A.G

FISHING BOAT CONSTRUCTION.
ANMARKRUD, T

WHAT IS THE CODE OF CONDUCT FOR RESPONSIBLE FISHERIES.
FAO

IMPLEMENTATION OF THE INTERNATIONAL PLAN OF ACTION TO PREVENT, DETER AND ELIMINATE ILLEGAL, UNREPORTED AND UNREGULATED FISHING.
AUSTIN, J

STRATEGY FOR IMPROVING INFORMATION ON STATUS AND TRENDS OF CAPTURE FISHERIES.
FAO

FISHERY STATISTICS.
FAO

HOW TO MAKE AND SET FISH AGGREGATING DEVICES.
YAMI, B; BJARNASON, B

CONSTRUCTION AND MAINTENANCE OF ARTISANAL FISHING HARBOURS AND VILLAGE LANDINGS.
SCIORTINO, J.A; BARCALI, M

REPORT OF THE SIXTH SESSION OF THE STANDING COMMITTEE ON RESOURCES RESEARCH AND DEVELOPMENT.
MARTOSUBROTO, P

INTEGRATION OF FISHERIES INTO COASTAL AREA MANAGEMENT.
INSULL, D

INTERNATIONAL PLAN OF ACTION TO PREVENT, DETER AND ELIMINATE ILLEGAL, UNREPORTED AND UNREGULATED FISHING.
JONES, A

MARINE MAMMALS OF THE WORLD.
JEFFERSON, T.A; LEATHERWOOD, S.

THE LIVING MARINE RESOURCES OF SOMALIA.
SOMMER, C; WOLFGAND, S

REPORT OF THE CONFERENCE FOR THE ADOPTION OF A DRAFT AGREEMENT FOR THE ESTABLISHMENT OF THE INDIAN OCEAN TUNA COMMISSION.
FAO

GENERAL FISHERIES COMMISSION FOR THE MEDITERRANEAN.
FAO

REPORT OF THE WORKSHOP ON FISHERY STATISTICS FOR ESTONIA, LATVIA AND LITHUANIA.
FAO

WORLDWIDE REVIEW OF BOTTOM FISHERIES IN THE HIGH SEAS.
GREBOVAL, D

INFORMATION AND KNOWLEDGE SHARING.
EMMANUELA, D

IMPLEMENTATION OF THE INTERNATIONAL PLAN OF ACTION TO PREVENT, DETER AND ELIMINATE ILLEGAL, UNREPORTED AND UNREGULATED FISHING.
JONES, A

INLAND FISHERY ENHANCEMENT.
TOMI, P

GENERAL FISHERIES COMMISSION FOR THE MEDITERRANEAN.
FAO

TRENDS IN CATCHES AND LANDINGS INDIAN OCEAN FISHERIES.
STAMATOPOULOS, C

THE UNU FISHERIES TRAINING PROGRAMME AND THE SUSTAINABLE FISHERIES SYMPOSIUM IN REYKJAVIK.
KONRAD, T

REPORT OF THE SECOND MEETING OF REGIONAL FISHERY BODY SECRETARIATS NETWORK.
NOMURA, I

REPORT OF THE TENTH SESSION OF THE WESTERN CENTRAL ATLANTIC FISHERY COMMISSION AND OF THE SEVENTH SESSION OF THE COMMITTEE FOR THE DEVELOPMENT AND MANAGEMENT OF FISHERIES IN THE LESSER ANTILLES.
KARNICKI, Z

REPORT OF THE SECOND SESSION OF THE REGIONAL COMMISSION FOR FISHERIES.
LOVATELLI, A

THE STATE OF WORLD FISHERIES AND AQUACULTURE
KAMBOU, S

REPORT OF THE SIXTH SESSION OF THE SUB COMMITTEE FOR THE DEVELOPMENT AND MANAGEMENT OF THE FISHERIES OF LAKE TANGANYIKA.
FAO

REPORT OF THE NINTH SESSION OF THE WORKING PARTY ON FISH TECHNOLOGY AND MARKETING.
PILLAI, K.B

LONGLINE FISHING
GEORGE, J.P

HANDLING AND SQUID JIGGING.
CARLES, M; BJARNSON, B

TRENDS IN CATCHES AND LANDINGS PACIFIC FISHERIES.
STAMATOPOULOS, C

REPORT OF THE CONSULTATION ON THE ESTABLISHMENT OF A FISHERIES CREDIT NETWORK FOR ASIA AND THE PACIFIC.
KILIAN, D
.jpg)
THE STATE OF WORLD FISHERIES AND AQUACULTURE.
NOMURA, I

REPORT OF THE USE OF LENGTH FREQUENCY DATA FOR THE ASSESSMENT OF FISHERIES RESOURCES OF THE CARIBBEAN ISLANDS.
BERTRAND, G

REPORT OF THE FIFTEENTH SESSION OF THE FISHERY COMMITTEE FOR THE EASTERN CENTRAL ATLANTIC.
KARNICKI, F

INTEGRATED MARICULTURE A GLOBAL REVIEW.
SOTP, D

CHRONICLE OF CUBAN MARINE FISHERIES.
BAISRE, J.A

ABANDONED,LOST OR OTHERWISE DISCARDED FISHING GEAR.
MACFADYEN, G; CAPPELL, R

REPORT OF THE NINTH SESSION OF THE WORKING PARTY ON FISH TECHNOLOGY AN D MARKETING.
GOPAKUMAR, K

THE FISH RESOURCES OF THE NORTHWEST PACIFIC.
CHIKUNI, S

A GLOBAL ASSESSMENT OF FISHERIES BYCATCH AND DISCARDS.
ALVERSON, L; FREEBERG, M

REPORT OF THE SESSION OF THE COORDINATING WORKING PARTY ON ATLANTIC FISHERY STATISTICS.
CORNUS, H.P

REPORT OF THE SIXTH SESSION OF THE SUB COMMITTEE FOR THE DEVELOPMENT AND MANAGEMENT OF THE FISHERIES OF LAKE VICTORIA.
ODERO, N; SICHONE, C

PAPERS CONTRIBUTED TO THE WORKSHOP ON THE WORKSHOP ON STRATEGIES FOR THE MANAGEMENT OF FISHERIES AND AQUACULTURE IN MANGROVE ECOSYSTEM.
MEPHAM, R.H

SMALL AND MEDIUM SAWMILLS IN DEVELOPING COUNTRIES.
GITTINGER, J.P; WILLISTON, M

A STRATEGIC ASSESSMENT OF THE POTENTIAL FOR FRESHWATER FISH FARMING IN LATIN AMERICA.NG IN LATIN AMERICA.
KAPETSKY, J

REPORT OF THE TECHNICAL CONSULTATION ON THE SUITABILITY OF THE CITES CRITERIA FOR LISTING COMMERCIALLY EXPLOITED AQUATIC SPECIES.
FAO

REPORT OF THE NINTH SESSION OF THE SUBCOMMITTEE FOR LAKE TANGANYIKA.
MAEMBE, T.W; NOMURA, I

REPORT OF THE FAO EXPERT CONSULTATION ON THE USE OF IRRIGATION SYSTEMS FOR SUSTAINABLE FISH PRODUCTION IN ARID COUNTRIES OF ASIA.
ACKURA, F

REPORT OF THE TWENTY FIRST SESSION OF THE EUROPEAN INLAND FISHERIES ADVISORY COMMISSION.
FAO

REPORT OF THE EIGHTH SESSION OF THE INDO PACIFIC FISHERY COMMISSION WORKING PARTY ON FISH TECHNOLOGY AND MARKETING.
DAVID, J; REILLY, P.J

REPORT OF THE WORKSHOP ON THE MANAGEMENT OF SHARED SMALL PELAGIC FISHERY RESOURCES IN NORTHWEST AFRICA.
KUYATEH, J

REPORT OF THE ELEVENTH SESSION OF THE COMMITTEE FOR INLAND FISHERIES OF AFRICA.
KARNICKI, Z.S

REPORT OF THE SEVENTEENTH SESSION OF THE EUROPEAN INLAND FISHERIES ADVISORY COMMISSION.
SAROGLIA, M

REPORT OF THE FIFTEENTH SESSION OF THE FISHERY COMMITTEE FOR THE EASTERN CENTRAL ATLANTIC.
FAO

REPORT OF THE FIRST SESSION OF THE SCIENTIFIC SUB COMMITTEE.
FAO

A STUDY OF THE OPTIONS FOR UTILIZATION OF BYCATCH AND DISCARDS FROM MARINE CAPTURE FISHERIES.
CLUCAS, I

REPORT OF THE NINETEENTH SESSION OF THE COMMITTEE ON FISHERIES.
MORENO, A

PAPERS CONTRIBUTED TO THE REGIONAL SYMPOSIUM ON SUSTAINABLE DEVELOPMENT OF INLAND FISHERIES UNDER ENVIRONMENTAL CONSTRAINTS.
PETR, T; MORRIS, M

REPORT OF THE JOINT SESSION OF THE INDIAN OCEAN FISHERY COMMISSION.
FASO

FISHERY COMMITTEE FOR THE EASTERN CENTRAL ATLANTIC.
FAO
.jpg)
PAPERS PRESENTED AT THE EXPERT CONSULTATION ON THE REGULATION OF FISHING EFFORT {FISHING MORTALITY).
HOYDAL, K; HOLDEN, M.J

REPORT OF THE EIGHTH SESSION OF THE WESTERN CENTRAL ATLANTIC FISHERY COMMISSION.
DEFENDI, A.M; ARCAYA, A.T

REPORT OF THE SECOND SESSION OF THE COMMITTEE FOR THE DEVELOPMENT AND MANAGEMENT OF FISHERIES IN THE BAY OF BENGAL.
PATHAK, P

REPORT OF THE SYMPOSIUM ON SOCIAL, ECONOMIC AND MANAGEMENT ASPECTS OF RECREATIONAL FISHERIES.
BNINSKA, M

GEOGRAPHICAL INFORMATION SYSTEMS AND REMOTE SENSING IN INLAND FISHERIES AND AQUACULTURE.
MEADEN, G; KAPETSKY, M

VETERINARY EDUCATION.
CAMPBELL, S.F

PAPERS PRESENTED AT THE SEVENTH SESSION OF THE STANDING COMMITTEE ON RESOURCES RESEARCH AND DEVELOPMENT.
DANN, T; SHZEE, T

REPORT OF THE FIFTH SESSION OF THE INDIAN OCEAN FISHERY COMMISSION COMMITTEE FOR THE DEVELOPMENT AND MANAGEMENT OF THE FISHERY RESOURCES OF THE GULFS.
MUSTAPHA, N

WESTERN CENTRAL ATLANTIC FISHERY COMMISSION.
FAO

REPORT OF THE THIRD SESSION OF THE WORKING PARTY ON AQUACULTURE.
FAO

REPORT OF THE FIFTH SESSION OF THE SUB COMMITTEE FOR LAKE TANGANYIKA.
FAO

REPORT OF THE EXPERT CONSULTATION ON LARGE SCALE PELAGIC DRIFTNET FISHING.
WARD, T; NISHIKAWA, Y

REPORT OF THE SECOND WORKSHOP ON THE BIOLOGICAL AND ECONOMICAL MODELLING OF THE SHRIMP RESOURCES ON THE GUYANA BRAZIL SHELF.
DINTHEER, C

REPORT OF THE SIXTH SESSION OF THE COMMITTEE FOR THE DEVELOPMENT AND MANAGEMENT OF FISHERIES IN THE BAY OF BANGAL.
FAO

MANUAL FOR THE PRODUCTION OF MAREK DISEASES, GUMBORO DISEASE AND INACTIVATED NEWCASTLE DISEASE VACCINE.
MISRA, R.P

NATIONAL REPORTS AND SELECTED PAPERS PRESENTED AT THE FIFTH SESSION OF THE WORKING PARTY ON ASSESSMENT OF MARINE FISHERY RESOURCES.
FAO

REPORT OF THE EXPERT CONSULTATION ON THE USE OF MICROCOMPUTERS FOR PROCESSING STATISTICAL AND BIOLOGICAL DATA.
TRINIDAD, Y

EIFAC EXPERIMENTS ON PELAGIC FISH STOCK ASSESSMENT BY ACOUSTIC METHODS IN LAKE CONSTANCE.
DAHM, E; LINDEM, E

REPORT OF THE TENTH SESSION COORDINATING WORKING PARTY ON ATLANTIC FISHERY STATISTICS.
GERTENBACH, L.P; SULLIVAN, K

SUMMARY REPORT AND SELECTED PAPERS PRESENTED AT THE IPFC WORKSHOP ON INLAND FISHERIES FOR PLANNING.
PETR, T

REPORT OF THE FIRST SESSION OF THE COMMITTEE FOR THE DEVELOPMENT AND MANAGEMENT OF FISHERIES IN THE BAY OF BENGAL.
ANANT, S; SELVIC, T

REPORT OF THE CONSULTATION ON UTILIZATION AND CONSERVATION OF AQUATIC GENETIC RESOURCES.
GRAHAM, G

REPORT OF THE FAO/ JAPAN EXPERT CONSULTATION ON THE DEVELOPMENT OF COMMUNITY BASED COASTAL FISHERY MANAGEMENT SYSTEMS FOR ASIA AND THE PACIFIC.
CHRISTY, F; TOSHIHIKO, T

REPORT OF THE SEVENTH SESSION OF THE COMMITTEE FOR THE DEVELOPMENT AND MANAGEMENT OF FISHERIES IN THE BAY OF BENGAL.
PIYASENA, G; GUNASEEKI, E

REPORT OF THE FOURTH SESSION OF THE COMMITTEE FOR DEVELOPMENT AND MANAGEMENT OF FISHERIES IN THE BAY OF BENGAL.
MEUMOON, A

REPORT OF THE TECHNICAL CONSULTATION ON OPEN SEA SHELLFISH CULTURE IN ASSOCIATION WITH ARTIFICIAL REEFS.
DUVAL, C

REPORT OF THE THIRD SESSION OF THE COMMITTEE FOR THE DEVELOPMENT AND MANAGEMENT OF FISHERIES IN THE LESSER ANTILLES.
LINDQUIST, A

REPORT OF THE FIFTEENTH SESSION OF THE EUROPEAN INLAND FISHERIES ADVISORY COMMISSION.
SAUMA, D

REPORT OF THE FOURTH SESSION OF THE COMMITTEE FOR INLAND FISHERIES OF AFRICA.
BWANALI, E.C

REPORT OF THE TECHNICAL CONSULTATION ON THE SUITABILITY OF THE CITES CRITERIA FOR LISTING COMMERCIALLY EXPLOITED AQUATIC SPECIES.
NOMURA, I; EGGINK, H.J

REPORT OF THE WORKSHOP ON PARTICIPATORY APPROACHES IN AQUACULTURE.
MARTINEZ, M

REPORT OF THE THIRD SESSION OF THE SCIENTIFIC ADVISORY COMMITTEE.
CGPM

REPORT OF THE SECOND AD HOC TECHNICAL MEETING ON THE FUTURE OF THE SOUTHWEST INDIAN OCEAN COMMITTEE.
FAO

PROCEEDINGS OF THE FAO EXPERT CONSULTATION ON THE GENETIC ASPECTS OF TRYPANOTOLERANCE.
DIETEREN, M; TRAIL.J.C

REPORT OF THE TECHNICAL CONSULTATION ON ILLEGAL, UNREPORTED AND UNREGULATED FISHING.
NOMURA, I

REPORT OF THE NINETEENTH SESSION OF THE COMMITTEE ON FISHERIES.
MORENO, A

A STUDY OF THE OPTIONS FOR UTILIZATION OF BYCATCH AND DISCARDS FROM MARINE FISHERIES.
CLUCAS, I

REPORT OF THE WORKSHOP TO PLAN THE 1999 R/V DR FRIDTJOF NANSEN SURVEYS IN THE NORTHERN CECAF AREA AND THE STANDARDIZATION OF ACOUSTIC SURVEYS IN THE REGION.
NANSEN, F

REPORT OF THE FIFTH SESSION OF THE COMMITTEE FOR THE DEVELOPMENT AND MANAGEMENT OF FISHERIES IN THE LESSER ANTILES.
CADDY, J; SYLVESTER, A

REPORT OF THE FIRST SESSION OF THE SCIENTIFIC SUB COMMITTEE.
OBAKIN, A

REPORT OF THE EIGHT SESSION OF THE GFCM WORKING PARTY ON RESOURCE APPRAISAL AND FISHERY STATISTICS.
BAINO, R; COURONNE, N

REPORT OF THE SEVENTH SESSION OF THE WORKING PARTY ON RESOURCES EVALUATION.
FERGUSSON, K; LOPEZ, J

REPORT OF THE FIFTEENTH SESSION OF THE FISHERY COMMITTEE FOR THE EASTERN CENTRAL ATLANTIC.
MOHAMED, M;

REPORT OF THE EXPERT CONSULTATION ON THE CONDITIONS OF ACCESS TO THE FISH RESOURCES OF THE EXCLUSIVE ECONOMIC ZONES.
SAVINI, M

DIRECTORY OF FISHERIES AND AQUACULTURE INFORMATION RESOURCES IN AFRICA.
MWOBOBIA, J

REPORT OF THE TWENTY SECOND SESSION OF THE COMMITTEE ON FISHERIES.
WILLIAM, M

REPORT OF THE TENTH SESSION OF THE COMMITTEE ON FISHERIES MANAGEMENT.
KATO, Y

REPORT OF THE SECOND SESSION OF THE COMMITTEE ON AQUACULTURE.
CATAUDELLA, S

REPORT OF THE WORKSHOP ON POPULATION CHARACTERISTICS AND CHANGE IN COASTAL FISHING COMMUNITIES.
CHACHAGE, C.S; NAHO, A.M

REPORT OF THE EXPERT CONSULTATION ON SMALL SCALE RURAL AQUACULTURE.
ESPINOSA, M.M

REPORT OF THE FIRST SESSION OF THE ADVISORY COMMITTEE ON FISHERIES RESEARCH.
SISSENWINE, M; KURIEN, J

REPORT OF THE NINETEENTH SESSION OF THE COORDINATING WORKING PARTY ON FISHERY STATISTICS.
LAWSON, T

REPORT OF THE REGIONAL WORKSHOP ON THE EFFECTS OF GLOBALIZATION AND DEREGULATION ON FISHERIES IN THE CARIBBEAN.
TIETZE, U

REPORT OF THE SECOND MEETING OF FAO AND NON FAO REGIONAL FISHERY BODIES OR ARRANGEMENTS.
FIPL

REPORT OF THE FIFTEENTH SESSION OF THE COMMITTEE ON FISHERIES.
FAO

REPORT OF THE FOURTH SESSION OF THE COMMISSION FOR INLAND FISHERIES OF LATIN AMERICA.
FAO

REPORT OF THE TRILATERAL WORKSHOP ON LANTERFISH IN THE GULF OF OMAN.
MASKERI, M

REPORT OF THE PRE SURVEY MEETING TO PLAN THE YEAR 2000 SURVEY WITH THE R/V DR FRIDTJOF NANSEN IN THE WESTERN GULF OF GUINEA.
KONAN, J

REPORT OF THE FAO AUSTRALIA WORKSHOP ON THE MANAGEMENT OF PENAEID SHRIMP/ PRAWNS IN THE ASIA PACIFIC REGION.
FAO

REPORT OF THE WORKSHOP ON TUNA FISHERIES MANAGEMENT AND DEVELOPMENT IN THE SOUTHWEST INDIAN OCEAN.
TELMAR, M

REPORT OF THE NINTH SESSION OF THE FISHERY COMMITTEE FOR THE EASTERN CENTRAL ATLANTIC.
KESSEL, V; COLOM, M

REPORT OF THE SIXTH SESSION OF THE INDO PACIFIC FISHERY COMMISSION WORKING PARTY ON FISH TECHNOLOGY AND MARKETING.
JAKARTA, R

REPORT OF THE FIFTEENTH SESSION OF THE COMMITTEE ON FISHERIES.
RACHMAN, A
.jpg)
EXPERT CONSULTATION ON THE REGULATION OF FISHING EFFORT.
CADDY, J.F; POPE, J.G

REPORT OF THE SECOND SESSION OF THE COMMITTEE FOR THE DEVELOPMENT AND MANAGEMENT OF FISHERIES IN THE LESSER ANTILLES.
FAO

PAPERS PRESENTED AT THE FAO UNEP MEETING ON THE TOXICITY ANDD BIOACCUMULATION OF SELECTED SUBSTANCES IN MARINE ORGANISMS.
GASIC, M.J

NATIONAL REPORTS AND SELECTED PAPERS PRESENTED AT THE FOURTH SESSION OF THE WORKING PARTY ON ASSESSMENT OF MARINE FISHERY RESOURCES.
FAO

REPORT OF THE TWELFTH SESSION OF THE FISHERY COMMITTEE FOR THE EASTERN CENTRAL ATLANTIC.
FAO

REPORT OF THE SEVENTH SESSION OF THE WESTERN CENTRAL ATLANTIC FISHERY COMMISSION.
FAO

REPORT OF THE SIXTH SESSION OF THE STANDING COMMITTEE ON RESOURCES RESEARCH AND DEVELOPMENT.
ARMIN, K

REPORT OF THE SIXTH SESSION OF THE COMMITTEE FOR THE DEVELOPMENT AND MANAGEMENT OF FISHERIES IN THE SOUTHWEST INDIAN OCEAN.
DADA, B.F

REPORT OF THE SECOND WORKSHOP ON FISHERY STATISTICS FOR ESTONIA, LATVIA AND LITHUANIA.
LAURI,V

QUALITY CONTROL OF VETERINARY VACCINES IN DEVELOPING COUNTRIES.
MOWATM, N

NATIONAL REPORTS AND SELECTED PAPERS PRESENTED AT THE FOURTH SESSION OF THE WORKING PARTY ON ASSESSMENT OF MARINE FISHERY RESOURCES.
STEVENSON, A

PAPERS PRESENTED AT THE FAO/ UNEP MEETING ON THE TOXICITY AND BIOACCUMULATION OF SELECTED SUBSTANCES IN MARINE ORGANISMS.
RAYIS, E; SALINA, A

PAPERS PRESENTED AT THE FAO UNEP MEETING ON THE TOXICITY AND BIOACCUMULATION OF SELECTED SUBSTANCES IN MARINE ORGANISMS.
FAO

REPORT OF THE SIXTH SESSION OF THE COMMITTEE FOR THE DEVELOPMENT AND MANAGEMENT OF FISHERIES IN THE SOUTHWEST INDIAN OCEAN.
MAXIME, M

FISHING BOAT CONSTRUCTION; 1 BUILDING A SAWN-FRAME FISHING BOAT.
FYSON, F.J

REPORT OF THE FAO WORKSHOP ON SEA CUCUMBER FISHERIES; AN ECOSYSTEM APPROACH TO MANAGEMENT IN THE INDIAN OCEAN.
MUENI, E; KUMARA, A

MATERIALS AND METHODS FOR TAGGING TUNA AND BILLFISHES, RECOVERING THE TAGS AND HANDLING THE RECAPTURE DATA.
BAYLIFF, H; HOLLAND, K.N

REPORT OF THE EXPERT WORKSHOP ON GREENHOUSE GAS EMISSIONS STRATEGIES AND METHODS IN SEAFOOD.
MATHIESEN, M; GREME, M

REPORT OF THE FAO WORKSHOP ON GOVERNANCE OF TENURE FOR RESPONSIBLE CAPTURE FISHERIES.
PATRICK, M; ORENSANZ, J.M

PAPERS PRESENTED AT THE SEVENTH SESSION OF THE STANDING COMMITTEE ON RESOURCES RESEARCH AND DEVELOPMENT.
HANNESSON, R

GEOGRAPHICAL INFORMATION SYSTEMS AND REMOTE SENSING IN INLAND FISHERIES AND AQUACULTURE.
MEADEN, G; KAPETSKY, J

REPORTS OF THE SYMPOSIUM ON SOCIAL, ECONOMIC AMD MANAGEMENT ASPECTS OF RECREATIONAL FISHERIES AND THE INTERSESSIONAL WORKING PARTIES.
FAO

REPORT OF THE SECOND SESSION OF THE COMMITTEE FOR THE DEVELOPMENT AND MANAGEMENT OF FISHERIES IN THE BAY OF BANGAL
ACHARYA, K.C

PAPERS PRESENTED AT THE EXPERT CONSULTATION ON THE REGULATION OF FISHING EFFORT.
FAO

REPORT OF THE FIRST SESSION OF THE WORKING PARTY ON FISHERY STATISTICS.
FAO

REPORT OF THE JOINT SESSION OF THE INDIAN OCEAN FISHERY COMMISSION AND THE INDO PACIFIC FISHERY COMMISSION.
LABON, A

REPORT OF THE FIFTEENTH SESSION OF THE EUROPEAN INLAND FISHERIES ADVISORY COMMISSION.
HUISMAN, E.A

REPORT OF THE THIRD SESSION OF THE COMMITTEE FOR THE DEVELOPMENT AND MANAGEMENT OF FISHERIES IN THE LESSER ANTILLES.
LACROIX, E

REPORT OF THE TECHNICAL CONSULTATION ON OPEN SEA SHELLFISH CULTURE IN ASSOCIATION WITH ARTIFICIAL REEFS.
DUVAL, T; ETTEWA, I

REPORT OF THE FOURTH SESSION OF THE COMMITTEE FOR THE DEVELOPMENT AND MANAGEMENT OF FISHERIES IN THE BAY OF BENGAL.
KOJIMA, N

PAPERS PRESENTED AT THE FAO JAPAN EXPERT CONSULTATION ON THE DEVELOPMENT SYSTEMS FOR ASIA AND THE PACIFIC
BENGZON, B.Q; DELMENDO,M.N

REPORT OF THE THIRD WORKSHOP ON THE BIOLOGICAL AND ECONOMIC MODELLING OF THE SHRIMP RESOURCES OF THE GUYANZA BRAZIL SHELF.
NANSEN, D

MARINE PROTECTED AREAS COUNTRY CASE STUDIES ON POLICY, GOVERNANCE AND INSTITUTIONAL ISSUES.
SANDERS, S.J

FISHING VESSEL EXECUTION OF ACOUSTIC SURVEYS FOR DEEP SEA SPECIES; MAIN ISSUES AND WAY FORWARD.
BOYER, D

REPORT OF THE SIXTH SESSION OF THE STANDING COMMITTEE ON RESOURCES RESEARCH AND DEVELOPMENT.
WARAGODA, N.V

TECHNICAL GUIDELINES FOR MANAGEMENT OF FISHERIES RESOURCES, BIODIVERSITY AND
OGUTU, O; BALIRWA, J.S

THE LIVING MARINE RESOURCES OF THE EASTERN CENTRAL ATLANTIC.
CARPENTER, K; ANGELIS, N

LEGISLATING FOR PROPERTY RIGHTS IN FISHERIES.
STEWART, C

REPORT OF THE SIXTH SESSION OF THE STANDING COMMITTEE ON RESOURCES RESEARCH AND DEVELOPMENT.
FAO

INTERNATIONAL GUIDELINES FOR THE MANAGEMENT OF DEEP SEA FISHERIES IN THE HIGH SEAS.
GAUGLER, P

REVIEW OF THE IMPLEMENTATION OF THE INTERNATIONAL PLAN OF ACTION FOR THE CONSERVATION AND MANAGEMENT OF SHARKS .
FISCHER, J; BARONE, M

REPORT OF THE TECHNICAL CONSULTATION ON INTERNATIONAL GUIDELINES FOR THE MANAGEMENT OF DEEP SEA FISHERIES IN THE HIGH SEAS.
FAO

REPORT OF THE FOURTH SESSION OF THE SUB-COMMITTEE ON AQUACULTURE.
NOMURA, I

FISH IDENTIFICATION TOOLS FOR BIODIVERSITY AND FISHERIES ASSESSMENTS.
FISCHER, J

LEGISLATING FOR AN ECOSYSTEM APPROACH TO FISHERIES A REVIEW OF TRENDS AND OPTIONS IN AFRICA.
SKONHOFT, A

HANDBOOK ON SMALL SCALE FRESHWATER FISH FARMING.
LUBIN, D

REGIONAL REVIEW ON STATUS AND TRENDS IN AQUACULTURE DEVELOPMENT IN SUB-SAHARAN AFRICA-2010.
SATIA, B

FAO FISHERY STATISTICS AQUACULTURE PRODUCTION.
FAO

FAO TECHNICAL GUIDELINES FOR RESPONSIBLE FISHERIES; RECREATIONAL FISHERIES.
KYRGYZSTAN, K

WHAT IS THE CODE OF CONDUCT FOR RESPONSIBLE FISHERIES.
FAO

FISHERIES AND AQUACULTURE EMERGENCY RESPONSE GUIDANCE.
CATTERMOUL, B; BROWN, D

THE STATE OF WORLD FISHERIES AND AQUACULTURE 2002.
FAO

INTERNATIONAL GUIDELINES FOR THE MANAGEMENT OF DEEP-SEA FISHERIES IN THE HIGH SEAS.
GAUGLER, P

FIELD GUIDE TO THE LIVING MARINE RESOURCES OF NAMIBIA.
BIANCHI, G; CARPENTER, K.E; MOLLOY, F.J
Food and Nutrition

FOOD OUTLOOK BIANNUAL REPORT ON GLOBAL FOOD MARKETS
Fao

ENHANCING FOOD SECURITY AND NUTRITION POLICY ASSISTANCE
Jean Balie

RIGHT TO FOOD MAKING IT HAPPEN
Fao

THE NATIONAL FOOD SAFETY STRATEGIC PLAN
Ministry of Health

FOOD INTO CITIES
Olivio Argenti

FOOD PROCESSING AND PACKAGING
Naro

DANISH DAIRY & FOOD INDUSTRY
K. Mark Christensen

FOOD IN THE 21ST CENTURY: FROM SCIENCE TO SUSTAINABLE AGRICULTURE
Mahendra Shah and Maurice Strong

PHILIPPINE AGRICULTURAL AND FOOD POLICIES
Caesar B. Cororaton and Erwan L. Corong

THE RELATION BETWEEN CROP YIELD, NUTRIENT UPTAKE, NUTRIENT SURPLUS AND NUTRIENT APPLICATION
G.O Nijland and J. Schouls

SHAPING GLOBALIZATION FOR POVERTY ALLEVIATION AND FOOD SECURITY
Eugenio Diaz-Bonilla and Sherman Robinson

A 2020 VISION FOR FOOD, AGRICULTURE, AND THE ENVIRONMENT
Ifpri

FOOD AND NUTRITION BULLETIN
Kenneth H. Brown and Sonja Y. Hess, guess editors

RUMINANT NUTRITION
John Chesworth and H. Guerin

THE STORAGE OF FOOD GRAINS AND SEEDS
Jean Appert

THE STATE OF FOOD AND AGRICULTURE
Jacques Diouf

THE STATE OF FOOD
Jaques Diouf

HUMAN NUTRITION IN THE DEVELOPING WORLD
John R. Lupien

m
Joachim von Braun. John McComb. Ben K. Fred-Mensah and Rajul Panya-Lorch

CHILD NUTRITION GUIDELINES
Dr. John T. Kakitahi

FOOD, NUTRITION AND AGRICULTURE
J.L. Albert, L. Ciaffi-Cannizzo

FOOD, NUTRITION AND AGRICULTURE
J.L. Albert and J.R. L UPIEN

THE IMPACT OF CLIMATE CHANGE AND BIOENERGY ON NUTRITION
Brian Thompson and Marc J. Cohen

THE STATE OF FOOD AND AGRICULTURE
Jose Graziano da Silva

FOOD, NUTRITION AND AGRICULTURE GUIDELINES FOR AGRICULTURAL TRAINING CURRICULA IN AFRICA
Z.I. Sabry

COMPENDIUM OF FOOD ADDITIVE SPECIFICATIONS
Dr. Kenji Ishii

POPULATION AND FOOD IN THE EARLY TWENTY-FIRST CENTURY
Nurul Islam
FOOD, NUTRITION AND AGRICULTURE
A. Mitchell and L. Gasperini

FATS AND FATTY ACIDS IN HUMAN NUTRITION
Fao

MANUAL OF FOOD QUALITY CONTROL
Fao

FOOD AND NUTRITION BULLETIN
Kenneth H. Brown anf Sonja Y. Hess.

AGRICULTURE, FOOD SECURITY, AND NUTRITION IN MALAWI
Noora-Lisa Aberman, Janice Meerman, and Todd Benson

INTEGRATING THE RIGHT TO ADQUATE FOOD INTO FOOD AND NUTRITION SECURITY PROGRAMMES
Kostas Stamoulis and Richard China

PROBIOTICS IN FOOD HEALTH AND NUTRITIONAL PROPERTIES AND GUIDELINES FOR EVALUATION
Fao

THE STATE OF FOOD AND AGRICULTURE
Jacques Diouf

THE IMPACT OF MATERNAL EMPLOYMENT AND INCOME ON THE NUTRITIONAL STATUS OF CHILDREN IN RURAL AREAS OF DEVELOPING COUNTRIES
Stewart, C A

REPORT OF THE TWENTY-SIXTH SESSION OF THE COMMITEE ON FOOD AID POLICIES AND PROGRAMMES

IDENTIFYING THE FOOD INSECURE: THE APPLICATION OF MIXED-METHOD APPROACHES IN INDIA
Kimberly; Haddad, L; Ramakrishna, J; Riely, F

THE CONTRIBUTION OF ICRISAT`S MANDATE CROPS TO HOUSEHOLD FOOD SECURITY: A CASE STUDY OF FOUR RURAL VILLAGES IN THE INDIAN SEMI-ARID TROPICS
Kimberly, C

FOOD AND NUTRITION IN THE MANAGEMENT OF GROUP FEEDING PROGRAMMES
Lupien, J R

FRONTIERS OF NUTRITION AND FOOD SECURITY
Kotler, N G

JOINT WHO-UNICEF NTRITION SUPPORT PROGRAMME
Mayeh A; Rota, C; Rispol, E

JOINT FAO/WHO/OAU REGIONAL FOOD AND NUTRITION COMMISSION FOR AFRICA
Idris, N

CARE AND NUTRITION CONCEPTS AND MEASUREMENT
Engle, P L; Purnima M; Haddad, L

FOOD AND NUTRITION PLANNING
Leonard, J; Hilip, P

NUTRITION EDUCATION: A STATE-OF-THE-ART REVIEW
Hornik, R C

MANAGEMENT OF GROUP FEEDING PROGRAMMES
Sabry Z.I.

FOOD, NUTRITION AND AGRICULTURE
Probart, C

FOOD, NUTRITION AND AGRICULTURE
Fao

LINKAGES BETWEEN AGRICULTURE & NUTRITION IMPLICATIONS FOR POLICY & RESEARCH
Eileen, K; Bouis, H E

MYCOTOXIN SURVAILLENCE A GUIDANCE
Fao

BIBLIOGRAPHY OF FOOD CONSUMPTION SURVEYS
Fao

EVALUATION OF NUTRITION INTERVENTIONS
Fao

THE EFFECTS OF SUGARCANE PRODUCTION ON FOOD SECURITY, HEALTH, AND NUTRITION IN KENYA: A LONGITUDINAL ANALYSIS
Eileen, K

CTA ACP-EEP LOME CONVENTION TECHNICAL CENTRE FOR AGRICULTURAL AND RURAL CO-OPERATION
Acp

THE STATE OF FOOD AND AGRICULTURE
LUBIN, D

FRONTIERS AND FOOD SECURITY IN ASIA, AFRICA, AND LATIN AMERICA
Kotler ,N G

FOOD AND NUTRITION IN THE MANAGEMENT OF GROUP FEEDING PROCRAMMES
FAO

JOINT WHO-UNICEF NUTRITION SUPPORT PROGRAMME GLOBAL EVALUATION
Guerra, Ranieri

THE STATE OF FOOD AND AGRICULTURE 2003-2004
FAO

FATS AND FATTY ACIDS IN HUMAN NUTRITION
FAO

HUMAN NUTRITION IN THE DEVELOPING WORLD.
LATHAM, C.M

FOOD, NUTRITION AND AGRICULTURE.
ALBERT, J

UGANDA NATIONAL PLAN OF ACTION FOR NUTRITION
UNPAN

PROBIOTICS IN FOOD HEALTH AND NUTRITIONAL PROPERTIES AND GUIDELINES FOR EVALUATION.
FAO

GUIDANCE NOTE; INTEGRATING THE RIGHT TO ADEQUATE FOOD INTO FOOD AND NUTRITION SECURITY PROGRAMMES.
FAO

THE UGANDA FOOD AND NUTRITION POLICY
MOH

SOME ASPECTS OF PROCUREMENT AND DISTRIBUTION OF FOODGRAINS IN INDIA.
GEORGE, P.S

AGRICULTURE, FOOD SECURITY, AND NUTRITION IN MALAWI
NOORA, L.A; MEERMAN, J.

FOOD AND NUTRITIOIN BULLETIN
FNB

EVALUATION OF NUTRITION INTERVENTIONS
FAO

THE TROPICAL AGRICULTURALIST
COSTE, R; SMITH, A.J

MYCOTOXIN SURVEILLANCE.
UN

BIBLIOGRAPHY OF FOOD CONSUMPTION SURVEYS
FAO

FOOD, NUTRITION AND AGRICULTURE
CHEVALIER, P.H

AGRO FOOD SYSTEM GOVERNANCE ANS SERVICE DELIVERY IN UGANDA.
ACODE

THE STATE OF FOOD AND AGRICULTURE
FAO

AGRICULTURE AS A TOOL IN SOLVING AND NUTRITION PROBLEMS IN UGANDA.
FAO

ENHANCING FOOD SECURITY AND NUTRITION POLICY ASSISTANCE
FAO

FOOD INTO CITIES.
FAO

CHILD NUTRITION GUIDELINES
TUSABE, A

FOOD YAMS ADVANCES IN RESEARCH.
ORKWOR, G.C; EKANAYAKE, I.J

INNOVATIONS IN FOOD LABELLING.
JANICE, A

MUBENDE DISTRICT PLAN OF ACTION FOR NUTRITION
NINSIMA,J

NUTRITION AND HIV/AIDS A HAND BOOK FOR FIELD EXTENSION AGENTS.
UNDP

SELECTING INTERVENTIONS FOR NUTRITIONAL IMPROVEMENT.
LUNVEN, P

REPORT OF THE FOURTH INTER-AFRICAN CONFERENCE ON FOOD AND NUTRITION.
ALSINA, S.A; GUNASENA, D.M

OVERCOMING CHILD MALNUTRITION IN DEVELOPING COUNTRIES PAST ACHIEVEMENTS AND FUTURE CHOICES.
SMITH, L.C; HADDAD, L

THE FOOD AND NUTRITION POLICY FOR TANZANIA.
MOH

FOOD, HEALTH AND CARE
GRANT, P.J

FOOD AID FOR EDUCATION AND TRAINING.
INGRAM, J.C

HOUSEHOLD FOOD SECURITY, NUTRITION AND CROP DIVERSIFICATION AMONG SMALLHOLDER FARMERS IN THE HIGHLANDS OF GUATEMALA.
LMMINK, M.D; ALARCON, J.A

THE RIGHT TO FOOD IN THE THEORY AND PRACTICE.
DIOF, J

NUTRITION; ALTERNATIVE DEFINITIONS AND POLICY IMPLICATIONS.
MAURICE, S; ALBERTO, V

THE STATE OF FOOD SECURITY IN THE WORLD.
KANAYO, F

THE GLOBAL INFORMATION AND EARLY WARNING SYSTEM ON FOOD AND AGRICULTURE.
DIOUF, J

ANNALS OF NUTRITION AND METABOLISM.
KARGER, S

SPORE AGRICULTURE AND NUTRITION STRENGTHENING TIES.
HAILU, M

IMPROVING NUTRITION PROGRAMMES AN ASSESSMENT TOOL FOR ACTION.
SURAIYA, I; NANTEL, G

KABALE DISTRICT PLAN OF ACTION FOR NUTRITION 1997-2001.
BANYA, B

THE STATE OF FOOD SECURITY AND NUTRITION IN THE WORLD.

CABI GLOBAL SUMMIT FOOD SECURITY IN A CLIMATE OF CHANGE.
CABI

AFRICAN JOURNAL OF FOOD AND NUTRITIONAL SCIENCES.
MWADIME, K.N

CHILD NUTRITION GUIDELINES.
TUSABE, A

STRATEGY AND TECHNOLOGY FOR THE INDUSTRY FOOD AND BEVERAGE REPORTER..
MTHETHWA, L

CHILD NUTRITION GUIDELINES.
MWANAMUGIMU, N

IMPROVING NUTRITION PROGRAMMES.
NANTEL, G

MANUAL OF FOOD CONTROL 6 FOOD FOR EXPORT.
DHAMIJA,P
.jpg)
REVIEW OF FOOD CONSUMPTION SURVEYS 1981.
FAO

COMPENDIUM OF FOOD ADDICTIVE SPECIFICATIONS.
WEDLOCK, W

MANUAL OF FOOD QUALITY CONTROL.
ANDREWS, W

COMPENDIUM OF FOOD ADDICTIVE SPECIFICATION ADDENDUM 1.
FISCHER, K

FATS AND OILS IN HUMAN NUTRITION.
KUBENA, R; TSENG, S

STREET FOODS
FAO

NUTRITION EDUCATION FOR THE PUBLIC.
HAEN, D;

FOOD, NUTRITION AND AGRICULTURE GUIDELINES FOR AGRICULTURAL TRAINING CURRICULA IN AFRICA.
BEHAR, M; RITCHIE, J.A

COMPENDIUM OF FOOD ADDICTIVE SPECIFICATIONS ADDENDUM 2.
ATUSHI, O

RESIDUES OF SOME VETERINARY DRUGS IN ANIMALS AND FOODS.
ANADON, A; MCLEAN, J.G

SPECIFICATION FOR IDENTITY AND PURITY OF CERTAIN FOOD ADDITIVES.
MEYLAND, I; KOJIMA, K

COMPENDIUM OF FOOD ADDITIVE SPECIFICATIONS ADDENDUM 11.
HARRIET, W; BELLINGER, C

NUTRITION EDUCATION FOR THE PUBLIC.
HAEN, D; FARNERT, N

STREET FOODS
FAO

JOINT FAO WHO EXPERT CONSULTATION ON RISK ASSESSMENT OF MICROBIOLOGICAL HARZARDS IN FOODS.
FAO

RESIDUES OF SOME VETERINARY DRUGS IN ANIMALS AND FOODS.
FAO

COMPENDIUM OF FOOD ADDICTIVE SPECIFICATION ADDENDUM 9.
FAO

REFLECTIONS ON THE GLOBAL FOOD CRISIS.
HEADEY, D; SHENGGEN, F

EXPERT C CONSULTATION ON NUTRITION INDICATORS FOR BIODIVERSITY.
EZZEDDINE, B

RURAL RADIO RESOURCE PACK HIV AIDS AND NUTRITION.
GEORGINA, S

SUSTAINABLE FOOD SECURITY FOR ALL BY 2020.
JOCHEN, H

2013 GLOBAL FOOD POLICY REPORT.
SHENGGEN, F

GM FOOD SAFETY ASSESSMENT TOOLS FOR TRAINERS.
BOUTRIF,E

25 YEARS OF FOOD POLICY RESEARCH REFLECTIONS BY PER PINSTRUP -ANDERSEN.
BAUTISTA, R.M; BRAUN, J

GLOBAL FOOD PROJECTIONS TO 2020.
ROSEGRANT, M; WITCOVER, J; PAISNER, M

FOOD PRICE VOLATILITY AND NATURAL HAZARDS IN PAKISTAN; MEASURING THE IMPACTS ON HUNGER AND FOOD ASSISTANCE.
CHENG, F; SANOGO, I

FOOD COMPOSITION DATA; PRODUCTION MANAGEMENT AND USE.
GREENFIELD, H

FAO/ WHO GUIDE FOR APPLICATION OF RISK ANALYSIS PRINCIPLES AND PROCEDURES DURING FOOD SAFETY EMERGENCIES.
MICHEAL, J; FARBER, J

PROVIDING FOOD SECURITY FOR ALL
ARORA, P

WORLD FOOD DAY KAWANDA RESEARCH STATION OPEN DAY 16TH OCTOBER, 1983
MUGWISA, S

PROSPECTS FOR GLOBAL FOOD SECURITY; A CRITICAL APPRAISAL OF PAST PROJECTIONS AND PREDICTION.
MCCALLA, A

REPORT OF THE EXPERT CONSULTATION ON RECOMMENDED LIMITS FOR RADIONUCLIDE CONTAMINATION OF FOODS.
GUNNER, S.W

WHEN DISASTER STRIKES EMERGENCY FOOD AID UN FAO WORLD FOOD PROGRAMME.
FAO
Forestry
Study 1 ccc
Geofrey Kapalaga; Florence N Kivunike; Daudi Jjingoxx
Study 6
Geofrey Kapalaga; Florence N Kivunike; Daudi Jjingo
Study 8
Geofrey Kapalaga; Florence N Kivunike; Daudi Jjingo
Study 9
Geofrey Kapalaga; Florence N Kivunike; Daudi Jjingo
Study 10
Geofrey Kapalaga; Florence N Kivunike; Daudi Jjingo

AGROFORESTRY IN ACP COUNTRIES
BEETS, W C

FOREST BASED RURAL ENTERPRISES ;PAKISTAN
SHEIKH, M I

FAIDHERBIA ALBIDA IN THE WEST AFRICAN SEMI ARID TROPICS
VANDENBELDT, R J

WORLD LIST OF FORESTRY SCHOOLS
Flores, M A R

DEVELOPING AGROFORESTRY CURRICULA
RUDEBJER, P G

THE TROPICAL FORESTRY ACTION PLAN
JAMES, G S

FORESTRY POLICIES IN EUROPE
Hummel, F C; Hilmi, H A

FORESTRY POLICIES IN EUROPE
Lanley, J P

GUIDELINES FOR FORESTRY INFORMATION PROCESSING WITH PARTICULAR REFERENCE TO DEVELOPING COUNTRIES
Roessel, J W

FORESTRY EXTENSION METHODS
Sim, D; Hilmi, H A

THE ROLE OF AGROFORESTRY IN THE FARMING SYSTEMS IN RWANDA WITH SPECIAL REFERENCE TO THE BUGESERA GISAKA MIGONGO REGION
BALASUBRAMANIAN, V

AGROFORESTRY IN-SERVICE TRAINING MANUAL
ANGEA, J G S

FOREST REVENUE SYSTEMS IN DEVELOPING COUNTRIES
John, W G

FOREST PRODUCTS
Fao

CLIMATE CHANGE GUIDELINES FOR FOREST MANAGERS
Roario, A; Marcelo, A; Susan, B

FOREST BASED RURAL ENTERPRISES
PESHAWAR

INCORPORATION OF AGROFORESTRY INTO ON-GOING AGRICULTURAL EXTENSION PROGRAMMES IN BUSIA AND KUMI DISTRICTS, EASTERN UGANDA
John, O; John, F E

STATE OF THE WORLD`S FORESTS

STATE OF THE WORLDS FOREST
HOSNY, M

TROPICAL FOREST RESOURCES ASSESSMENT PROJECT
Fao,Un

GLOBAL CONVENTIONS RELATED TO FORESTS
Perlis, A; Ball, J

NEW DIRECTIONS FOR AGRICULTURE, FORESTRY AND FISHERIES
MOHAMED, S Z

PULPING TRIALS OF WOOD SPECIES GROWING IN PLANTATION IN KENYA
PALMER, E R

FAO MODEL CODE OF FOREST HARVESTING PRACTICE
Dennis P D; Rudolf, H

FORESTRY STATISTICS TODAY FOR TOMORROW
Fao

INTENSIVE MULTIPLE-USE FOREST MANAGEMENT IN THE TROPICS
Flores, M A R

ROOT DEVELOPMENT AND PLANTATION PERFORMANCE OF SOME TREE SPECIES AT DODOMA, TANZANIA
WILLIAM, E K

FOREST PRODUCTS PRICES
Policy and planning service forestry department

TIMBERS OF TROPICAL AFRICA CONCLUSIONS AND RECOMMENDATIONS BASED ON PROTA
LEMMENS, R H M

MIXED AND PURE FOREST PLANTATIONS IN THE TROPICS AND SUBTROPICS
Wormald, T J

FOREST PRODUCTS
Fao

THE ROAD FROM RIO: MOVING FORWARD IN FORESTRY
Fao

FOREST RESOURCES
ROSSANA

UNDERSTANDING TREE USE IN FARMING BASED ONWORKSHOP ON PLANNING FUEL WOOD PROJECTS WITH PARTICIPATION OF RURAL PEOPLE
Fao

USE AND POTENTIAL OF WILD PLANTS IN FARM HOUSEHOLDS
DOYLE, B

GROWING TOGETHER AGROFORESTRY AND ICRAF
Icraf

AGROFORESTRY INTERVENTIONS IN UGANDA
Agea, J G; Namirembe, S; Bukenya, M; Zziwa, A; Waiswa, D

WORLD AGROFORESTRY CENTRE

FOREST DEVELOPMENT PROJECT UGANDA
Malleux, J

USEFUL TREES OF ZAMBIA FOR THE AGRICULTRALIST
Fanshawe, D B; Alvin, W

THE ROLE OF SOCIAL FORESTRY IN SUSTAINABLE DEVELOPMENT
Gregersen, H; Sydney, D; Dieter, E

LEGAL AND INSTITUTIONAL ASPECTS OF URBAN AND PERI-URBAN FORESTRY AND GREENING
Lidija, K

AGROFORESTRY APPROACH TO LAND USE
Charles, K S
FOREST PRODUCTS
FAO

THE FOREST-GARDEN FARM OF KANDY, SRI LANKA
McConnell, D J

FORESTRY OPERATIONS SERVICE
peter s

GUIDE TO GOOD PRASCTICE PRASCTICE IN CONTRACT LABOUR IN FORESTRY
EDGAR

GREVILLEA FOBUSTA IN AGROFORESTRY AND FORESTRY
HARWOOD, C E

SUSTAINABLE AGROFORESTRY SYSTEMS FOR THE TOPICS; CONCEPTS AND EXAMPLES
BIAUW, T K

MULTIPLE USE FOREST MANAGEMENT IN THE HUMID TROPICS
CESAR, S

FOREST AND WATER
ARRIANA

DEFORESTATION OR DEVELOPMENT IN THE THIRD WORLD
GERARDO, M

REFORESTATION
DANIEL, S

A SELECTION OF USEFUL TREES AND SHRUBS FOR KENYA
ESTER, Z

AGROFORESTRY FOR IMPROVED LAND USE
DAMARY, O

AGROFORESTRY IN SUB-SAHARAN AFRICA
CYNTHIA, C C

MANAGING TRADE-OFFS IN AGROFORESTRY
SARAH, C

AGRICULTURE IN UGANDA
MUKKIBI, J K

THE ARKANSAS FOREST PRODUCTS INDUSTRY
KLUENDER, R A

DETERIORATION OF CREOSOTE TREATED EUCALYPT TRANSMISSION POLES IN TANZANIA
KARANJA, K M

FOREST PRODUCTS
MARTINS

FORESTRY OPERATION SERVICE
ROBERT T.J

AGROFORESTRY DEVELOPMENT IN KENYA
KILEWE, A M

SCIENCE IN AGROFORESTRY
PEDRO, S

AGROFORESTRY PROCEEDINGS OF THE 50TH ON TROPICAL AGRICULTURE
MAYDELL, H J

FIELD GUIDE TO THE FOREST TREES OF GHANA
HAWTHORNE, W

AGROFORESTRY TODAY 1997-1999
JOAN, B

SAND DUNE STABILIZATION SHELTERBELTS AND AFFORESTATION IN DRY ZONES
SALEM, B B

ENVIRONMENTAL IMPACT OF FORESTRY
ZIMMERMANN, R C

GLOBAL FOREST RESOURCES ASSESSMENT 2005
ISSOUF, A

CATALOG 67
SAM, B

INTRODUCING AGROFORESTRY A TEACHING GUIDE FOR THE TECHNICAL LEVEL
NIMZANAEL, K

DATA ANALYSIS OF AGROFORESTRY EXPERIMENTS
RICHARD, C

FORESTRY WORK IN VILLAGES
NAKINTU, J O

FORESTRY EXTENSION ORGANISATION
HILMI, H A

THE COSTS AND BENEFITS OF AGROFORESTRY TO FARMERS
SARA, J S

ZONE FORESTRY
LANLY, J P

FOREST PRODUCTS
CARLOS

INTRODUCING AGROFORESTRY
NIMZANAEL, K

TREES OF CHANGE
PEDRO, S

IMPACT OF THE GLOBAL FOREST INDUSTRY ON ATMOSPHERIC GREENHOUSE GASES
MINER

DATA ANALYSIS OF AGROFORESTRY
CAO DUC

AGROFORESTRY NEWS
POLLY, M

FOREST DAY
YVO DE BOER

FOREST RESOURCES
ANNE

PROCEEDING OF A JOINT SEMINAR/WORKSHOP ON MANAGEMENT OF NATURAL FORESTS OF TANZANIA.UNDER SOKOINE UNIVERSITY UNIVERSITY OF AGRICULTURE.
MGENI, A S M

DATA ANALYSIS OF AGROFORESTRY EXPERIMENTS
SESBAN, S

DATA ANALYSIS OF AGROFORESTRY EXPERIMENTS
RICHARD, C

THE TROPICAL FOREST ACTION PLAN
EDOUARD, S

AGROFORESTRY IN SERVICE TRAINING MANUAL
AGEA, JG; NAMIREMBE, S

STATE OF THE WORLDS FORESTS
BRAATZ, S

DEVELOPING AGROFORESTRY CURRICULA
RUDEBJER, P G

THE POTENTIAL ROLE OF AGROFORESTRY IN ACP COUNTRIES
BEETS, WC

THE FOREST FOR THE TREES GOVERNMENT POLICIES AND THE MISUSE OF FOREST RESOURCES
REPETTO, R

INTRODUCING AGROFORESTRY
EWNETU, Z

FAIDHERBIA ALBIDA
VANDENBELDT, RJ

DATA ANALYSIS OF AGROFORESTRY EXPERIMENTS
RICHARD COE

USE OF TREES BY LIVESTOCK
BENNISON, JJ

STATE OF MEDITERRANEAN FORESTS 2013
EDUARDO, R

COMMERCIAL APPLICATIONS OF CLONING FOR FOREST PLANTATIONS
LANDIS, E

A GUIDE FOR FIELD WORKERS AND FACILITATIONS
KABOGGOZA, JRS

APPLICATION OF SMALL SCALE AFFORESTATION AND REFORESTATION CDM METHODOLOGY TO LOW INCOME RURAL COMMUNITIES IN PARAGUAY
MATSUBARA, E

FORESTRY RESEARCH INSTITUTE
MUGARURA; VAN

FOREST PRODUCTS
SIMPSON, S

AGROFORESTRY MAKING A DIFFERENCE IN PEOPLE LIVES
CHATER, S

TREES FOR LIFE
BOSCO, R

FORESTRY RESEARCH INSTITUTE
ALUMA, JR W

USE OF TREES BY LIVESTOCK PROSOPIS
CLINCH, NJL; PATERSON, RT

USEFUL TREES FOR FARMING
CALOTHYRSUS

AGROFORESTRY FOR DEVELOPMENT IN KENYA;AN OVERVIEW
GATAHUN, A

TECHNOLOGY IMPACT EVALUATION IN AGROFORESTRY PROJECTS
SCHERR, S J

AGROFORESTRY IN KENYA; EXPERIENCES OF THE KENYA RENEWABLE ENERGY DEVELOPMENT PROJECT
CYRUS

ROOT TRAINERS IN SEEDLING PRODUCTION SYSTEMS FOR TROPICAL FORESTRY AND AGROFORESTRY
SCOTT

CHINA NATIONAL AFFOERSTATION PROJECT
MILLER, J H

AGROFORESTRY IN ZAMBIA
KAMARA, C.S; GOSSANGE, SJ

BUILDING PARTNERSHIPS FOR SCALING UP THE IMPACT OF AGROFORERSTRY IN UGANDA
OKORIO, J

THE BANANA COFFEE ROBUSTA; TRADITIONAL AGROFORESTRY SYSTEM OF UGANDA
ODUOL, P A

SURVEYING FARMERS AGROFORESTRY PLOTS; EXPERIENCES IN EVALUATING ALLEY CROPPING AND TREE BORDER TECHNOLOGIES IN WESTERN KENYA
SARA J

AGROFORESTRY AND FUELWOOD IN SUB SAHARAN AFRICA
TEEMBA, H

EVALUATING INSTITUTIONAL CAPACITY FOR AGROFORESTRY RESEARCH
SARA J

USEFUL TREES FOR FARMING
THOMAS

REFORESTATION
POHJONEN, B VM

AGROFORESTRY FOR IMPROVED LAND USE
ODANGA, D

FOREST DEVELOPMENT PROJECT
MALLEUX, J

MODE CODE OF FOREST HARVESTING PRACTICE
DYKSTRA, D P

GLOBAL CONVENTIONS RELATED TO FORESTS
ELVAREZ, E; PERLIS, A

CLIMATE CHANGE GUIDELINES FOR FOREST MANAGERS
VENDERNABEELE, J

INCORPORATION OF AGROFORESTRY INTO ON GOING AGRICULTURAL EXTENSION PROGRAMMES IN BUSIA AND KUMI DISTRICT
OKORIO, J

TROPICAL FOREST RESOURCES ASSESSMENT PROJECT
FLORES, R

STATE OF THE WORLD FORESTS
DUGAN, P

FOREST PRODUCTS 2010
FAO

AGROFORESTRY DEVELOPMENT IN KENYA
KILEWE A.M

FOREST PRODUCT 2015
FAO

FORESTS AND WATER
FAO

WORLD AGROFORESTRY CENTRE
GARRITY, D

LEGAL AND INSTITUTIONAL ASPECTS OF URBAN AND PERI URBAN FORESTRY AND GREENING
KNUTH, L

FORESTS, TREES AND PEOPLE
MWEBESA, M

WORLD LIST OF FORESTRY SCHOOLS
RODAS F

FORESTRY POLICIES IN EUROPE
HUMMEL F.C

FAIDHERBIA ALBIDA IN THE WEST AFRICAN SEMI ARID TROPICS
VANDENBELDT R.J

STRATEGIES FOR SUSTAINABLE AGRICULTURE AND RURAL DEVELOPMENT
FAO

FOREST BASED RURAL ENTERPRISES
SHEWIKH M.I

DATA ANALYSIS OF AGROFORESTRY EXPERIMENTS
ALLAN, E

TREES OF CHANGE CORPORATE REPORT
PEDRO

AGROFORESTRY IN THE WEST AFRICAN SAHEL
DIOUF, A

FORESTRY OPERATIONS SERVICES
FAO

DEFORESTATION OR DEVELOPMENT IN THE THIRD WORLD
MATTI, P

FIELD GUIDE TO THE FOREST TREES OF GHANA
WISE, R

IMPACT OF THE GLOBAL FOREST INDUSTRY ON ATMOSPHERIC GREEN HOUSE GASES
REID, M

AGROFORESTRY APPROACH TO LAND USE.
SSEKABEMBE, C

FORESTRY EXTENSION METHODS
SIM D.

GUIDE TO GOOD PRACTICE IN CONTRACT LABOUR IN FORES
KASTENHOLZ, E

MIXED AND PURE FOREST PLANTATIONS AND SUBTROPICS
WORMALD T.J

FOREST PRODUCTS PRICES
FAO

GREVILLEA ROBUSTA IN AGROFORESTRY AND FORESTRY
HARWOOD C.E

ROOT DEVELOPMENT AND PLANTATION PERFORMANCE OF SOME TREE SPECIES AT DODOMA
KIJOTI, W

UNDERSTANDING TREE USE IN FARMING SYSTEMS
BERNARD

INTENSIVE MULTIPLE USE FOREST MANAGEMENT IN THE TROPICS
RODAS; FLORES

TREE PATHOLOGY COOPERATIVE PROGRAMME
JOLAND, R

CASHEW AS AN AGROFORESTRY CRO.
BEHRENS, R

PROCEEDINGS OF THE POLICY MAKERS WORKSHOP ON AGROFORESTRY EDUCATION AND NATURAL RESOURCE UTILIZATION IN EASTERN PROVINCE OF ZAMBIA, 18-22 NOVEMBER 1997 AT KATETE, CHIPATA,ZAMBIA.
MAFONGOYA, P.L; MTONGA, H.L

DIAGNOSTIC STUDY ON SMALL AND MEDIUM FOREST ENTERPRISES IN UGANDA.
NATURAL ENTERPRISES DEVELOPMENT LTD.

AGROFORESTRY PRACTICES IN SELECTED AREAS OF BURMA; PRELIMINARY RECOMMENDATIONS.
KANK, W
AGROFORESTRY GENERAL CONCEPTS, EARLY WORK AND CURRENT INITIATIVES.
LABELLE, R

AN ASSESSMENT OF SEASONAL INCREMENT OF FUEL STICKWOOD IN PASTURE.
BOER, E

DIAGNOSTIC SURVEYS AND MANAGEMENT INFORMATION SYSTEMS IN AGROFORESTRY PROJECT IMPLEMENTATION.
MULLER, G; GIBSON, D

ICRAF AND AGROFORESTRY A VISION AND A PLAN OF ACTION.
HELEN, H;

SUSTAINABLE AGROFORESTRY SYSTEMS FOR THE TROPICS; CONCEPTS AND EXAMPLES.
BIAUW, T.K

SAVING THE TROPICAL FORESTS.
ROBINSON, M

THE WORLD AGROFRESTRY CENTRE.
SWAMINATHAN, M.S

ACACIA SEYAL A MONOGRAPH
ANDREW, A

THE FRUIT OF OUR LABOUR
HOUTEN, H

PEST MANAGEMENT IN AGROFORESTRY SYSTEMS; A RECORD OF DISCUSSION HELD AT CAB INTERNATIONAL, WALLINGFORD, UK
GREENLAND, D.J; HUXLEY, P.A

PERCEPTIONS OF FORESTS.
PERLIS, A

REINVENTING FORESTRY EDUCATION.
ERVIN, V

FOREST MANAGEMENT AT THE XII WORLD FORESTRY CONGRESS.
DONAVAN, R

APPROACHES TO AGROFORESTRY CURRICULUM DEVELOPMENT.
KASOLO, W

AN ACCOUNT OF THE ACTIVITIES OF THE INTERNATIONAL COUNCIL FOR RESEARCH IN AGROFORESTRY.
HUXLEY, P.A

PRIORITIES FOR FORESTRY AND AGROFORESTRY POLICY RESEARCH.
GREGERSEN, H.M

POTENTIAL IMPACT OF BIOTECHNOLOGY RESEARCH FOR MULTIPURPOSE TREE SPECIES.
WILFREDO, C

PRICING SOFTWOOD PLANTATION TIMBER ON THE BASIS OF MID LOG DIAMETER.
MONELA, G.C

MEETING HOUSEHOLD NEEDS; FARMER TREE GROWING STRATEGIES IN WESTERN KENYA.
SCHER, J.S

POTENTIAL GAINS FROM FORESTRY RESEARCH AND A COMPARISON WITH AGRICULTURAL COMMODITIES; A PRELIMINARY ASSESSMENT.
JEFF, D; TURNBULL, J

FAO, FORESTS AND FORESTRY.
FAO

AGROFORESTRY IN DRYLAND AFRICA.
ROCHELEAU,; WEBER, F

AGROFORESTRY RESEARCH IN THE MIOMBO ECOLOGICAL ZONE OF SOUTHERN AFRICA.
MAGHEMBE, A.J; HENDRIK, P

THE CHALLENGE OF SUSTAINABLE FOREST MANAGEMENT.
MURRAY, C.H

CALLIANDRA ; A MULTIPURPOSE TREE FOR AGROFORESTRY SYSTEMS IN SRI LANKA.
GUNASENA, H.P; WIJENAIKE, W.C

GREVILLEA ROBUSTA IN AGROFORESTRY AND FORESTRY.
HARWOOD, C.E

WOODFUEL CONSUMPTION IN TORORO DISTRICT.
LAKUMA, O.K

AN INTRODUCTION TO AGROFORESTRY.
RAMACHANDRAN, P.K

NOTES ON TREES AND SHRUBS IN ARID AND SEMI ARID REGIONS.
BAUMER, M

TIMBERS OF TROPICAL AFRICA; CONCLUSION AND RECOMMENDATIONS BASED ON PROTA TIMBERS.
LEMMENS, R.H.M.J

THE POTENTIAL OF AGROFORESTRY FOR SOIL CONSERVATION.
YOUNG, A

PROJECT AFRENA RWANDA RAPORT A ACITIVIES.
AMADOU, I.N

WOOD AND AGRICULTURAL RESIDUE COMBUSTION SYSTEM.
SARWAR, G; ROBINSON, A.P

EVALUATION OF FIELD AND LABORATORY METHODS FOR TESTING TERMITE RESISTANCE OF TIMBER AND BUILDING MATERIALS IN GHANA, WITH RELEVANT BIOLOGICAL STUDIES.
WILLIAMS, RMC

UGANDAS AGROECOLOGICAL ZONES.
ELEDU, A

HYGIENIC MILK COLLECTION AND TESTING.
MUZIRA, I

LIVELIHOODS AND LANDSCAPES.
KIDANE, B

A TIMBER DRYING SYSTEM FUELLED BY SAWDUST.
MARDER, R.C

EXTERNAL EVALUATION OF THE PROJECT ALTERNATIVES TO SLASH AND BURN FOREST FALLOW..
ESWARAN, H

WOOD CARBONIZATION UNIT DESIGN AND DEVELOPMENT OF A PROTOTYPE WITH RECOVERY OF WASTE HEAT.
KRISHNAN, K.R

EXTERNAL EVALUATION OF THE KENYA NATIONAL AGROFORESTRY PROJECT FOR THE COFFEE BASED LAND USE SYSTEMS.
KAMUGISHA, J.R

NATIONAL AGROFORESTRY PRIORITIES AND PROGRAMS IN INDIA
ICRAF

REPORT OF THE THIRD EXTERNAL PROGRAM AND MANAGEMENT REVIEW OF THE WORLD AGROFORESTRY CENTRE.
JEFFERY, B; SIMEON, E

STATE OF THE WORLD FORESTS .
HEINO, J

DEVELOPING AGROFORESTRY CURRICULA.
RUDEBJER, G; AUGUST, B

PULP AND PAPER CAPACITIES.
MAHADEVAN, S

DEVELOPMENT OF AGROFORESTRY TECHNOLOGY FOR THE REHABILITATION OF TROPICAL FORESTS.
YOKOTA, Y; GOTOH, T

CONGRESS HIGHLIGHTS.
LANGFORD, K

NATIONAL FOREST MONITORING SYSTEMS; MONITORING AND MEASUREMENT, REPORTING AND VERIFICATION IN THE CONTEXT OF REDD ACTIVITIES.
FRUMHOFF, R.E; NEPSTAD,C

REPORT OF THE THIRD EXTERNAL PROGRAM AND MANAGEMENT REVIEW OF THE WORLD AGROFORESTRY CENTRE.
ENGIDA, G; HARWOOD, C

FOREST PRODUCTS.
FAO

PRIORITIES FOR FORESTRY AND AGROFORESTRY POLICY RESEARCH.
GREGERSEN, H; ORAM, P

AGROFORESTRY AT THE SERVICE OF FARMERS AND THE ENVIRONMENT.
OUMAROU, K

REPORT OF THE THIRD EXTERNAL PROGRAM AND MANAGEMENT REVIEW OF THE WORLD AGROFORESTRY CENTER.
GETACHEW, E; SIMEON, E

FACULTY OF FORESTRY
SIRITO, N; MEILUDE, O

FOREST VOLUME ESTIMATION AND YIELD PREDICTION.
RODAS, F

RESEARCH MANAGEMENT IN FORESTRY.
LANLY, J.P

TROPICAL FOREST RESOURCES.
LANLY, J

BASIC TECHNOLOGY IN FOREST OPERATIONS.
BERNARD, M

SMALL SCALE HARVESTING OPERATIONS OF WOOD AND NON WOOD FOREST PRODUCTS INVOLVING RURAL PEOPLE.
VIRGILIO, C

FOREST PRODUCTS PRICES.
FAO

TROPICAL ANIMAL FEEDING.
PRESTON, T.R

THE ECOLOGY EFFECTS OF EUCALYPTUS.
LANLY, J.P; POORE, M.E

ESTABLISHING PULP AND PAPER MILLS.
RODES, A

FRAME SAW MANUAL
FAO

FORESTRY AND RURAL DEVELOPMENT.
RODAS, F

SMALL SCALE HARVESTING OPERATIONS OF WOOD AND NON WOOD FOREST PRODUCTS INVOLVING RURAL PEOPLE.
VIRGILIO, C

GUIDE TO IMPLEMENTATION OF PHYTOSANITARY STANDARDS IN FORESTRY.
PRADO, J.A

INTERNATIONAL YEAR OF FOREST 2011.
PERLIS, A; HOFER, T

GLOBAL NEEDS AND PROBLEMS OF THE COLLECTION, STORAGE AND DISTRIBUTION OF MULTIPURPOSE TREE GERMPLASM.
BURLEY, J

HOW FOREST CAN REDUCE POVERTY.
LAKANY, E

A TREE FOR ALL REASONS; THE INTRODUCTION AND EVALUATION OF MULTIPURPOSE TREES FOR AGROFORESTRY.
WOOD, P.J;BURLEY, J

ASKING THE EARTH FARMS FORESTRY AND SURVIVAL IN INDIA
JEREMY, S; PEREIRA, W
Horticulture

MANUAL FOR HORTICULTURAL EXPORT QUALITY ASSURANCE.
MARITIME, C

A GUIDE TO SERICULTURE PRACTICES IN UGANDA
NDYABAGYE, J

KOREAN JOURNAL OF HORTICULTURAL SCIENCE AND TECHNOLOGY.
JAYAPRAKASAM, B

HORTICULTURE, ENVIRONMENT AND BIOTECHNOLOGY.
YOUNG, P; BYUNG, S

DEVELOPMENT OF THE HORTICULTURE INDUSTRY.
MINAS, K

HORTICULTURE, ENVIRONMENT AND BIOTECHNOLOGY.
KIM, S.B; YONG, S

GROWING GREENER CITIES IN AFRICA.
MODIBO, T

A PROPOSAL TO ESTABLISH A MIXED FARM FOR POULTRY PIGGERY AND HORTICULTURE.
THORN, T
Land Economics

FARM EQUIPMENT SUPPLY CHAINS.
SLIMS, B.G; KIENZLE, J

AFRICA GATHERS IN EGYPT REPORTS AND ANALYSIS FROM THE FORUM ON CHINA AFRICA COOPERATION.
SEBASTIAO, C; BINGYI, W

TOWARDS THE DIGITAL LIBRARY ; FINDINGS OF AN INVESTMENT TO ESTABLISH THE CURRENT STATUS OF UNIVERSITY LIBRARIES IN AFRICA.
ROSENBERG, D

PICKING UP WEST CHINA DEVELOPMENT BLOOMS AFTER GOVERNMENT STIMULUS.
BALINGABO, P; PEMPA, A

INTERNATIONAL CONFERENCE ON SUSTAINABLE CONTRIBUTION OF FISHERIES TO FOOD SECURITY.
COATES, D

THE EAST AFRICAN COMMUNITY BILL 2001.
KATEGEYA, A

FARMERS LEADING CHANGE.
FERNANDEZ, M; LUSEMBO, P

MINISTRY OF NATURAL RESOURCES POLICY STATEMENT ON THE 1993/94 BUDGET ESTIMATES PRESENTED TO THE NATIONAL RESISTANCE COUNCIL BY THE MINISTER OF NATURAL RESOURCES HON HENRY MUGANWA KAJURA.
KAJURA, M

NATIONAL AGRICULTURAL RESEARCH STRATEGY AND PLAN.
UGANDA WORKING GROUP.

STRENGTHENING CAPACITY FOR RURAL INNOVATION,
KHALFAOUI, L

JOINT FAO/WHO EXPERT CONSULTATION ON RISK ASSESSMENT OF MICROBIOLOGICAL HAZARDS IN FOOD.
KASUGA, F

REPORT OF THE WORKSHOP ON FISHERY CREDIT AND MARKETING DEVELOPMENT.
GODBOLE, B.K; TRAIPOL, S

REPORT OF THE FOURTH SESSION OF THE SUB COMMITTEE ON FISH TRADE.
FAO

REPORT OF THE EXPERT CONSULTATION ON ECONOMIC INCENTIVES AND RESPONSIBLE FISHERIES.
NOMURA, I

FIELD MANUAL ON COST ESTIMATION IN SAWMILLING INDUSTRIES.
FAO

COST ESTIMATING IN SAWMILLING INDUSTRIES; GUIDELINES.
FAO

ESTIMATION OF CROP AREAS AND YIELDS IN AGRICULTURAL STATISTICS.
FAO

SEED MARKETING
MUMBY, G

WHOLESALE MARKETS PLANNING AND DESIGN MANUAL.
TRACEY, W.D

INSPECTORATE OF GOVERNMENT REPORT TO PARLIAMENT.
TUMWESIGYE, J

COOPERATIVES FOR STAPLE CROP MARKETING EVIDENCE FROM ETHIOPIA.
TANGUY,B; ALEMAYEHU, S

TRANSLATING FUNCTIONAL LITERACY INTO COMMUNITY DEVELOPMENT ACTION; AN ASSESSMENT OF REFLECT APPROACH IN BUNDIBUGYO DISTRICT OF UGANDA.
KYOMUHENDO, S

STRATEGIES FOR POVERTY ALLEVIATION AND SUSTAINABLE RESOURCE MANAGEMENT IN THE FRAGILE LANDS OF SUB-SAHARAN AFRICA.
HAZELL, P; BABU, S

SOCIOECONOMIC STRUCTURE AND CHANGE IN FOUR ARKANSAS REGIONS.
TIM, A; BERNAL, G

SOCIOECONOMIC CONSIDERATIONS IN BIOSAFETY DECISION MAKING
DANIELA, H; ZAMBRANO, P

CIVIL SERVICE REFORMS AND THE LIVING STANDARDS OF RETRENCHED CIVIL SERVANTS; A CASE STUDY OF KAMPALA DISTRICT.
NANKUNDA, H

THE ROLE OF WOMEN SOCIAL SUPPORT NETWORKS IN COPING WITH URBAN POVERTY; CASE STUDY OF KISENYI AND KIFUMBIRA SLUMS IN KAMPALA CITY.
SSEWAKIRYANGA, R

SAFEGUARDING FOOD SECURITY IN VOLATILE GLOBAL MARKETS.
PRAKASH, A

WORKSHOP ON DECENTRALIZED RURAL FINANCE.
DEDORATH, G

THE CHALLENGES OF GLOBALIZATION THE ROLE OF THE WORLD BANK.
WOLFENSOHN, J

FOOD SECURITY IN THE RUSSIAN FEDERATION.
SEDIK, D; WIESMANN, D

HOUSEHOLD EFFORTS IN POVERTY ALLEVIATION IN NORTHERN UGANDA WITH RESPECT TO AGRICULTURE UNDER STRUCTURAL ADJUSTMENT PROGRAM; THE CASE OF ARUA DISTRICT.
ADEBUA, A

THE EFFECTS OF CIVIL SERVICE REFORM PROGRAMME ON THE WELFARE OF FAMILIES IN LIRA DISTRICT.
ORONE, P; ANGURA, O

POPULATION AND DEVELOPMENT IMPLICATIONS FOR THE WORLD BANK.
CHOKSI, M.A

INNOVATION FOR INCLUSIVE VALUE-CHAIN DEVELOPMENT.
DEVAUX, A; TORERO, M; HORTON, D

UGANDA WOMEN IN DEVELOPMENT.
ABIDI, S.H

EAST AFRICAN COMMUNITY ECONOMIC POTENTIALS AND CONSTRAINTS OF DEVELOPING LAKE VICTORIA BASIN AS AN ECONOMIC GROWTH ZONE.
MUSHENGA, A.N

EAST AFRICAN COMMUNITY LAKE VICTORIA BASIN COMMISSION OPERATIONAL STRATEGY
LVBC

VALUE CHAIN DYNAMICS AND THE SMALL SCALE SECTOR.
TROND, B; AUDUN, L

UGANDA SUSTAINABLE LAND MANAGEMENT PUBLIC EXPENDITURE REVIEW.
OBIAGELI, E; JOHANNES, W

STRATEGIES FOR POVERTY ALLEVIATION AND SUSTAINABLE RESOURCE MANAGEMENT IN THE FRAGILE LANDS OF SUB-SAHARAN AFRICA.
HAZELL, P; BABU, S

POLICIES FOR SUSTAINABLE LAND MANAGEMENT IN THE HIGHLANDS OF ETHIOPIA; SUMMARY OF PAPERS AND PROCEEDINGS OF A SEMINAR HELD AT THE INTERNAL LIVESTOCK RESEARCH INSTITUTE, ADDIS ABABA, ETHIOPIA, 22-23 MAY 2000
JABBAR, M.A; PENDER, J; EHUI, S.K

TREATING THE FIELD AS A LAB; A BASIC GUIDE TO CONDUCTING ECONOMICS EXPERIMENTS FOR POLICY MAKING
ANGELINO, G.V

FAO LAND TENURE STUDIES 3; LAND TENURE AND RURAL DEVELOPMENT.
MAXIMILIANO, C

IDS BULLETIN; WAR AND RURAL DEVELOPMENT IN AFRICA.
JEREMY, S

IDS BULLETIN; MICRO-CREDIT IMPACT, TARGETING AND SUSTAINABILITY.
SAURABH, S

SUSTAINABLE DEVELOPMENT; POPULATION AND THE ENVIRONMENT.
CYNTIA, P.G

MILLIONSFED; PROVEN SUCCESS IN AGRICULTURAL DEVELOPMENT.
RICHARD, L

LAND TENURE JOUNAL.
ALEXANDER, M

POVERTY POLICY PERSPECTIVES; THE ROLE OF NON GOVERNMENTAL ORGANIZATION IN SOCIAL DEVELOPMENT; A STUDY OF HEALTH SECTOR NGOS IN MBALE AND MUBENDE DISTRICTS 1997
WALERA, I; NAFUNA, W

PROCEEDINGS OF A CTA MAPA SEMINAR MARKETING AND DISTRIBUTION OF PERISHABLE FOOD PRODUCTS.
PALOMERO, L

PARTIAL BUDGET ANALYSIS FOR ON-FARM RESEARCH.
MANYONG, V.M; ALIMI, A

TOWARDS SUSTAINABLE SORGHUM PRODUCTION, UTILIZATION, AND COMMERCIALIZATION IN WEST AND CENTRAL AFRICA,
SEDGO, J; AKINTAYO, I

PRODUCTION INCENTIVES IN PHILIPPINE AGRICULTURE; EFFECTS OF TRADE AND EXCHANGE RATE POLICIES
BAUTISTA, R.M

PRIVATE SECTOR PARTICIPATION IN WATER SUPPLY AND SANITATION IN LATIN AMERICA
IDELOVITCH, E; RINGSKOG, K

IMPACT OF INTERNATIONAL VOLUNTARY STANDARDS ON SMALLHOLDER MARKET PARTICIPATION IN DEVELOPING COUNTRIES.
LOCONTO, A; DANKERS, C

SOCIOECONOMICS AND POLICY PROGRAM; ASSESSING ADOPTION POTENTIAL OF NEW GROUNDNUT VARIETIES IN MALAWI.
freeman, a.h; merwe, j

MANUAL OF GENEBANK OPERATIONS AND PROCEDURES
KAMESWARA, N; BRAMEL, P.J

WORKING PAPER;SUSTAINABLE RURAL LIVELIHOODS A FRAME WORK FOR ANALYSIS.
SCOONES, I

FAO AGRICULTURAL POLICY AND ECONOMIC DEVELOPMENT SERIES; HANDBOOK FOR DEFINING AND SETTING UP A FOOD SECURITY INFORMATION AND EARLY WARNING SYSTEM.
JACQUES, V

REPORT OF THE INTERNALLY COMMISSIONED EXTERNAL REVIEW OF THE CGIAR GENEBANK OPERATIONS.
SGRP

CAUSES AND EFFECTS OF THE 1980 FAMINE IN KARAMOJA.
OKUDI, B

NOW IS THE TIM; A PLAN TO CUT HUNGER AND POVERTY IN AFRICA.
SENATOR,R

GENDER PERSPECTIVES ON PROPERTY AND INHERITANCE.
BRUYN,M; VALK, M

HOUSEHOLD EFFORTS IN POVERTY ALLEVIATION IN NORTHERN UGANDA WITH RESPECT TO AGRICULTURE UNDER STRUCTURAL ADJUSTMENT PROGRAM; THE CASE OF ARUA DISTRICT.
ADEBUA, A; OBONG, O

THE EFFECTS OF CIVIL SERVICE REFORM PROGRAMME ON THE WELFARE OF FAMILIES IN LIRA DISTRICT
ANGURA, T; ORONE, P

POPULATION AND DEVELOPMENT IMPLICATIONS FOR THE WORLD BANK.
DONALD, M; MAGUIRE,J

ORGANISATIONAL PROBLEMS IN PLANNING EDUCATIONAL DEVELOPMENT.
ALEXANDER, K

ACHIEVING FOOD SECURITY IN SOUTHERN AFRICA.
HADDAD, L

HOUSEHOLD ECONOMICS; IMPLICATIONS FOR THE ATTAINMENT OF ENROLMENT OF GIRLS IN SCHOOLS IN UGANDA.
KYOMUHENDO, B.G

SQUID CUTTLEFISH AND OCTOPUS;A STUDY OF THE WORLD MARKET FOR CEPHALOPODS.
CADDY, J.F

PROGRESS FOR A SMALL PLANET.
BARBARA, W

IMPROVING RURAL LIVES; NURTURING TREES AND FORESTS FOR POVERTY ERADICATION.
MUHAKANIZI, K

THE EFFECTS OF TRADE AND EXCHANGE RATE POLICIES ON PRODUCTION INCENTIVES IN AGRICULTURE.
KIRKPATRICK, C; DIAKOSAVVAS, D

THE CHALLENGES FOR SUB-SAHARAN AFRICA.
MCNAMARA, R

RURAL POVERTY ALLEVIATION POLICIES AND TRENDS.
SRINIVASAN, T.N; STAHL, M; SWANSON, B.E

FAMINE EARLY WARNING AND RESPONSES-THE MISSING LINK
BUCHANAN, S; SUSANNA, D

FEEDING THE WORLD, PREVENTING POVERTY, AND PROTECTING THE EARTH A 2020 VISION.
GANDHI, I

EVALUATING CAPACITY DEVELOPMENT; EXPERIENCES FROM RESEARCH AND DEVELOPMENT ORGANIZATIONS AROUND THE WORLD.
HORTON, D; ALEXAKI, A; CAMPILA, D; CARDEN, F

FAO LAND TENURE STUDIES; DECENTRALIZATION AND RURAL PROPERTY TAXATION
HILTON, A; ALEXEY, D

WOMEN AND THE ENVIRONMENT; A READER CRISIS AND DEVELOPMENT IN THE THIRD WORLD.
SONTHEIMER, S.

CONFRONTING CRISIS A COMPARATIVE STUDY OF HOUSEHOLD RESPONSES TO POVERTY AND VULNERABILITY IN FOUR POOR URBAN COMMUNITIES.
CAROLINE, O.N

DESIGN OF POVERTY ALLEVIATION STRATEGY IN RURAL AREAS.
GAIHA, R

REORIENTING THE COOPERATIVE STRUCTURE IN SELECTED EASTERN EUROPEAN COUNTRIES; CASE STUDY ON POLAND
HUNEK, T

MARKETING RESEARCH AND INFORMATION SYSTEMS.
CRAWFORD, I.M

RURAL POVERTY, RISK AND DEVELOPMENT.
FAFCHAMPS, M
Livestock
Study 3
Geofrey Kapalaga; Florence N Kivunike; Daudi Jjingo
Study 4
Geofrey Kapalaga; Florence N Kivunike; Daudi Jjingo
Study 7
Geofrey Kapalaga; Florence N Kivunike; Daudi Jjingo
sss
sss

IMPROVING LIVESTOCK MARKETING AND INTRA-REGIONAL TRADE IN WEST AFRICA.
WILLIAMS, T.O; SPYCHER, B.

CASSAVA AS LIVESTOCK FEED IN AFRICA.
HAHN, S.K; REYNOLDS, L

THEORY AND APPLICATIONS OF SELECTION INDICES FOR THE IMPROVEMENT OF MODERN POULTRY STOCKS.
ARKBAR, M.K; BROWN, C.J

LIVESTOCK DEVELOPMENT STRATEGIES FOR LOW INCOME COUNTRIES.
TREVOR, W; MACK, S

MIXED CROP LIVESTOCK FARMING.
SCHIERE, H

BREEDING PLANS FOR RUMINANT LIVESTOCK IN THE TROPICS.
BUVANENDRAN, C; MASON, I

MANUAL ON MEAT COLD STORE OPERATION AND MANAGEMENT.
MUNOZ, C.G

FEEDING DAIRY COWS IN THE TROPICS.
SPEEDY, A; SANSOUCY, R

VETERINARY DIAGNOSTIC BACTERIOLOGY.
CARTER, G.R; PESTI, L

LEGUME TREES AND OTHER FODDER TREES AS PROTEIN SOURCES FOR LIVESTOCK.
SPEEDY, A; PUGLIESE, P

SHEEP AND GOAT BREEDS OF INDIA.
ACHAYA, R.M

MANUAL FOR THE PRODUCTION OF MAREK DISEASE, GUMBORO DISEASE AND INACTIVATED NEWCASTLE DISEASE VACCINES
PALYA, V

LIVESTOCK BREEDS OF CHINA.
JASIOROWSKI, H.A

TRYPANOTOLERANT CATTLE AND LIVESTOCK DEVELOPMENT IN WEST AND CENTRAL AFRICA.
SHAW, A.P

CONSTRUCTION AND OPERATION OF MEDIUM SIZED ABATTOIRS IN DEVELOPING COUNTRIES.
FREDERICK, V

TRYPANOTOLERANT LIVESTOCK IN WEST AND CENTRAL AFRICA.
WISSSOCQ, Y.J

ANIMAL GENETIC RESOURCES; CRYOGENIC STORAGE OF GERMPLASM AND MOLECULAR ENGINEERING.
TURTON, J.D

DIAGNOSIS AND VACCINATION FOR THE CONTROL OF BRUCELLOSIS IN THE NEAR EAST.
NICOLETTI, P;

SUSTAINABLE LIVESTOCK PRODUCTION IN THE MOUNTAIN AGRO-ECOSYSTEM OF NEPAL.
ABINGTON, J.B

DISTRIBUTION AND IMPACT OF HELMINTH DISEASES OF LIVESTOCK IN DEVELOPING COUNTRIES.
OVER, H.J; JANSEN, J

SMALL SCALE POULTRY PROCESSING.
SILVERSIDE, D

MIXED CROP LIVESTOCK FARMING.
SCHIERE, H; KATER, L

BREEDING PLANS FOR RUMINANT LIVESTOCK IN THE TROPICS
buvanendran, v

SMALLHOLDER RURAL POULTRY PRODUCTION.
TREITZ, B

FIGHTING POVERTY THROUGH DAIRY CATTLE ZERO GRAZING.
SAAMANYA, J.P; WAISWA, C

BIOFUEL CO-PRODUCTS AS LIVESTOCK FEED OPPORTUNITIES AND CHALLENGES.
MAKKAR, P.S

MAKING CHANGE STRATEGIES WORK; GENDER SENSITIVE, CLIENT ORIENTED LIVESTOCK EXTENSION IN COAST PROVINCE, KENYA.
MAARSE, L; WENHOLT, W; CHIBUDU, A

TRANSHUMANT GRAZING SYSTEMS IN THE TEMPERATE ASIA.
SUTTIE, J.M; REYNOLDS, S.G

ASSESSING THE DISTRIBUTIONAL IMPACT OF TECHNICAL CHANGE IN LIVESTOCK AND GRAINS PRODUCTION IN DEVELOPING COUNTRIES.
CRANFIELD, J.A; HERTEL, T.W

COLLECTIVE ACTION FOR GRAZING LAND MANAGEMENT IN MIXED CROP LIVESTOCK SYSTEMS IN THE HIGHLANDS OF NORTHERN ETHIOPIA.
BERHANU, G; PENDER, J; TESFAY, G

NATURE AND DETERMINANTS OF COLLECTIVE ACTION FOR WOODLOT MANAGEMENT IN NORTHERN ETHIOPIA.
BERHANU, G; GIRMAY,T

NATURE AND DETERMINANTS OF COLLECTIVE ACTION FOR WOODLOT MANAGEMENT IN NORTHERN ETHIOPIA.
BERHANU, G; PENDER, J; TESFAY, G

COLLECTIVE ACTION FOR GRAZING LAND MANAGEMENT IN MIXED CROP LIVESTOCK SYSTEMS IN THE HIGHLANDS OF NORTHERN ETHIOPIA.
BERHANU, G; PENDER, J

POLICIES FOR LIVESTOCK DEVELOPMENT IN THE ETHIOPIAN HIGHLANDS.
BENIN, S; EHUI, S

IMPACTS OF LAND REDISTRIBUTION ON LAND MANAGEMENT AND PRODUCTIVITY IN THE ETHIOPIAN HIGHLANDS.
BENIN,S; PENDER, J

PROPERTY RIGHTS, RISK AND LIVESTOCK DEVELOPMENT.
JABBAR, M.A; STEVEN, J

POULTRY HOUSE CONSTRUCTION WITH GENERAL AND DETAILED PLANS.
ELFORD, F.C; CUTTERIDGE, H.S
NARO Section

A BASELINE ASSESSMENT OF BANANA PRODUCTION AND MANAGEMENT PRACTICES IN UGANDA
Tushemereirwe, W; Bagamba, F; Katungi, E; Kikulwe; Karamusa, D; Edmeades; Smale, S M

CITROUS PRODUCTION

POULTRY PRODUCTION
Naro

CLIENT-ORIENTED AGRICULTURAL RESEARCH AND DISSEMINATION PROJECT
Leonard, O

SOME LOCAL VEGETABLES AND FRUITS OF UGANDA
Naro

GROUNDNUT PRODUCTION GUIDE FOR UGANDA
Kalule, O D; Monyo, E; Deom, C M; Ininda, J; Oloka, H K

VEGETABLE GROWER`S GUIDE
Narl

GROWING MUSHROOMS
Narl

NARO DIJEST INNOVATING FOR GROWTH
TUMUSHABE, N

AGRICULTURAL RESEARCH TO FIGHT POVERTY
NARO

A BASELINE ASSESSMENT OF BANANA PRODUCTION AND MANAGEMENT PRACTICES IN UGANDA
NARO

NARO RESEARCH HIGHLIGTS
NARO

CITRUS PRODUCTION
NARO

FARMERS LEADING CHANGE
NARO

NARO AGRICULTURE IN THE NEWS VOL 9 NO. 3 JULY-SEPTEMBER 1999
OLOYA, O; LUGANDA, P

NARO AGRICULTURE IN THE NEWS VOL 6 NO. 4 OCTOBER-DECEMBER 1996
LUTWAMA, E; OKULLO, O

7TH ACSS CONFERENCE 5-9TH DECEMBER, 2005
NARO

NARO AGRICULTURE IN THE NEWS VOL 11 NO. 4 OCTOBER- DECEMBER 2001.
ARIS/NARO

NARO AGRICULTURE IN THE NEWS VOL 9 NO. 1 JANUARY-MARCH 1999
ARIS

NARO AGRICULTURE IN THE NEWS VOL. 12 NO. 2 APRIL-JUNE 2002
NARO

NARO AGRICULTURE IN THE NEWS VOL. 6, NO.4, OCTOBER-DECEMBER 1996
NYIRA, D; SSEBUWUFU, P

NARO AGRICULTURE IN THE NEWS VOL 5, NO 3, JULY-SEPTEMBER
NARO

GROWING MUSHROOMS
NARO

NARO AGRICULTURE IN THE NEWS JULY TO SEPTEMBER 1995 VOL.4 NO.3
NARO

AGRICULTURE IN THE NEWS JANUARY TO MARCH 1996 VOL.5 NO.1
NARO

AGRICULTURE IN THE NEWS VOL 11, NO. 1. JANUARY -MARCH 2000
ANGURA, J; SHAMBA, M

ORIENTED AGRICULTURAL RESEARCH AND DISSEMINATION PROJECT
DFID

NARO AT A GLANCE PAST, PRESENT AND FUTURE.
NARO

DOCUMENTATION OF THE ATF SUPPORTED PROJECTS ANNUAL REVIEW MEETING.
KIBWIKA, P; MUSOKE, N

THE CONTRIBUTION OF NARO TO THE MODERNISATION OF AGRICULTURE IN UGANDA.
MUKIIBI, J

INFORMATION POLICY AND STRATEGY
MUKIIBI,J

ABSTRACTS OF CENTENARY CONFERENCE 6TH-8TH OCTOBER 1998.
SABIITI, E.N; MIKENGA, S

CONTRACT BETWEEN THE NARO AND AGRIDEA COORDINATING ORGANISATION.
KYETERE, D

THE NATIONAL AGRICULTURAL RESEARCH ACT; ARRANGEMENTS OF SECTION.
NARO

DIRECTORY OF AGRICULTURAL RESEARCH PROJECTS IN UGANDA.
MUKIIBI, J

NARO BRIEF TO PARLIAMENTARIANS.
NARO

NARO ANNUAL REPORT 1998.
LUBEGA, J; TIZIKARA, C

NARO NGO PARTNERSHIPS CURRENT STATUS, POTENTIAL AREAS AND ARRANGEMENTS FOR NGO PARTNERSHIPS.
NARO

PROCEEDINGS OF THE NATIONAL CONSULTATION FOR NARO NGO PARTNERSHIPS.
KHANDELWAL, R

PROSPECTS FOR ENHANCING NAADS NARO PARTNERSHIPS IN IMPROVING RESEARCH EXTENSION INTERFACE..
NADDY S; BYEKWASO, D
.jpg)
NARO FACING THE RESEARCH CHALLENGES FOR THE MODERNISATION OF AGRICULTURE.
MUKIIBI, J

ENNIMA NENKOZESA YA MUWOGO.
ADUPA, J; KALIBALA, A

HUMAN RESOURCES MANUAL OF NARO STAFF TERMS AND CONDITIONS OF SERVICE.
KAYANJA, I.B

THE NARO BULLETIN
ANGUZU, R; LUBEGA, J

NARO FIELD PERFORMANCE ASSESSMENT TECHNOLOGY AND SERVICE SURVEY REPORT.
KAYOBYO, G; NANYEENYA, W

TECHNOLOGY GENERATION AND TRANSFER EXHIBITION INFORMATION GUIDE UMA SHOW GROUNDS LUGOGO.
NARO

THE NARO BULLETIN A BI MONTHLY PUBLICATION BY NARO.
ANGUZU, R

NARO RESEARCH PUBLICATION, 1995-1999.
AGONA, J; KYAMANYWA, S

NARO BRIEF TO PARLIAMENTARIANS 2001
NARO

REPUBLIC OF UGANDA ESTABLISHMENT OF NATIONAL AGRICULTURAL RESEARCH ORGANIZATION.
MUGERWA, J; SSENTONGO, Y

ABI ZONAL AGRICULTURAL RESEARCH AND DEVELOPMENT INSTITUTE FIVE YEAR STRATEGIC PLAN 2007-2012.
MUKALAZI, J

OUTREACH AND PARTNERSHIP INITIATIVE A STRATEGY FOR DECENTRALISATION AND MUTUAL INSTITUTIONAL LEARNING.
MUKIIBI, J

SCOPE AND IMPLEMENTATION GUIDELINES.
OBUA, J

KAWANDA AGRICULTURAL RESEARCH INSTITUTE MANDATE AND ACTIVITIES.
KARI
Natural Resource Management

INTEGRATED NATURAL RESOURCE MANAGEMENT RESEARCH FOR THE HIGHLANDS OF EAST AND CENTRAL AFRICA
Kellen, K; Lilian, O

ENVIRONMENTAL AND NATURAL RESOURCE MANAGEMENT POLICY AND LAW
Eldad, M T

STATE OF THE ENVIRONMENT REPORT FOR UGANDA 1994
MoNR

THE ENVIRONMENT
Earl, H

TOWARDS ENVIRONMENTALLY SUSTAINABLE DEVELOPMENT IN SUB-SAHARAN
Prevost, Y A; Peter, G

ENVIRONMENTAL IMPACT ASSESSMENT OF IRRIGATION AND DRAINAGE PROJECTS
Dougherty, T C; Hall, A W

PROCEEDINGS OF THE SECOND REGIONAL WORKSGOP HELD IN KAMPALA, UGANDA
Dar es Salaam, Kenya, Tanzania; Uganda

INTEGRATED MANAGEMENT OF RESOURCES IN AFRICA
Ferrari, M

DEALING WITH SOIL POLLUTION
Soren, J

WETLAND RESTORATION: FLOOD PULSING AND DISTURBANCE DYNAMICS
Beth, M

GUIDELINES FOR ENVIRONMENTAL IMPACT ASSESSMENT IN UGANDA
John, O

ENVIRONMENTAL ENTOMOLOGY VOL. 21 NO. 4
Sappington; T W

ENVIRONMENTAL ENTOMOLOGY VOL. 24 NO. 1
David, W W; Liebhold, M A

ENVIRONMENTAL ENTOMOLOGY VOL. 21 NO. 3
Stouthamer R; Luck, R F.; Hojn, H. W

ENVIRONMENTAL ENTOMOLOGY VOL. 31 NO. 3
Cameron, A E.

ENVIRONMENTAL ENTOMOLOGY VOL. 25 NO. 1
Pinhassi N; Nestel D; Rosen D

ENVIRONMENTAL ENTOMOLOGY VOL. 31 NO. 5
Cameron, A E

ENVIRONMENTAL ENTOMOLOGY VOL. 22 NO. 3
Kemp; W P

ENVIRONMENTAL ENTOMOLOGY VOL. 22 NO. 2
Kemp, W P

ENVIRONMENTAL ENTOMOLOGY VOL. 31 NO. 4
Cameron, A E

ENVIRONMENTAL ENTOMOLOGY VOL. 21 NO. 2
Kemp W P

ENVIRONMENTAL ENTOMOLOGY VOLUME 22 NUMBER 2
Kemp, W P

ENVIRONMENTAL ENTOMOLOGY VOLUME 25 NUMBER 1
Kemp, W P

ENVIRONMENTAL ENTOLOGY VOLUME 31 NUMBER 5
Cameron, E A; Aldrich, J R; Brewster, C C

ENVIRONMENTAL ENTOLOGY VOLUME 25 NUMBER 1
Meitzler, M A; Araujo, E H; Foote, R H

ENVIRONMENTAL ENTOLOGY VOLUME 25 NUMBER 1
Cameron, E A; Aldrich, J R; Brewster, C C

EVIRONMENTAL ENTOLOGY VOLUME 21 NUMBER 3
Kemp, W P; Stinner, R E

ENVIRONMENTAL ENTOLOGY VOLUME 24 NUMBER 1
Meitzler, M A; Araujo, E

ENVIRONMENTAL ENTOMOLOGY VOLUME 21 NUMBER 4
Kemp, W P; Stinner, R E

ENVIRONMENTAL ENTOMOLOGY VOLUME 29 NUMBER 5
00462252000

ENVIRONME4NTAL ENTOMOLOGY VOLUME 28 NUMBER 4
00462251999

ENVIRONMENTAL ENTOMOLOGY VOLUME 28 NUMBER 3
Meitzler, M A

ENVIRONMENTAL ENTOMOLOGY VOLUME 25 NUMBER 3
Meitzler, M A; Foote,R H

ENVIRONMENTAL ENTOMOLOGY VOLUME 28 NUMBER 5
Meitzler, M A; Clancy, K M

ENVIRONMENTAL ENTOMOLOGY VOLUME 26 NUMBER 6
Meitzler, M A; Foote R H; D; Clancy, K M

ENVIRONMENTAL ENTOMOLOGY VOLUME 29 NUMBER 4
Meitzler, M A; Logan, J A

ENVIRONMENTAL ENTOMOLOGY VOLUME 22 NUMBER 6
Kemp, W P; Stinner, R E
ENVIRONMENTAL ENTOMOLOGY VOLUME 21 NUMBER 2
Kemp, W P; Stinner , R E

ENVIRONMENTAL ENTOMOLOGY VOLUME 26 NUMBER 2
Meitzler, M A ; Stinner, R E

ENVIRONMENTAL ENTOMOLOGY VOLUME 30 NUMBER 6
Meitzler, M A; Logan , J A

ENVIRONMENTAL ENTOMOLOGY VOLUME 27 NUMBER 1
Clancy, K M; Lysyk, T; Logan , J A

ENVIRONMENTAL ENTOMOLOGY VOLUME 31 NUMBER 2
Cameron, E A; Aldrich, J R

ENVIRONMENTAL ENTOMOLOGY VOLUME 26 NUMBER 5
Meitzler, M A; Clancy, K M

ENVIRONMENTAL ENTOMOLOGY VOLUME 31 NUMBER 6
Cameron, E A; Aldrich ,J R

ENVIRONMENTAL ENTOMOLOGY VOLUME 29 NUMBER 1
Lysyk , T; Logan , J A; Messina , F J

ENVIRONMENTAL ENTOMOLOGY VOLUME 27 NUMBER 4
Clancy , K A; Lysyk , T; Logan , J A

ENVIRONMENTAL ENTOMOLOGY VOLUME 27 NUMBER 5
Clancy , K M; Lysyk , T; Messina , F J

ENVIRONMENTAL ENTOMOLOGY VOLUME 28 NUMBER 1
Clancy , K M; Lysyk , T; Logan ,J A

ENVIRONMENTAL ENTOMOLOGY VOLUME 30 NUMBER
Logan, J A; Onstad, D W; Vargo, E L

ENVIRONMENTAL ENTOMOLOGY VOLUME 32 NUMBER 1
Cameron , E A; Aldrich, J R

ENVIRONMENTAL ENTOMOLOGY VOLUME 26 NUMBER 1
Stinner, R E; Clancy K M

ENVIRONMENTAL ENTOMOLOGY VOLUME 22 NUMBER 1
Kemp, W P; Stinner, R E; Zack, R S

ENVIRONMENTAL ENTOMOLOGY VOLUME 25 NUMBER 5
Stinner, R E; Clancy, K M; Herbert, D A

ENVIRONMENTAL ENTOMOLOGY VOLUME 27 NUMBER 2
Clancy, K M; Lysyk, T; Logan, J A

ENVIRONMENTAL ENTOMOLOGY VOLUME 26 NUMBER 3
Stinner, R E

ENVIRONMENTAL ENTOMOLOGY VOLUME 26 NUMBER 4
Stinner, R E; Clancy, K; Lysyk, T

ENVIRONMENTAL ENTOMOLOGY VOLUME 23 NUMBER 1
Kemp, W P; Stinner, R E

ENVIRONMENTAL ENTOMOLOGY VOLUME 22 NUMBER 5
Kemp, W P; Stinner, R E

ENVIRONMENTAL ENTOMOLOGY VOLUME 27 NUMBER 3
Clancy, K M; Lysyk, T; Logan, J A; Messina, F J

ENVIRONMENTAL ENTOMOLOGY VOLUME 29 NUMBER 3
Lysyk, T; Logan, J A; Messina, F J,

ENVIRONMENTAL ENTOMOLOGY VOLUME 29 NUMBER2
Lysyk, T; Logan, J A; Vargo, E L

ENVIRONMENTAL ENTOMOLOGY VOLUME20 NUMBER 6
Kemp, W P; Stinner, R E

ENVIRONMENTAL ENTOMOLOGY VOLUME 24 NUMER 4
Kemp, W P; Stinner,R

ENVIRONMENTAL ENTOMOLOGY VOLUME 28 NUMBER 6
Clancy, K M; Lysyk, T

ENVIRONMENTAL ENTOMOLOGY VOLUME 28 NUMBER 2
Clancy, K M; Lysyk, T; Logan, J A

ENVIRONMENTAL ENTOMOLOGY VOLUME 27 NUMBER 6
Clancy, K M; Lysyk, T

ENVIRONMENTAL ENTOMOLOGY VOLUME 29 NUMBER 6
Logan, J A; Onstad, D W; Vargo, E L

ENVIRONMENTAL ENTOMOLOGY VOLUME 23 NUMBER 5
Kemp, W P; Stinner, R E; Meitzler, M A

ENVIRONMENTAL ENTOMOLOGY VOLUME 30 NUMBER 4
Logan, J A; Onstad, D W; Vargo, E L

ENVIRONMENTAL ENTOMOLOGY VOLUME 21 NUMBER 1
Kemp, W P; Stinner, R E

ENVIRONMENTAL ENTOMOLOGY VOLUME 25 NUMBER 2
Stinner, E R; Clancy, K M

ENVIRONMENTAL ENTOMOLOGY VOLUME 23 NUMBER 6
Kemp, W P; Stinner, R

ENVIRONMENTAL ENTOMOLOGY VOLUME 24 NUMBER 3
Kemp, W P, Stinner, R

WETLAND RESTORATION FLOOD PULSING AND DISTURBANCE DYNAMICS.
MIDDLETON, B

GUIDELINES FOR ENVIRONMENTAL IMPAC ASSESSMENT IN UGANDA.
OKEDI, J

INTEGRATED NATURAL RESOURCE MANAGEMENT RESEARCH FOR THE HIGHLANDS OF EASTERN AND CENTRAL AFRICA.
ICRAF

PROCEEDING OF THE SECOND REGIONAL WORKSHOP HELD IN KAMPALA, UGANDA.
LVEMP

INTEGRATED MANAGEMENT OF RESOURCES IN AFRICA.
ATCHIA, M; RUGUMAYO, E

GUIDELINES FOR ENVIRONMENTAL IMPACT ASSESSMENT IN UGANDA 2
NEMA

ENVIRONMENTAL INFORMATION SYSTEMS IN SUB SAHARAN AFRICA.
FAO

PREPARING NATIONAL REGULATIONS FOR WATER RESOURCES MANAGEMENT
FO

ENVIRONMENTAL AND NATURAL RESOURCE MANAGEMENT POLICY AND LAW.
TUKAHIRWA, M.E; ELDAD M.

UGANDA NATIONAL STUDY IN SUPPORT OF THE INTER-GOVERNMENTAL NEGOTIATING COMMITTEE ON DROUGHT AND DESERTIFICATION.
SEKITOLEKO, V

PROTECT MOUNT ELGON FOREST RESERVE.
NEAP

NATIONAL WETLANDS CONSERVATION AND MANAGEMENT PROGRAMME 1996
IUCN

HORTICULTURE ENVIRONMENT AND BIOTECHNOLOGY
YOUNG, D.P

NATIONAL ENVIRONMENTAL ACTION PLAN
FAO

SCIENTIFIC RESEARCH AND DEVELOPMENT
FAO

SCIENTIFIC RESEARCH AND DEVELOPMENT 2
FAO

ENVIRONMENTAL AND NATURAL RESOURCE MANAGEMENT POLICY AND LAW.
WRI

TUBULAR PLASTIC BIO-DIGESTER.
SIMALENGA, E.T; GOHI, B

TERRESTRIAL CARBON OBSERVATION.
HEIMANN, M; OLSON, R

ROUGHAGE UTILIZATION IN WARM CLIMATE.
CHENOST, M

COMMUNICATION AND NATURAL RESOURCE MANAGEMENT.
FERROUKHI, L

CLIMATE CHANGE GOVERNANCE HUMAN SETTLEMENT NATURAL RESOURCE SUSTAINABLE MARKETS.
KIVUITU, M; NAZNEEN, K

GENDER ISSUES IN INTEGRATED PEST MANAGEMENT IN AFRICAN AGRICULTURE.
MALENA, C

PASSPORT TO MAINSTREAMING GENDER IN WATER PROGRAMMES.
ESTHER, J

ASSESSING SUCCESSIVE LEAF YIELD PERFOMANCE OF DUAL PURPOSE COWPEA TO DECREASE SEASONAL SHORTAGE OF NUTRIENTS IN RESOURCE POOR SMALL SCALE HOUSEHOLDS OF TANZANIA AND UGANDA.
POLREICH, S

AGRICULTURAL POLICIES FOR SUSTAINABLE MANAGEMENT AND USE OF NATURAL RESOURCES IN AFRICA.
VORDZORGBE, D; TSHIBAKA,T

GOOD STATISTICAL PRACTICE FOR NATURAL RESOURCES RESEARCH
ELEANOR, A; STERN, R; DALE, I

THE GRAIN-EATING BIRDS OF SUB-SAHARAN AFRICA; IDENTIFICATION, BIOLOGY AND MANAGEMENT.
ALLAN, R

A GUIDE TO SCOBICS; A KEFRI-ICRAF-IMPERIAL COLLEGE LONDON LENDING INITIATIVE FOR RESOURCE POOR SMALLHOLDER FARMERS IN WESTERN KENYA REGION.
GITAU, M; POULTON, C; NDUFA, K.J

STRATEGIES FOR POVERTY ALLEVIATION AND SUSTAINABLE RESOURCE MANAGEMENT IN THE FRAGILE LANDS OF SUB-SAHARAN AFRICA.
KNOX, A; BABU, S

WHY GOVERNMENTS CANT MAKE POLICY; THE CASE OF PLANT GENETIC RESOURCES IN THE INTERNATIONAL ARENA.
MICHEL, P; FOWLER, C; WANDA, C

PILOT ANALYSIS OF GLOBAL ECOSYSTEMS AGROECOSYSTEMS
STANLEY, W; SEBASTIAN, K; SCHERR, J.S

POVERTY POLICY PERSPECTIVES; PROPERTY RIGHT, COMMUNITY PARTICIPATION AND NATURAL RESOURCE MANAGEMENT; THE DYNAMICS OF THE TENURE QUESTION AND MANAGEMENT OF KIBALE FOREST PARK.
BIKAAKO, W.K

ENVIRONMENTAL IMPACT ASSESSMENT; GUIDELINES FOR FAO FIELD PROJECTS.
COLBERT, D

THE PROBLEMS OF COMMUNITY PARTICIPATION THE MANAGEMENT OF NATURAL RESOURCES IN NAKASONGOLA COUNTY, LUWERO DISTRICT.
MUHEREZA, F,E

AGRO-ECOSYSTEMS NATURAL RESOURCES MANAGEMENT AND HUMAN HEALTH RELATED RESEARCH IN EAST AFRICA.
PEDEN, D,G; SALEEM, M
Pests and Diseases

THE TERMITE GENUS AMITERMES IN AFRICA AND THE MIDDLE EAST
Sands W.A

DESERT LOCUST MANAGEMENT: A TIME FOR CHANGE
Joffe, S R

AN INTRODUCTION TO THE ALGAE
Ian, M

THE PESTICIDE BOOK
Ware, G W

LOCUSTS AND GRASSHOPPERS OF ECONOMIC IMPORTANCE IN THAILAND
Roffey, J

NATURAL CROP PROTECTION
STOLL, G.

AN ANNOTATED LIST OF DISEASES, PATHOGENS AND ASSOCIATED FUNGI OF THE COMMON BEAN IN EATERN AND SOUTHERN AFRICA.
ALLEN, D.J

INTERGRATED PEST MANAGEMENT.
ODHIAMBO R.T.

GUIDELINES FOR QUALITY
DALE, E.W.

FIELD INSECT PESTS OF RICE IN AFRICA BIOLOGY CONTROL.
UKWUNGWU, M.N; UMEH, E.D.N.

MALARIA AND LAND:A SPATIAL AND TEMPORAL RISK ANALYSIS IN SOUTHERN SRI LANKA
KLINKENBERG, E; AMERASINGHE, P.F

A LITERATURE GUIDE FOR THE IDENTIFICATION OF PLANT PATHOGENIC FUNGI.
ROSSMAN, A Y; PALM, M. E.

PEST OF WEST INDIAN SEA ISLAND COTTON
INGRAM, W.R

MAJOR INSECTS PESTS OF MAIZE IN AFRICA.
BOSQUE, N P.

SAFE USE OF INSECTICIDES IN AGRICULTURE
JACKAI, L E.N

A PICTORIAL GUIDE TO THE IDENTIFICATION OF SEEDBORNE FUNGER MILLET CHICKPEA PIGEONPEA AND GROUNDNUT
AHMED, K.M.

HANDBOOK FOR THE IDENTIFICATION OF LEAFHOPPERS AND PLANTHOPPERS OF RICE.
CLARIDGE, F.M.

PEST CONTROL IN GROUNDNUTS
FEAKIN, D.S.

PESTICIDE RESIDUES IN FOOD 2006 JOINT FAO WHO MEETING ON PESTICIDE RESIDUES
LUNN, D; HAMILTON, D.

PETICIDE RESIDUES IN FOOD 1988
ARNOLD, E.P

PLANT PROTECTION AND QUARANTINE
KAHN, P R.

8TH INTERNATIONAL CONGRESS OF PLANT PATHOLOGY
ABIIAS, M; ABBRINIA, M.

PESTICIDE RESIDUES IN FOOD 1986
CLEGG,D.J

SUBMISSION AND EVALUATION OF PESTICIDE RESIDUES DATA FOR THE ESTIMATION OF MAXIMUM RESIDUE LEVELS IN FOOD AND FEED.
PIETERS, A.J; BESEMER, AF.

PESTICIDE RESIDUES IN FOOD 1987
ENGELINA, M.

PESTICIDE RESIDUES IN FOOD 1982
AMERASEKERE, C.

INTEGRATED PEST MANAGEMENT STRATEGIES AND POLICIES FOR EFFECTIVE IMPLEMENTATION
FORNO, A D.

COMPEDIUM OF CORN DISEASES
WHITE, D.G

PESTICIDE RESIDUES IN FOOD 1984
BERRY, C.L

PESTICIDE RESIDUES IN FOOD 1988
BAKRY, N.MS

PEST, DISEASES AND NUTRITIONAL DISORDERS OF THE COMMON BEAN IN AFRICA.
WORTMAN, C.S;AMPOFO J.K

PESTICIDE APPLICATION METHODS
BALS, T.

TRAINING MANAUAL FOR TSETSE CONTROL PERSONNEL
POLLOCK, M.S

PESTICIDE RESIDUES IN FOOD 1990
BATES, J.A.R.

INTEGRATED PEST MANAGEMENT OF TROPICAL PERENNIAL CROPS.
MIRIAU, D.

GUIDELINES FOR INTEGRATED CONTROL OF COTTON PESTS.
FRISBIE, R.E.

PEANUT STRIPE VIRUS
DOLLET, M;SHAW,J.G

PESTICIDE RESIDUES IN FOOD 1991
CLEGG, D.J

INSECT PESTS OF TROPICAL FOOD LEGUMES.
SINGH S.R

PESTICIDE RESIDUES IN FOOD 2004
MAQCLACHLAN, D.

PESTICIDE RESIDUES IN FOOD 1993
AHLBORG, U.G

PESTICIDE RESIDUES IN FOOD 1992
BENES, V

PESTICIDE RESIDUES IN FOOD 1997
BORZELLECA, J.

PESTICIDE RESIDUES IN FOOD 1990
BLACK, A.L

PESTS DISEASES AND NUTRITIONAL DISORDERS OF THE COMMON BEAN IN AFRICA.
AMPOFO J.K.O;ALLEN,D.J

PESTICIDES RESIDUES IN FOOD 1988
FAO

THE TERMITE GENUS AMITERMES IN AFRICA AND THE MIDDLE EAST.
SANDS, W.A

WEED TECHNOLOGY
BRITTON,A.

LOCUSTS AND GRASSHOPPERS OF ECONOMIC IMPORTANCE IN THAILAND
ROFFEY, R.

THE PESTICIDE BOOK
WARE, GW.

AN INTRODUCTION TO THE ALGAE.
MORRIS,I.

COMMONWEALTH INSTITUTE OF BIOLOGICAL CONTROL.
BENNET,F; GHANI,M.

DESERT LOCUST MANAGEMENT A TIME FOR CHANGE
MCCALLA, A;JOFFE,R.S

WEED CONTROL AND NITROGEN FERTILIZATION AS MANAGEMENT ALTERNATIVES FOR SMALL FARM, COW CALF PRODUCTION
ERLINGER, L

MODELING PLANT VIRUS DISEASE EPIDEMIC
BERSTCHINGER , L.;HARDY, B.

GUIDELINES ON ORGANISATION AND OPERATION OF TRAINING SCHEMES AND CERTIFICATION PROCEDURES FOR OPERATORS OF PESTICIDE APPLICATION EQUIPMENT.
FAO

COMMON WEALTH INSTITUTE OF BIOLOGICAL CONTROL.
MALICKY, H.

HOST SELECTION BEHAVIOR OF HELICOVERPA ARMIGERA.
FARIS, DG; MCDONALD, D; SASTRY, B.V.R

COMMONWEALTH INSTITUTE OF BIOLOGICAL CONTROL.
GHANI, MA.

BACTERIAL AND FUNGIAL DISEASES OF PLANTS IN THE TROPICS
WEBER, G.F.

1ST CONFERENCE ON STORED PRODUCT INSECT PEST
NAHDY, M.S; AGONA, A

BIOLOGICAL CONTROL PROGRAMMES AGAINST INSECTS AND WEEDS IN CANADA.
SIMMONDS, F.J.

GUIDELINES ON STANDARDS FOR AGRICULTURAL PESTICIDE APPLICATION EQUIPMENT AND RELATED TEST PROCEDURES.
FAO

CROP PROTECTION HANDBOOK CEREALS.
ATTWOOD, P.

INTERNATIONAL CODE OF CONDUCT ON THE DISTRIBUTION AND USE OF PESTICIDES
SAOUMA, E.

GUIDELINES ON GOOD PRACTICE FOR GROUND APPLICATION OF PESTICIDES.
FAO

INTERNATIONAL CODE OF CONDUCT ON THE DISTRIBUTION AND USE OF PESTICIDES.
SAOUMA, E.

INSECTICIDA SALUT
BASF

CROP PROTECTION INFORMATION.
HARRIS, K.M

MYCOSPHAERELLA LEAF SPOT DISEASES OF BANANA.
ORTIZ, R;ESCALANT, J.V.

URBAN ENTOMOLOGY
ROBINSON, W.H; GULLAN,P.J.

THE INSECT PESTS OF FOREST PLANTATION TREES IN THE SOLOMON ISLANDS.
BIGGER, M.

GUIDELINES ON STANDARDS FOR AGRICULTURAL PESTICIDE APPLICATION EQUIPMENT AND RELATED TEST PROCEDURES.
FAO

SAFE USE OF INSECTCIDES IN AGRICULTURE
JACKAI, E N L.

INTEGRATED PEST MANAGEMENT FOR PROTECTED VEGETABLE CULTIVATION IN THE NEAR EAST.
LENTEREN, V J C; ALEBEEK F.A.N.

INTRODUCTION TO CROP PROTECTION.
ENNIS, W.B

CONTROL OF INFESTATION BY TROGODERMA GRANARIUM AND PROSTEPHANUS TRUNCATUS TO STORED PRODUCTS.
HAYWARD, L .A .W.

HOW TO CONTROL INSECT PESTS OF COTTON
RUSSELL, D.A; HILLOCKS, R.J.

INTEGRATED PEST MANAGEMENT FOR SWEETPOTATO IN EAST AFRICA.
SMIT, N. E J.

FRIENDS OF THE RICE FARMER
LITSINGER, J.A; SHEPARD, B.M.

INTEGRATED PEST MANAGEMENT A CATALOGUE OF TRAINING AND EXTENSION MATERIALS
ALEBEEK, F.A.N.

FIELD INSECTS PESTS OF RICE IN AFRICA.
UKWUNGWU, M.N.

THE BHOPAL SYNDROME PESTICIDES ENVIRONMENTAL AND HEALTH
DAVID, W.

THE ECOLOGY OF AGRICULTURAL PESTS.
SYMONDSON, W.O.C; LIDDELL, J.E.

PESTS AND DISEASES OF TROPICAL CROPS
HILL, D.S; WALLER, J.M.

CONSERVATION AND USE OF CROP GENETIC DIVERSITY TO CONTROL PESTS AND DISEASES IN SUPPORT OF SUSTAINABLE AGRICULTURE.
UNEP.

INTEGRATED PEST MANAGEMENT AND AFRICAN AGRICULTURE.
KISS, A; MEERMAN, F

TRAINING MANUAL FOR TSETSE CONTROL PERSONNEL
BALDRY, D.A

TSETSE AND TRYPANOSOMOSIS INFORMATION
FAO

PLANT PROTECTION AND QUARANTINE
KAHN, P.R.

INTERNATIONAL CODE OF CONDUCT ON THE DISTRIBUTION AND USE OF PESTICIDES.
DIOF, J.

PEST MANAGEMENT IN STORED GROUNDNUTS
MARTELL, G.P

COLLABORATIVE RESEARCH ON GROUNDNUT ROSETTE VIRUS.
ICRISAT.

PESTICIDE RESIDUES IN FOOD 1997
GRANT, L.D.

PESTICIDE RESIDUES IN FOOD 2012.
LUNN, D; MACLACHLAN, D.

PESTICIDE RESIDUES IN FOOD 1983
JMPR

PESTICIDE RESIDUES IN FOOD 1994
CARIS, M; CHAMBERLAIN, P

FIELD INSECT PESTS OF RICE IN AFRICA.
UGONNA, J.

PESTICIDE RESIDUES IN FOOD 2002 VOLUME 2
PELKONEN, O

CROP PROTECTION HAND BOOK-CEREALS.
PETER, A

PESTICIDE RESIDUES IN FOOD 2004
FAO

BIOLOGICAL CONTROL PROGRAMMES AGAINST INSECTS AND WEEDS IN CANADA.
SIMMONDS, J.F

1st CONFERENCE ON STORED PRODUCT INSECT PESTS.
NAHDY, M.S; AGONA, A

CROP PROTECTION HANDBOOK CEREALS
ATTWOOD, PJ.

INSECTICIDA SALUTI
BASF

GUIDELINES ON STANDARDS FOR AGRICULTURAL PESTICIDE APPLICATION EQUIPMENT AND RELATED TEST PROCEDURES VOL TWO.
SHARP, D.G

POSING A THREAT TO UGANDA FOOD SECURITY; THE BANANA BACTERIA WILT.
TUMUSIMME, R

INSECT SCIENCE EDUCATION IN AFRICA THE ICIPE GRADUATE SCHOOL MODEL.
MENGECH, A.N

INSECT SCIENCE EDUCATION IN AFRICA; THE ICIPE GRADUATE SCHOOL MODEL.
MENGECH, A.N

RICE DISEASES AND INSECTS.
TSUBOI, T

INTEGRATED PEST MANAGEMENT AND AFRICAN AGRICULTURE.
MEERNMAN, F; KISS, A

INTEGRATED PEST MANAGEMENT AND PESTICIDE REGULATION IN DEVELOPING ASIA.
WIEBERS, C.U

INTEGRATED PEST MANAGEMENT AND PESTICIDE REGULATION IN DEVELOPING COUNTRIES.
WIEBERS, U.C

OUTLOOKS ON PEST MANAGEMENT.
NANCY, R; COPPING, G.L

GUIDELINES FOR THE MANAGEMENT OF SMALL QUANTITIES OF UNWANTED AND OBSOLETE PESTICIDES.
FAO

PESTICIDE STORAGE AND STOCK CONTROL MANUAL.
FAO

INTEGRATED PEST MANAGEMENT.
ERNST, V; JURGEN, F

RURAL RADIO RESOURCE PACK.
CTA

INSECT PEST CONTROL.
PARKER, A

A SYSTEMATIC APPROACHES TO TSETSE AND TRYPANOSOMIASIS CONTROL.
CHENEAU, Y

CLONAL ROBUSTA COFFEE HANDBOOK PESTS AND DISEASES.
KUMMER, F

HONEYBEE MITES AND THEIR CONTROL-A SELECTED ANNOTATED BIBLIOGRAPHY.
NICHOLAS, M.S

BREEDING POPLARS FOR DISEASE RESISTANCE.
LANLY J.P

INSECT OF IRAN; THE LIST OF COLEOPTERA IN THE INSECT COLLECTION OF PLANT PEST AND DISEASES RESEARCH INSTITUTE.
HORUMAND, H

AN EVALUATION OF THE IMPACT OF INTEGRATED PEST MANAGEMENT RESEARCH AT INTERNATIONAL AGRICULTURAL RESEARCH CENTRES.
WAIBES, D

TROPICAL DEVELOPMENT AND RESEARCH INSTITUTE; TOWARDS HAZARDS ASSESSMENT;PROPERTIES AND EFFECT OF ENDOSULFAN APPLIED SEQUENTIALLY AS DRIFT SPRAY FOR TSETSE FLY CONTROL.
DOUTHWAITE, R.J

IMPACT OF PESTICIDE USE ON HEALTH IN DEVELOPING COUNTRIES; PROCEEDINGS OF A SYMPOSIUM HELD IN OTTAWA, CANADA,
GOODMAN, T; FORGET, G; VILLIERS, A
Plant Culture

SOILS AND SOIL FERTILITY MANAGEMENT UNIT.
NARL

RICE DISEASES AND INSECTS
TSUBOI, T

PROCESSING TOMATOES.
CTA

GROWING MUSHROOMS UNDER NATURAL
NARL

UTILIZATION OF TROPICAL FOODS; FRUITS AND LEAVES.
FAO

FARMERS MAIZE SEED SYSTEMS IN WESTERN OROMIA
CIMMTY

RETURNS TO RESEARCH AND DIFFUSION INVESTMENTS ON WILT RESISTANCE IN PIGEONPEA.
BANTILAN, P

IMPROVEMENT OF PIGEONPEA IN EASTERN AND SOUTHERN AFRICA ANNUAL RESEARCH PLANNING MEETING 1994.
SILIM, S.N; TUWAFE, S

SEMINAR PROCEEDINGS IMPROVING CITRUS AND BANANA PRODUCTION IN THE CARIBBEAN THROUGH PHYTOSANITATION.
GEORGE, C

PIGEONPEA IMPROVED VARIETIES CAN ENRICH EASTERN AND SOUTHERN AFRICA.
SPAAR

WOMEN IN RICE FARMING.
PANDE, S

A STRATEGY TO DEVELOP AGRICULTURE IN SUB-SAHARAN AFRICA AND A FOCUS FOR THE WORLD BANK.
IITA

DIAGNOSIS OF SOME WILT-LIKE DISORDERS OF CHICKPEA.
ICRISAT

ADAPTATION OF CHICKPEA IN THE WEST ASIA AND NORTH AFRICA REGION.
SAXENA, N.P; VIRMANI, S.M

REPUBLIC OF UGANDA VEGETABLE OIL DEVELOPMENT PROJECT, PHASE 2(VODP2)
YOUNG, D; GHANSAH, B

IMPACT OF CHICKPEA RESEARCH IN GUJARAT.
SHIYAN, R.L; JOSHI, P.K

FOURTH SADC REGIOINAL BEAN WORKSHOP POTCHEFSTROOM, SOUTHAFRICA.
FOURIE, D; LIEBENBERG, A.J

PROCEEDINGS OF THE FIRST MEETING OF THE PAN-AFRICA WORKING GROUP ON BEAN ENTOMOLOGY.
GIGA, D.P; ABATE, T.A

THE BEAN/COWPEA COLLABORATIVE RESEARCH SUPPORT PROGRAM.
MOOY, J.C; COLLINS, F

A STRATEGY TO DEVELOP AGRICULTURE IN SUB-SAHARAN AFRICA AND A FOCUS FOR THE WORLD.
CLEAVER, M.K

CROP LOSS ASSESSMENT AND PEST MANAGEMENT.
TENG, P.S

WORLD DISTRIBUTION OF PIGEONPEA.
MAESEN, D.L.G

THE ANATOMY OF THE PIGEONPEA.
SHELDRAKE, B

UNDER GROUND CROPS.
HORTON, D

CURRENT AND POTENTIAL DEMAND FOR FRESH AND PROCESSED SWEETPOTATO PRODUCTS IN NAIROBI AND KISUMU, KENYA
OMOSA, M

TROPICAL SOY BEAN IMPROVEMENT AND PRODUCTION.
NEUMAIER, N

CHICKPEA DESI VARIETY ICCV 10.
ICRISAT

THE LEGUME POD BORER, MARUCA VITRATA; BIONOMICS AND MANAGEMENT.
BHAGWAT, V.R; SHARMA, H.C

HAND CROSSING OF COWPEA.
MYERS, O.G

ATLAS OF COMMON BEAN PRODUCTION IN AFRICA.
DAVID, J.A; KIRKBY, A

MANAGEMENT OF SOYBEAN DISEASES.
AKEM, N.C

BOTTRYTIS GRAY MOLD OF CHICKPEA.
HAWARE, M.P; GOWDA, C.L.L

UKUZAJI WA SAINA KATIKA AFRIKA MASHARIKI.
ANDHRA,P

GROWING CHICKPEA IN EASTERN AFRICA.
RHEENEN, V.A; OMANGA, P

SOYBEAN DISEASES; BIOLOGY, IDENTIFICATION, CONTROL, AND MANAGEMENT.
AKEM, C.N

ROOT CROPS FOR FOOD SECURITY IN AFRICA.
AKORODA, M.O

INTERNATIONAL SORGHUM AND MILLETS NEWSLETTER.
THAKUR, R.P; DAHLBERG, J.A

TROPICAL FORAGE LEGUMES
SKERMAN, P.J; RIVEROS, F

THE YAM A TROPICAL ROOT CROP.
DEGRAS, L

NETHERLAND CATALOGUE OF POTATO VARATIES 1989.
HOOGEN, V.JJ;WESSELS, G

IRRIGATION OF LANDS.
HAGAN, M.R; HAISE, R.H

THE CONSERVATION AND UTILIZATION OF COMMERCIAL INSECTS.
RAINA,S.K; KIOKO, E.N

ROOT CROPS.
GOODING, G.B; KAY, E.D

ACHIEVING HIGH GROUNDNUT YIELDS.
RENARD, C; JOHANSEN, C

FIRST EASTERN AND SOUTHERN AFRICA REGIONAL LEGUMES (PIGEONPEA) WORKSHOP.
SINGH, L; REDDY, M.V

COWPEA RESEARCH, PRODUCTION AND UTILISATION.
RACHIE, K.O; SINGH, S.R

GLOBAL AGRICULTURAL SCIENCE POLICY FOR THE TWENTY-FIRST CENTURY.
SMITH, V; COXHEAD, I

IMPROVING BEAN YIELDS IN AFRICA GREAT LAKES REGION.
REEVES, J; FERREROSA, R

BIOLOGICAL NITROGEN FIXATION IN COMMON BEANIN RWANDA.
MAYER, A

HARVEST OF RESEARCH
IFAD

THE MARKET FOR FRENCH BEANS IN SELECTED WESTERN EUROPEANS COUNTRIES.
KING, P

AN EVALUATION OF REGIONAL RESEARCH NETWORKS FOR CASSAVA, BEANS , AGROFORESTRY, POTATOES AND SWEET POTATOES.
MORROW, R; MINOR, H

INTERNATIONAL POTATO CENTRE.
MAURICE,S

PROCEEDINGS OF A SEMINARV ON CROP PROTECTION FOR RESOURCE-POOR FARMERS.
GIBSON, WR; SWEETMORE, A

EXTENSION AND FARMER TRAINING CURRICULUM IN ECOLOGICALLY SUSTAINABLE CASSAVA PLANT PROTECTION.
BRAIMA, D.J

SEED POTATO SYSTEMS IN THE PHILIPPINES; A CASE STUDY.
CRISSMAN.C

INNOVATIVE METHODS FOR PROPAGATING POTATOES.
SONNINO, A; SIKKA, L

ENHANCING GRAIN LEGUMES RESEARCH IN ASIA.
RUPELA, O.P

SECOND AFRICAN BEAN YIELD AND ADPTATION NURSERY.
GRIDLEY, H.E; YOUNGQUIST, W

INTERNATIONAL CHICKPEA AND PIGEONPEA NEWSLETTER.
JOYCE, A

REED CANARYGRASS A PRODUCTION GUIDE.
LAWRENCE,T; TINGLE, J.N

IMPACT ASSESSMENT OF SOYBEAN RESEARCH AND THE ENABLING ENVIRONMENT IN ZIMBABWE;1965-2000
MUDHARA, M; MARTELLA, D

BRINGING HOPE TO MARGINAL ENVIRONMENTS CHICKPEA IMPROVEMENT AT ICRISAT.
ICRISAT

THE PIGEONPEA.
BAKER, F.W

FARMERS AND SCIENTISTS FINDING WAYS TO GROW MORE BABA BEANS IN EGYPT AND SUDAN.
ALLEPO, S

COWPEA GENETIC RESOURCES.
MOOL,NQ

ONION NEWSLETTER FOR THE TROPICS.
RAMIREZ, D; RAHIM, M.A

PLANT TISSUE CULTURE METHODS AND APPLICATIONS IN AGRICULTURE.
THORPE, A.T

THE WORLD CHICKPEA AND PIGEONPEA ECONOMIES FACTS, TRENDS, AND OUTLOOK.
SILIM, S.N; JAGDISH, K

GUIDELINES ON THE CONSERVATION OF MEDICINAL PLANTS.
CATHARANTHUS, R; ROSY, P

EFFICIENCY AND SUSTAINABILITY GAINS FROM ADOPTION OF SHORT-DURATION PIGEONPEA IN NONLEGUME-BASED CROPPING SYSTEMS.
BANTILAN, MCS

QUALITY DECLARED SEED SYSTEM.
KOCH, D.J; CAMUS, A

ROOTS TUBERS PLANTAINS AND BANANAS IN HUMAN NUTRITIOIN.
LUBIN, D

CROP LOSS ASSESSMENT AND PEST MANAGEMENT.
TENG, P.S

A STRATEGY TO DEVELOP AGRICULTURE IN SUB-SAHARAN AFRICA AND FOCUS FOR THE WORLD BANK.
CLEAVER, M.K

THE BIOLOGY AND CULTIVATION OF EDIBLE MUSHROOM.
IITA

PROCEEDINGS OF THE FIRST PAN-AFRICAN WORKING GROUP ON BEAN ENTOMOLOGY NAIROBI, KENYA.
AMPOFO, J.O

THE BEAN/COWPEA COLLABORATIVE RESEARCH SUPPORT PROGRAM
CRSP

FOURTH SADC REGIONAL BEAN WORKSHOP POTCHEFSTROOM, SOUTH AFRICA 2-4 OCTOBER 1995.
LIEBENBERG, A.J; FOURIE, D

APPLE PRODUCTION AND MANAGEMENT.
NARO

CASSAVA AS LIVESTOCK FOOD IN AFRICA.
HELLEN, S.K

ADOPTION OF MAIZE PRODUCTION IN CENTRAL TANZANIA.
MATHEW, G; SWART, A

PLANT BREEDING; A LONG-TERM STRATEGY FOR THE CONTROL OF ZINC DEFICIENCY IN VULNERABLE POPULATIONS.
MARIE, T.R

GUIDE TO PLANT PATHOGENIC BACTERIA.
BRADBURY, J.F

SOYBEAN UTILISATION GUIDE.
MATOVU, M; KABAYI, P
.jpg)
THE ROLE OF SEED CERTIFICATION IN THE SEED INDUSTRY.
BECKER, O.R; KRAL, D

SEED PATHOLOGY AND MICROBIOLOGY.
BRUNT, J.A

A PROTOCOL TO DETERMINE SEED STORAGE BEHAVIOUR.
HONG, T.D; ELLIS, R.H

WEED MANAGEMENT FOR DEVELOPING COUNTRIES.
LABRADA, R

PHYSIOLOGICAL PATHOLOGICAL INTERACTIONS AFFECTING SEED DETERIORATION.
WEST, S.H

DIRECTORY PLANT PROTECTION SERVICES IN AFRICA.
DADA, B.F

INTERNATIONAL CODE OF CONDUCT FOR PLANT GERMPLASM COLLECTING AND TRANSFER.
DIOUF, J

PLANT PROTECTION BULLETIN.
LABRADA, R

INTERNATIONAL PLANT PROTECTION CONVENTION.
FAO

INTERNATIONAL PLANT PROTECTION CONVENTION.
FAO

EXPERT CONSULTATION ON WEED ECOLOGY AND MANAGEMENT.
GRAAF,V; ZEHNI, M

ENNIMA NENKOZESA YA MUWOGO
ADUPA, J

EXPERT CONSULTATION ON WEED ECOLOGY AND MANAGEMENT.
KROPFF, M.J; BARUCH, R

TRADITIONAL AFRICAN VEGETABLES.
GUARINO, L

GUIDES TO THE INTERNATIONAL PLANT PROTECTION CONVENTION.
IPPC

AQUACULTURE PRODUCTION STATISTICS.
FAO

GLOBAL RUST FIGHT SWEET POTATOES PROSPER SEEDS OF LIFE LIVING THE DREAM.
FRANCIS, C.M; SHRESTHA, R

PLANT PROTECTION SERVICE OF THE REPUBLIC OF UGANDA QUARANTINE AND INSPECTION SERVICES H.Q KAWANDA.
BAFOKUZARA, N.D

PLANT QUARANTINE IN UGANDA; STRUCTURE AND FUNCTIONS.
BAZIRAKE, C.B

A PROTOCOL TO DETERMINE SEED STORAGE BEHAVIOUR.
LWANGA, M; ENGELS, J.M

CLONAL ROBUSTA COFFEE HANDBOOK.
UCDA

KITABU CHA MAELEZO JUU YA UPANZI NA UTUNZAJI WA MASHAMBA YA VUTA SUKUMA YA KUZUIA BUU NA MAGUGU YA STRIGA KATIKA MAHINDI.
KHAN, Z.R; WADHAMS, L.J

MAINTENANCE SYSTEMS FOR THE DAIRY PLANT.
HALL, H.S

UTILIZATION OF RENEWABLE ENERGY SOURCES AND ENERGY SAVING TECHNOLOGIES BY SMALL SCALE MILK PLANTS AND COLLECTION CENTRES.
RIVA, G

GUIDE TO PARTICIPATORY VARIETAL SELECTION FOR SUBMERGENCE TOLERANT RICE.
MANZANILLA, D; PARIS, T

IMPROVEMENT OF SWEET POTATO IN EAST AFRICA.
JATALA, P;MATARA, B.W

IMPACT; ADOPTION AND IMPACT OF DRY-SEASON DUAL-PURPOSE COWPEA IN THE SEMIARID ZONE OF NIGERIA.
HAIZUMI, H; SANGINGA, P.C

THE QUALITE OF COFFEE FROM PLANTLET TO CUP.
POCHET, P

MAIZE, SORGHUM, FINGER MILLET AND RICE PRODUCTION.
OSIRU, D.S

THE FAO IAEA SPREADSHEET FOR DESIGNING AND OPERATION OF INSECT MASS REARING FACILITIES.
CACERES, C; RENDOM, P

THE NEED OF INTEGRATED PEST CONTROL IN COTTON GROWING.
WADAGENEH, A

BANANA AND PLANTAIN DIRECTORY OF RESEARCHERS 1997.
INIBAP

PLANT CONCEPTS AND PLANT USE; AN ENTHNOBOTANICAL SURVEY SURVEY OF THE SEMI-ARID AND ARID LANDS OF EAST AFRICA.
BEITRAGE, K; BERND, H; INGO, H
Plant Diseases

BIOLOGICAL AND CULTURAL TESTS FOR CONTROL OF PLANT DISEASES.
WAYNE, F.W

PROCEEDINGS OF THE FIRST INTERNATIONAL CONFERENCE ON BANANA AND PLANTAIN FOR AFRICA.
CRAENEN, K; KARAMURA, E.B

COMPENDIUM OF BEAN DISEASES
HALL, R

EVALUATION OF MUSA GERMPLASM FOR RESISTANCE TO SIGATOKA DISEASES AND FUSARIUM WILT.
CTA

SMALL HOLDER DAIRY UNDER THREAT NEW DISEASE AND PEST ON ELEPHANT GRASS IN UGANDA.
NARO

PROTECTING WORLD CROPS.
SCHRADER, MH

GENETIC BASIS OF BIOCHEMICAL MECHANISMS OF PLANT DISEASE.
GROTH, V.J; RUSHNELL, W.R

COMPENDIUM OF ROSE DISEASE.
CYNTHIA, W

SAFETY AND HEALTH IN THE USE OF AGROCHEMICALS; A GUIDE.
SUMMERSCALES, J

COMPENDIUM OF ONION AND GARLIC DISEASES.
KRISHNA, M; SCHWARTZ, H

GENETIC BASIS OF BIOCHEMICAL MECHANISMS OF PLANT DISEASE.
GROTH, J; BUSHNELL, R

BREEDING POPLARS FOR DISEASE RESISTANCE.
LANLY, J.P

MAIZE DISEASES A REFERENCE SOURCE FOR SEED TECHNOLOGISTS.
MCGEE, D.C

MYCOLOGY VALUABLE TITLES THAT AID IN THE IDENTIFICATION OF FUNGI, ASSIST IN DISEASE MANAGEMENT, AND ENHANCE TEACHING.
MATTEWS, F

COMPENDIUM OF PEANUT DISEASES.
PORTER, D.M; DONALD, H

COMPENDIUM OF LETTUCE DISEASES.
MICHEAL, R.D; EDWARD, A.K

TOWARDS THE DEVELOPMENT OF INTEGRATED CULTURAL CONTROL OF TOMATO LATE BLIGHT IN UGANDA..
TUMWINE, J

MAIZE DISEASES; A REFERENCE SOURCE FOR SEED TECHNOLOGISTS.
MCGEE, D.C

TRAINING MANUAL FOR TSETSE CONTROL PERSONNEL VOLUME 3.
POLLOCK, J.N

TRAINING MANUAL FOR TSETSE CONTROL PERSONNEL VOLUME 2
POLLOCK, J.N
Plant Pests

PEST CONTROL IN GROUNDNUTS
FEAKIN, S.

PEST CONTROL IN RICE
FEAKIN, D

MAIZE DISEASES A GUIDE FOR FIELD IDENTIFICATION
CARLOS, D.L

INSECT PESTS OF MAIZE A GUIDE FOR FIELD IDENTIFICATION.
ALEJANDRO, O.C

FRUITS FOR THE FUTURE TAMARINDA.
GUSASENA, HPM; HUGHES,A

PLANT PROTECTION AND QUARANTINE
KAHN, P.R

TSETSE AND TRYPANOSOMOSIS INFORMATION 2013
DARGIE, J.

TSETSE AND TRYPANOSMOSIS INFORMATION 2009
DARGIE, J

AFRICAN PLANT PROTECTION
BLAIR, B.W; GREEFF,B S.W

PROTECTED AGRICULTURE
JENSEN, HM.

AFRICAN PLANT PROTECTION 1999
DIPPENAAR, N.J

THE NATURE OF WILT DISEASES OF PLANTS
BECKMAN C.H

THE NATURE AND PRACTICE OF BIOLOGICAL CONTROL OF PLANT PATHOGENS
BAKER,K F.

TSETSE AND TRYPANOSOMOSIS INFORMATION.
DARGIE, J

PAAT PROGRAMME AGAINST AFRICAN TRYPANOSOMOSIS.
MODIBO, T.

SOURCES OF RESISTANCE TO GROUNDNUT FUNGAL AND BACTERIAL DISEASES.
NIGAM,S.N;SINGH, A.K

GROUNDNUT VIRUS DISEASES IN AFRICA.
REDDY, D.V R;DELFOSSE, P.

TECHNICAL MANUAL ON BLACK SIGATOKA DISEASE OF BANANA AND PLANTAIN.
OWOEYE, T.
PEANUT HEALTH MANAGEMENT.
MELOUK, A H; SHOKES, F M.

WORKING TOGETHER ON GROUNDNUT VIRUS DISEASES
REDDY, D.V.R; MCDONALD, D.M.

DURABILITY OF DISEASE RESISTANCE.
JACOB, TH; PARLEVLIET, J.E.

COMPENDIUM OF PEANUT DISEASES
BACKMAN, PA;BOSWELL, T.E

RISK MANAGEMENT FOR MAIZE FARMERS IN DROUGHT PRONE ARESA OF SOUTHERN AFRICA.
ROHRBACH, D.D.

GROUNDNUT BACTERIAL WILT IN ASIA.
MEHAN, V.K.

BUSSEOLA FUSCA.
HARRIS, K.M; NWANZE K.F.

INSECTICIDA SALUT
ANILQUIMICA, S.A

CEREAL GRAIN MYCOTOXINS FUNGI AND QUALITY IN DRYING AND STORAGE.
CHELKOWSKI, J.

PEST MANAGEMENT AND THE AFRICAN FARMERS
ZETHNER, O.

MYCOSPHAERELLA LEAF SPOT DISEASES OF BANANAS.
JACOME, L.

EARLY AND LATE LEAF SPOTS OF GROUNDNUT.
SUBRAHMANYAM, P M.

COORDINATED RESEARCH ON GROUNDNUT ROSETTE VIRUS DISEASE
MCDONALD, D.M; D.V.R REDDY.

COMPENDIUM OF SOYBEAN DISEASES
SINCLAIR, J.B; BACKMAN P.A

COMPENDIUM OF SOYBEAN DISEASES FOURTH EDITION.
HARTMAN, G.L

INIBAP
HUBERT, Z

COORDINATED RESEARCH ON GROUND
MCDONALD, K.R

COLLABORATIVE RESEARCH ON GROUNDNUT ROSETTE VIRUS.
BREYEL,E.

RECENT STUDIES ON PEANUT BUD NECROSIS DISEASE
PRASAD, MVR.

VIRUSES OF TROPICAL PLANTS.
BRUNT, A.

INSECT PEST OF RICE.
PATHAK M.D; KHAN, Z.R.

GUIDELINES FOR THE SAFE TRANSPORT OF PESTICIDES.
PARTON, W.T

BIOLOGICAL AND CULTURAL TESTS FOR CNTROL OF PLANT DISEASES
WILCOX, F.W.

NATURAL PRODUCTS FOR INNOVATIVE PEST MANAGEMENT.
WHITEHEAD, D.L;BOWERS, W.S

INSECT PHEROMONES AND THEIR USE IN PEST MANAGEMENT.
CARDE, R.T; MINKS, A.K.

BIOLOGICAL AND CULTURAL TESTS FOR CONTROL OF PLANT DISEASES.
WYSONG, S.D

THE NATURE OF WILT DISEASES OF PLANTS
BEKMAN, C.H

PROTECTED AGRICULTURE A GLOBAL REVIEW.
MERLE, H.J

MANAGEMENT OF COFFEE WILT DISEASE EPIDEMIC IN UGANDA.
NARO

WORLD CROP PESTS.
HELLE, W.

COFFEE WILT DISEASE RESEARCH AND DEVELOPMENT IN UGANDA.
NARO

MANAGEMENT OF COFFEE WILT DISEASE EPIDEMIC IN UGANDA ANNUAL WORK PLAN AND BUDGET.
NARO

MANAGEMENT OF COFFEE WILT DISEASE EPIDEMIC IN UGANADA MEDIUM TERM PLAN AND BUDGET.
NARO

INTEGRATED PEST MANAGEMENT
SCHILLHORN, T.W; JOFFE, S.

HANDBOOK FOR THE IDENTIFICATION OF LEAFHOPPERS AND PLANTHOPPERS OF RICE
MICHYEAL, W.

A LITERATURE GUIDE FOR THE IDENTIFICATION OF PLANT PATHOGENIC FUNGI
ROSSMAN, Y; LINDA, J.

PEST OF WEST INDIAN SEA ISLAND COTTON.
INGRAM, W.R.

MAJOR INSECTS PESTS OF MAIZE IN AFRICA.
PEREZ, P.B

A PICTORIAL GUIDE TO THE IDENTIFICATION OF SEEDBORNE FUNGI OF SORGHUM, PEARL MILLET, FINGER MILLET, CHICKPEA, PIGEONPEA, AND GROUNDNUT
AHMED, A

SAFE USE OF INSECTICIDES IN AGRICULTURE
LOUIS E.N

BIOLOGICAL CONTROL OF PLANT PARASITIC NEMATODES
STIRLING, GR.

BANANA AND PLANTAIN EMBRYOGENIC CELL SUSPENSIONS.
DOMERGUE, H.R.

WORLD CROP PESTS
MINKS, A.K.

ECOLOGICAL STUDIES ON OVIPOSITION ON SWARMS OF THE DESERT LOCUST.
POPOV, G.B.

THE ABDOMEN OF THE FEMALE DESERT LOCUST
THOMAS, J.G.

THE DEVELOPMENT OF EGGS OF RED LOCUST AND THE AFRICAN MIGRATORY LOCUST AND ITS INTERRUPTION UNDER PARTICULAR CONDITION OF HUMIDITY.
SHULOV, A.S.

LABORATORY EXPERIMENT ON OVIPOSITION RESPONSES OF THE LOCUST.
NORRIS, M.J.

FIELD OBSERVATIONS ON THE BEHAVIOUR OF HOPPERS OF THE RED LOCUST.
CHAPMAN, R.F.

LABORATORY EXPERIMENTS ON OVIPOSITION RESPONSES OF THE DESERT LOCUST.
NORRIS, J.M

THE VARIABILITY OF AND RESISTANCE TO SWEET POTATO FEATHERY MOTTLE VIRUS IN AFRICA.
KARYEIJA, FR.

INSECT OF IRAN
MIRZAYANS, H.

REVIEW OF THE BIOLOGICAL CONTROL ATTEMPTS AGAINST INSECTS AND WEEDS IN CANADA.
MCLEOD, H.J

OPERATIONAL RESEARCH ON PREVENTIVE CONTROL OF THE RED LOCUST.
LLOYD, H.J.

INTEGRATED PEST MANAGEMENT OF TROPICAL PERENNIAL CROPS.
BETH, M

BIOLOGICAL AND CULTURAL TESTS FOR CONTROL OF PLANT DISEASES VOLUME 6
WAYNE, F.W; NESMITH, W.C

NATURAL CROP PROTECTION
STOLL, G

INTEGRATED PEST MANAGEMET
ODHIAMBO, T; ACCATINO, P

PESTS, DISEASE, AND NUTRITIONAL DISORDERS OF THE COMMON BEAN IN AFRICA.
ALLEN, D.J; AMPOFO, J.K.O

BIOLOGICAL CONTROL OF PLANT PARASITIC NEMATODES
AMPOFO, J.K

ATLAS OF COMMON BEAN PRODUCTION IN AFRICA.
WORTMANN,S.C

ROOTS AND TUBERS FOR THE 21ST CENTURYTRENDS, PROJECTIONS, AND POLICY OPTION.
GREGORY, J.S; ROSEGRANT, W.M

THE AFRICAN BEAN EXCHANGE PATTERNS OF SHARING.
BEEBE, S; KIRKBY, R.

GROWING BEANS IN THE CITY; A CASE STUDY OF KAMPALA, UGANDA.
SONIA, D

SOCIAL IMPACT OF SOYBEAN IN NIGERIA SOUTHERN GUINEA SAVANNA.
SANGINGA, P.C; MANYONG, V.M

A WORLD LIST OF CHICKPEA AND PIGEONPEA PATHOGENS.
NENE, Y.L; SHEILA, V.K

AGROCLIMATOLOGY OF ASIAN GRAIN LEGUMES.
CHATER, S; HALL, S.D

PROCEEDINGS OF THIRD MULTIDISCIPLINARY WORKSHOP ON BEAN RESEARCH IN EASTERN AFRICA.
KIRKBY, R.A

BEAN PRODUCTION PROBLEMS IN THE TROPICS.
CIAT

CROP PROTECTION FOR RESOURCE POOR FARMERS
GIBSON,R.W; SWEETMORE, A.

QUALITY DECLARED SEED SYSTEM.
FAO

SOYBEANS FOR THE TROPICS RESEARCH, PRODUCTION AND UTILIZATION.
SINGH, S.R; RACHIE, K.O

COMBINED COMPENDIUM OF FOOD ADDICTIVE SPECIFICATIONS.
FAO

KENYA SUGAR SECTOR THRIVES DESPITE IMPORTS THREATS.
MUTHEE, M

FEED TECH INTERNATIONAL FEED PRODUCTION AND TECHNOLOGY.
ZIGGERS, D; KOELEMAN, E

PRINCIPLES OF FISH PRODUCTION.
MUTHEE, M

ABRIDGED ENGLISH EDITION.
B.S.I

PRODUCTION, MARKETING AND CONSUMPTION OF POTATOES IN THE ETHIOPIAN HIGHLANDS
BARBARA, A; KANYARUKIGA, S

HYBRID RICE FOR FOOD SECURITY, POVERTY ALLEVIATION, AND ENVIRONMENTAL PROTECTION.
VIRMANI, S.S; HARDY, B

A PARTICIPATORY APPROACH TO DISTRICT FOOD NUTRITION PLANNING.
KAKITAHI, J.T; KALULE, S.

MAIZE IN THE THIRD WORLD.
DOWSELL, R.C; CANTRELL, P.R.

PROCEEDINGS OF THE INTERNATIONAL WORKSHOP ON TRANSGENIC POTATOES FOR THE BENEFIT OF RESOURCE-POOR FARMERS IN DEVELOPING COUNTRIES.
ATKINSON, H.J; CHAKRABARTI, S.K

TRADITIONAL PROCESSING AND UTILIZATION OF CASSAVA IN AFRICA.
HAHN, K.S

DROUGHT-TOLERANT CROPS FOR SOUTHERN AFRICA.
MANTHE, C.S; LEUSCHNER, K

THE CASSAVA BIOTECHNOLOGY NETWORK
THRO, A.M

PLANT PROTECTION AND QUARANTINE VOLUME 3.
KAHN, P.R

PROCEEDINGS OF THE 2ND TRIENNIAL MEETING AND CONFERENCE OF THE AFRICAN POTATO ASSOCIATION.
HUNT, G.L.T; AUTREY, L.J.C

CHICKPEA DISEASES RESISTANCE SCREENING TECHNIQUES
SAXENA, K.B; KUMAR, J

LEGUMES PATHOLOGY (CHICKPEA).
HAWARE, M.P; RAMULU, M

FRUITS AND TROPICAL PRODUCTS.
COMMON WEALTH SECRETARIATE.

DESCRIPTORS FOR CHICKPEA.
ARIETINUM, C.L

FIELD DIAGNOSIS OF CHICKPEA DISEASES AND THEIR CONTROL.
NENE, Y.L; REDDY, M.V.

COPING WITH DROUGHT; STRATEGIES TO IMPROVE GENETIC ADPTATION OF COMMON BEAN TO DROUGHT-PRONE REGIONS OF AFRICA.
LUNANGA, L; MBIKAY, N

TREE PATHOLOGY COOPERATIVE PROGRAMME.
INIBAP

BOTRYTIS GRAY MOLD OF CHICKPEA.
ICRISAT

A COMPARISON OF FOLIAR FUNGICIDES FOR THE CONTROL OF SOYBEAN DISEASES.
RUPE, J.C

CHICKPEA DESI VARIETY ICCV 82108
ICRISAT

INTEGRATED MANAGEMENT OF BOTRYTIS GRAY MOLD OF CHICKPEA.
PANDE, S; NARAYANA, J

SOYBEAN IRRIGATIOIN IN ARKANSAS DIVISION OF AGRICULTURE
SCOTT, H.D

RECENT ADVANCES IN RESEARCH AND MANAGEMENT OF BOTRYTIS GRAY MOLD OF CHICKPEA.
PANDE, S; JOHANSEN, C

A WORLD LIST OF CHICKPEA AND PIGEONPEA PATHOGENS
NENA, Y.L

FAO AT WORK IN UGANDA
FAO

SMILES MAIZE LEGUMES CROPPING SYSTEMS
CTA

CURRENT AND POTENTIAL DEMAND FOR FRESH AND PROCESSED SWEETPOTATO PRODUCTS IN NAIROBI AND KISUMU, KENYA
HEINO, D.K

RICE DISEASES AND INSECTS
NACRRI

ANDEAN ROOT AND TUBER CROPS
CIAT

EVALUATION OF POTATO AND SWEET POTATO GENOTYPES FOR DROUGHT RESISTANCE.
EKANAYAKE, J.I

CTA TECHNICAL MEMOIR NO 1
ROETTGER, J.D

SEED POTATO SYSTEMS IN ECUADOR; A CASE STUDY.
CRISSMAN, C.C

SWEET POTATO AN UNTAPPED FOOD RESOURCE.
WOOLFE, J

NETHERLAND CATALOGUE OF POTATO VARAETIES 1989
HOOGEN, V.JJ; WESSELS, G

MANAGEMET OF SOYBEAN DISEASES.
AKEM, C.M

THE CULTIVATED PLANTS OF THE TROPICS AND SUBTROPICS.
SIGMUND, R; ESPIG, G

SOCIAL IMPACT OF SOYBEAN IN NIGERIA SOUTHERN GUINEA SAVANNA.
IITA

BOTRYTIS GRAY MOLD OF CHICKPEA.
HAWARE, M.P; GOWDA, C.L

SWEETPOTATO SITUATION AND PRIORITY RESEARCH IN WEST ANDCENTRAL AFRICA.
GUTIERREZ, R.D; MARALES, A

TISSUE CULTURE OF IPOMOEA BATATAS; MICROPROPAGATION AND MAINTENANCE.
LIZARRAGA, R; PANTA, A

TRUE POTATO SEED IN THE MIDDLE EAST AND AFRICA.
HARDY, B; MALAGAMBA, P

SUSTAINABLE INTENSIFICATION OF MAIZE LEGUME CROPPING SYSTEMS FOR FOOD SECURITY IN EASTERN AND SOUTHERN AFRICA.
PAKELA, Y; MEKURIA, M

ON-FARM IPM OF CHICKPEA IN NEPAL
PANDE,S; GRZYWACZ, D

HAND CROSSING OF COWPEAS.
MYERS, O.G

OPTIMIZING POTATO PRODUCTIVITY EVALUATING AND UTILIZING RESULTS OF ON-FARM TRIALS.
CORTBAOUI, T.R

POTATO PRODUCTION COURSE.
ZACHMANN, R

LEGUMES PATHOLOGY (PIGEONPEA) REPORT OF WORK.
RAHIM, P

THE AFRICAN BEAN EXCHANGE.
CIAT

EPIDEMIOLOGY AND MANAGEMENT OF BEAN RUST IN ETHIOPIA.
HABTU, A; ZADOKS, J.C

SOYBEAN DEVELOPMENT IN INDIA.
BISALIAH, S

FARMERS SCIENTIST AND PLANT BREEDING
CLEVELAND, D

TTRANCE ELEMENTS IN PLANTS
CORLEY, R.H.V; KIHARA, H

PIGEON IMPROVED VARATIES CAN ENRICH EASTERN AND SOUTHERN AFRICA
ICRISAT

TROPICAL MAIZE IMPROVEMENT AND PRODUCTION.
PALIWAL, L.R; GONZALO, G

PEST CONTROL IN TROPICAL GRAIN LEGUMES.
MERCER, S.L; MOODY, K

PEST CONTEROL IN TROPICAL GRAIN LEGUMES.
MOODY, K.A; AKOBUNDU, A

EDIBLE MUSHROOMS AND THEIR CULTIVATION.
CHANG, T.S; MILES, P.G

TECHNICAL AND INSTITUTIONAL OPTIONS FOR SOGHUM GRAIN MOLD MANAGEMENT.
CHANDRASHEKAR, A; HALL, J.A

CEREALS AND LEGUMES
RAMAKRISHNA, A

WOMEN IN RICE FARMING.
STANFORD, L; UNNEVEHR, L.J

GROWING MUSHROOM S
NARO

UTILIZATION OF TROPICAL FOODS; FRUITS AND LEAVES.
FAO

TROPICAL FORAGE LEGUMES.
FAO

ANDEAN ROOTS AND TUBERS
CTA

PLANT GENETIC RESOURCES FOR FOOD AND AGRICULTURE IN EASTERN AND CENTRAL AFRICA.
TUMUSHABE, G; NALUWAIRO, R

POTATOES PRODUCTION, MARKETING, AND PROGRAMS FOR DEVELOPING COUNTRIES.
BRETH, S

PRODUCTION OF YAMS; PRESENT ROLE AND FUTURE PROSPECTS.
OTTO, J.A; AKORODA, M.O

INNOVATIVE METHODS FOR PROPAGATING POTATOES.
KIDANE, M; JONES, M.C

SPICES
PURSEGLOVE, J.W

BEAN ROOT ROT
RIU

AGRICULTURAL PESTICIDE SPRAYERS VOLUME 1 FAO GUIDELINES ON EQUIPMENT QUALITY CONTROL AND USE AND FAO MINIMUM STANDARDS.
WILES, T.L

FAO PESTICIDE DISPOSAL SERIES. ; COUNTRY GUIDELINES.
FAO

MANAGEMENT OF PROBLEMATIC AQUATIC WEEDS IN AFRICA.
LABRADA, R

INTERNATIONAL STANDARDS FOR PHYTOSANITARY MEASURES; REGULATED NON QUARANTINE PESTS.
JACQUEN, D

GUIDELINES ON MINIMUM REQUIREMENTS FOR AGRICULTURAL PESTICIDE APPLICATION EQUIPMENT.
DOBSON, H

MANUAL ON WEED CONTROL IN NERICA RICE IN UGANDA.
NIYIBIGIRA, E; NGUYEN, N

GUIDE FOR INDUSTRY ON THE IMPLEMENTATION OF THE FAO CODE OF CONDUCT ON THE DISTRIBUTION AND USE OF PESTICIDES.
FAO

OLIVE PESTS AND THEIR CONTROL IN THE NEAR EAST.
KATSOYANOS, P

RISKS AND CONSEQUENCES OF THE MISUSE OF PESTICIDES IN THE TREATMENT OF STORED PRODUCTS.
MARITIME, C

SUNN PESTS AND THEIR CONTROL IN THE NEAR EAST.
MILLER, R.H

A GUIDE TO MIGRANT PEST MANAGEMENT IN AFRICA.
MEINZINGEN, W.F

INTERNATIONAL PEST CONTROL.
MABBET, M

GUIDELINES FOR THE MANAGEMENT OF SMALL QUANTITIES OF UNWANTED AND OBSOLETE PESTICIDES.
JEYARATNAM, J

GATSBY OCCASIONAL PAPER MASTERING MOSAIC; THE FIGHT FOR CASSAVA PRODUCTION IN UGANDA .
OTIM, W; KAZIBWE, W

INTERNATIONAL STANDARDS FOR PHYTOSANITARY MEASURES GUIDELINES FOR PEST ERADICATION PROGRAMMES.
DIOUF, J

INTERNATIONAL STANDARDS FOR PHYTOSANITARY MEASURES PEST REPORTING.
DIOUF, J

WORLD REVIEW OF HIGHLY MIGRATORY SPECIES AND STRADDLING STOCKS.
FAO

FINAL REPORT ON ISOLATION, IDENTIFICATION AND CHARACTERISATION OF PASSION FRUIT WILT DISEASE IN UGANDA.
SEKAYA, C

INFLUENCE OF COW PEA MAIZE MIXTURE ON GENERALISTS PREDATORS AND THEIR EFFECT ON POPULATION DENSITY OF THE LEGUME FLOWER THRIPS.
BALIDDAA, C

THE RED LOCUST STRENGTHENING CONTROL AND OPERATIONAL RESEARCH;AFRICA REGION.
FAO

DESERT LOCUST CONTROL OF ALTERNATIVE INSECTICIDES FOR USE IN LOCUST BAITS
MACCUAIG, D; GEZACHEW, S

THE DESERT LOCUST POCKET BOOK.
GRUNSHAW, .JP

NYMPHS OF THE SAHELIAN GRASSHOPPERS.
POPOV, G.B

BEEKEEPING THEORY AND PRACTICE.
KUGONZA, D.R
Post-Harvest Technology

STUDY WORKSHOP ON POST-HARVEST LOSSES OF CEREAL CROPS IN AFRICA DUE TO PESTS AND DISEASES
Eca

A BIBLIOGRAPHY ON POST-HARVEST LOSSES IN CEREALS AND PULSES WITH PARTICULAR REFERENCE TO TROPICAL AND SUBTROPICAL COUNTRIES
Boxall R.A.

POSTHAVERSTTECHNOLOGIES IMPLICATIONS FOR FOOD POLICY ANALYSIS
Greeley, M

POST-HARVEST CROP PROCESSING: SOME TOOLS FOR AGRICULTURE
Clarke, B

POSTHARVEST TECHNOLOGIES OF ROOT AND TUBER CROPS IN CAMEROON A SURVEY
Numfor, F A; Peter AY

SWEETPOTATO IN SOUTH ASIA; POSTHARVEST HANDLING, STORAGE, PROCCESSING, AND USE.
DAYAL, T.R; KURUP, G.T

MAIZE PRODUCTION AND POST HARVEST HANDLING HANDBOOK.
OPOLOT, O

POST HARVEST MANAGEMENT AND STORAGE OF FOOD LEGUMES.
ODOGOLA, W.R

A COLOUR ATLAS OF POST HARVEST DISEASES AND DISORDERS OF FRUITS AND VEGETABLES VOLUME ; GENERAL INTRODUCTION AND FRUITS.
SNOWDON, L

POST HARVEST PHYSIOLOGY OF PERISHABLE PLANT PRODUCTS.
KAYS, S

A COLOUR ATLAS OF POST HARVEST DISEASES AND DISORDERS OF FRUITS AND VEGETABLES VOLUME 2; VEGETABLES.
SNOWNON, A

A COLOUR OF POST HARVEST DISEASES AND DISORDERS OF FRUITS AND VEGETABLES.
BUTTRESS, F; SNOWDON, L.A

AFRICAN CENTRE FOR TECHNOLOGY STUDIES PROGRAMME STATEMENT.
ACTS

FROM FARMER TO PLANNER AND BACK HARVESTING BEST PRACTICES.
WILDE, V

POST HARVEST MANAGEMENT AND STORAGE OF MAIZE.
HENRIKSSON, R

POST HARVEST MANAGEMENT AND STORAGE OF MAIZE.
HENRIKSSON, R; MUCHIRI, G

HIGH HOPES FOR POST-HARVEST.
CLARKE, B

POST-HARVEST LOSSES IN SMALL SCALE FISHERIES.
AKANDE, G; OUADI, Y.D

APHLIS-POST HARVEST CEREALS LOSSES IN SUB-SAHARAN AFRICA, THEIR ESTIMATION, ASSESSMENT AND REDUCTION.
HODGES,R; REMBOLD, F
QAS

REPORT OF THE SECOND AND THIRD QAS SENSITISATION MEETING IN WESTERN AND COASTAL KENYA.
MACHETI, M

THE ESSENTIAL CD-ROM SERIES FOR MEDICAL STUDENTS, THEIR TEACHERS AND HEALTHCARE PROFESSIONS.
CABI

REPORT OF THE SECOND AND THIRD QAS SENSITISATION MEETING IN WESTERN AND COASTAL KENYA.
MACHETI, M
Reference Section
AGRICULTURAL INFORMATION RESOURCES CENTRES
BOAST, C; JOHSON S J.

THE CONCISE OXFORD DICTIONARY OF CURRENT ENGLISH
FOWLER, F.G

DENIVA NEW 2000
KYOHAIRWE, R

ENCYCLOPEDIA OF THE THIRD WORLD
KURIAN, T G
DIRECTORY OF AGRICULTURAL RESEARCH PROJECTS IN UGANDA
NARO

THE COMMONWEALTH MINISTERS
MACLEISH M.

THE EUROPA YEAR BOOK
ARNEZ, A

ENCYCLOPEDIA OF ENVIRONMENTAL POLLUTION AND CLEANUP
MEYERS, A R

THE EUROPA WORLD YEAR BOOK
DENKO

ENCYCLOPEDIA OF THE THIRD WORLD
KURIAN, G T

DISEASE CONTROL PRIORITIES IN DEVELOPING COUNTRIES
JAMISON, T D

ENCYCLOPEDIA OF THE THIRD WORLD FOURTH EDITION
KURIAN G. T

SCIENTIFIC ENCYCLOPPEDIA
CONSIDINE; D M
THE EUROPA WORLD YEAR BOOK 1992
EUROPA

SCIENTIFIC ENCYCLOPEDIA EIGTH EDITION
CONSIDINE, G M

A GUIDE TO THE PRESS OF THE UNITED KINGDOM AND TO THE PRINCIPLE PUBLICATIONS OF EUROPE, THE AMERICANS, AUSTRALASIA,ASIA AND MIDDLE EAST
CROSSFIELD C; HAYES A
CROP PROTECTION CHEMICALS REFERENCES
WILEY, J

COOPERATIVE ACTIONS FOR PLANT HEALTH
EL SAED M

WORLD WATCH LIST FOR DOMESTIC ANIMALS DIVERSITY
BEATE D. S

AGRICULTURAL RESEARCH IN DEVELOPING COUNTRIES
CARIS

ULRICHS UPDATE SUPLEMENT TO ULRICHS INTERNATIONAL PERIODICALS DIRECTORY
BOWKER R.R

CASUARINA AN ANNOTATED BIBLIOGRAPHY
PINYOPUSARERK K

WHITAKERS BOOKS IN PRINT 1994
MUHAMMAD A.

WHITAKERS BOOK IN PRINT A.C
MUHAMMED A.

AGRICULTURAL RESEARCH IN DEVELOPING COUNTRIES
ABDUL S.

AGRICULTURAL BIBLIOGRAPHIC INFORMATION SOURCES
KEENAN S; WORTLEY P.J

DEVELOPMENT ORIENTED RESEARCH IN AGRICULTURE
HAL. M

AN ANNOTATED BIBLIOGRAPHY OF PIGEONPEA
DAHIYA B.S.

DENIVA NEWS APL JUNE
KAGODA P.

THE COURIER AFRICA .
HORNER S.

BIBILIOGRAPHY ON BEAN RESEARCH IN AFRICA.
BEENA, M.

WHITAKERS BOOKS IN PRINT
BEENA, E

PROFILES OF INSTITUTIONS FOR SCIENTIFIC EXCHANGE AND TRAINING IN THE SOUTH.
VARGAS , J

FINANCING AGRICULTURAL RESEARCH, ASOURCE BOOK
TOBOR, S. T AND JANSSEN, W.

WILLINGS PRESS GUIDE
HAYES, A.

THE COURIER
TOMMY, P.

FINANCING AGRICULTURAL RESEARCH.
TABOR, S.R

THE COURIER AFRICA CARIBBEAN PACIFIC
MEYER, D

INTERNATIONAL PERIODICALS DIRECTORY
POPILSKIS, E.

CASSELL GERMANY DICTIONARY
BETTERIDGE, H

ULRICH UPDATE SUPPLEMENT TO ULRICHS INTERNATIONAL PERIODICALS DIRECTORY
BOWKER R.R

THE 1991 POPULATION AND HOUSING CENSUS
MUWANGA, Z.

AFRICAN CROP SCIENCE JOURNAL 2000
EKWAMU, A.

PROCEEDINGS OF THE 6TH BIENNIAL KARI SCIENTIFIC CONFERENCE
MWANGI, T

AFRICAN CROP SCIENCE JOURNAL 2003
KYAMANYWA, M.

AN ANNOTATED BIBLIOGRAPHY OF PIGEONPEA
NENE, Y.L

AFRICAN CROP SCIENCE JOURNAL
DAMME, V

UGANDA JOURNAL OF AGRICULTURAL SCIENCES
TWONGO , K.

AFRICAN CROP SCIENCE JOURNAL
NTARE, B.R

THE AGRICULTURE DICTIONARY
HERREN , VR

ISNAR AGRICULTURAL RESEARCH INDICATOR SERIES
PARDEY, P.

AFRICAN CROP SCIENCE JOURNAL
ALGALI, M

ULRICH INTERNATIONAL PERIODICALS DIRECTORY
CROUTHERS, M

AGRICULTURAL BIBLIOGRAPHIC INFORMATION SERVICES
KEENAN, S
.jpg)
ANGLO AMERICAN CATALOGUING RULES
GORMAN, M.

JESUS CHRIST MESSAGE TO ALL NATIONS
WARREN, S.J

ELSEVIERS DICTIONARY OF BOTANY
MACURA, P.

DIRECTORY OF TRAINING SPECIALISTS IN AGRIKCULTURAL INFORMATION
NIANG, T.

A DICTIONARY OF GENETICS
KING, C.R
AGRICULTURAL INFORMATION RESOURCE CENTRE
GRAVES, C

DICTIONARY OF AGRICULTURE
HAENSCH, G.

AGRICULTURAL RESEARCH CENTRES
BERRY, MICHEAL J.

WORLD GUIDE TO ABBREVIATIONS OF ORGANIZATIONS
HEANEY, H J.

SEARS LIST OF SUBJECT HEADINGS
MILLER, J.

DICTIONARY OF ENVIRONMENT AND DEVELOPMENT PEOPLE PLACES IDEAS AND ORGINIZATIONS AND CRUMP.
CRUMP, A.

BLACKS AGRICULTURAL DICTIONARY
DALAL, D.B

DEVELOPMENT AID
GREEN, B.

AGRIUCULTURAL
WANYANCHA, J.M; CACKET, K.E.

ANGLO AMERICAN CATALOGUING RULES
GORMAN, M.

CSIR RURAL TECHNOLOGIES
DHIR, M.P

LIBRARIES INFORMATION CENTRES AND DATABASES IN SCIENCE AND TECHNOLOGY
MUNCHEN, KG

UGANDA TRADE DIRECTORY
ALIRO, J M

RICE LAND SPIDERS OF SOUTH AND SOUTHEAST ASIA
BARRION, A T; LITSINGER J A

INTERNATIONAL AGRICULTURAL RESEARCH A DATABASE OF NETWORKS
PLUCKNETT D; NIGEL S.

DIRECTORY OF BRITISH ASSOCIATIONS
UNDERWOOD M,

IMPROVING AGRICULTURAL EXTENSION
BENTZ, P; SOFRANKO, J A.

AGRICULTURAL INFORMATION RESOURCE CENTRES
FISHER, R; BEECHER, J.

DIRECTORY OF TRAINING SPECIALISTS
POSNETT; N W.

AFRICA SOUTH OF THE SAHARA
ROCHESTER , K

AGRICULTURAL INFORMATION RESOURCE CENTRE
FISHER, C R.

SUPPLEMENT TO ULRICH INTERNATIONAL PERIODICALS DIRECTORY
BOWKER, R.R

FINANCING AGRICULTURAL RESEARCH A SOURCE BOOK
TABOR, S T.

AFRICAN CROP SCIENCE JOURNAL 2001
NTARE , B.B

AAFRICAN CROP SCIENCE JOURNAL
RICKERT, H.F

BLACKS AGRICULTURAL DICTIONARY
DALAL, D.B

AFRICAN CROP SCIENCE JOURNAL
MUHAMADOU, E.H
AGRICULTURAL RESEARCH IN DEVELOPING COUNTRIES
AHMAD, M.S

AN BIBLIOGRAPHY OF PIGEONPEA
BENIWAL, J; DAHIYA B.S

ULRICHS UPDATES SUPPLEMENT TO ULRICH INTERNATIONAL PERIDICALS DIRECTORY
BOWKER, R R.

DIRECTORATE OF AGRICULTURAL RESEARCH PROJECTS IN UGANDA
NARO

PROFILE OF INSTITUTIONS FOR SCIENTIFIC EXCHANGE AND TRAINING IN THE SOUTH
NYERERE, K.

A DICTIONARY OF GENETICS
STANSFIELD, D W.

ELSEVIER DICTIONARY OF BOTANY
MACURA, P.

DENIVA NEWS
LUGOLOOBI, J.K

DISEASE CONTROL PRIORITIES IN DEVELOPING COUNTRIES
JAMISON, T.D; MEASHAM A.R.

THE COURIER
JAMISON, D.

ENCYCLOPEDIA OF THE THIRD WORLD
KURIAN, G.T

THE WILEY ENCYCLOPEDIA OF ENVIRONMENTAL POLLUTION AND CLEANUP
MEYES, A R.

JESUS CHRIST MESSAGE TO ALL NATION
JESSON, N C.

WHITAKER BOOKS IN PRINT
HARRISON, M.J.

PLANT PROTECTION IN AFRICA BIBLIOGRAPHY
HARLOW, S.V

WORLD GUIDE TO ABBREVIATIONS OF ORGANIZATIONS
HEANEY, H.J.

DEVELOPMENT AID
BOOTON, H.

CASSELL GERMAN DICTIONARY
BETTERIDGE, H.T

AGRICULTURAL BIBLIOGRAPHIC INFORMATION SOURCES
WORTLEY, P.J; KEENAN, S.

ULRICH INTERNATIONAL PERIODICALS DIRECTORY.
SALK, J.

AFRICAN CROP SCIENCE JOURNAL
ALIYAGEEN, M.

UGANDA JOURNAL OF AGRICULTURAL SCIENCES
NDAWULA, L

WHITAKER BOOK IN PRINT I-N
MILLER, S.

IMPROVING AGRICULTURAL EXTENSION
FAO
Research Institute Reports

Water for Food, Nature and Rural Livelihoods
David Seckler, DG Frank Rijsberman

Managing the Flow of Scientific Information for Agricultural Research in Small Countries: An Issues Paper
Peter Ballantyne

INFORMATION TECHNOLOGY IN AGRICULTURAL RESEARCH (ITAR)
ITAR, ISNAR

SUSTAINABLE AGRICULTURE RESEARCH IN UGANDA
Jovan P. Tibezinda

EXTERNAL PROGRAM AND MANAGEMENT REVIEW OF THE SPECIAL PROGRAM FOR AFRICAN AGRICULTURAL RESEARCH
Francis Idachaba, Ruvimbo Mabeza-Chimedza

CRITICAL ISSUES IN ON-FARM RESEARCH IN UGANDA
J. M. A. Opio and S. Zziwa
.jpg)
FIELD ATTACHMENT /INTERNSHIP AT NATIONAL ADRICULTURAL RESEARCH ORGANIZATION
Tiberindwa Douglas

FISHERIES RESEARCH INSTITUTE
Naro

INSTITUTE OF ARABLE CROPS RESEARCH
Long Ashton, Broom`s Barn

DEVELOPMENT OF HIGH YIELDING MULTIPLE RESISTENT SWEETPOTATO GERMPLASM FOR THE TROPICS
Prof. J. K. Mukiibi
.jpg)
BANANA BASED CROPPING SYSTEMS PROJECT: PHASE II
W. K. Tushemereirwe, E. B. Karamura, I. Kashaija, D. Karamura, D. Rukazambuga
.jpg)
COMPUTER ACQUISITON AND DEVELOPMENT
Institute of Agriculture, Ethiopia

FIRST NATIONAL PLANT GENETIC RESOURCE WORKSHOP: CONSERVATION AND UTILIZATION
Dr. Johnson Nkuuhe, Dr. E. N. Sabiiti, H. Kamau, J. Wasswa

GLOBAL FOOD POLICY REPORT
CGIAR

REPORT OF A NETWORKSHOP ON THE ROLE OF SOCIO-ECONOMISTS AND MICROCOMPUTERS IN FSR
Gaberone Botswana, Mbabane Swaziland

FORMULATIOM OF THE NATIONAL RESEARCH AND DEVELOPMENT ACTION PLAN ON COFFEE WILT DISEASE
Dr. Georgina Hakiza

RRSEARCH PRIORITIES FOR THE MID-NOTHERN AGRO-ECOLOGICAL ZONE
NZARD

NATIONAL AGRICULTURAL RESEACH ORGANIZATION
Kawanda Agricultural Research Institute (KARI)

FACULTY OF FORESTRY AND NATURE CONSERVATION
Segawa Paul, 1997

DEVELOPMENT OF AGRICULTURAL DOCUMENTATION & INFORMATIUON SERVICES
J. Stephen Parker, FAO Consultant

ON FARM BANANA RESEARCH AT KISEKKA BENCH MARK SITE,MASAKA DISTRICT,UGANDA
Nankinga C And Tushemereirwe w

PROCEEDINGS OF A WORHSHOP ON STRENTHENING OF THE UGANDA POLYTECHNIC KYAMBOGO (UPK) INDUSTRY PARTNERSHIP
Dr. Abel J. J. Rwendeire

STUDY OF THE COMPARATIVE ADVANTAGE OF COTTON AND COMPETING CROPS ANNUAL REPORT 1987
ULG

CONSULTATIVE GROUP ON INTERNATIONAL AGRICULTURAL RESEARCH
Ismail Serageldin
.jpg)
AN INTEGRATED INFORMATION PROGRAMME FOR AGRICULTURAL AND RURAL DEVELOPMENT IN EASTERN AFRICA
A. M. Mailu and R. Ng Kee Kwong

RURAL RADIO AND SCIENTIFIC AND TECHNICAL INFORMATION
M. Philippe Jacques Da Matha

INTERIM RESEARCH REPORT BY THE MINISTRY OF AGRICULTURE ON MAIZE, SOYBEAN AND SUNFLOWER FIELD TRIALS
Justus Imanywoha-SO, Peter Mijumbi-RO

PLAN FOR MAIZE RESEARCH AND SEED PRODUCTION IN UGANDA
ERNEST W.SPRAGUE

LIMITATIONS OF THE ENGINEERING PROFESSION IN NATION BUILDING
Uipe

SORGHUM AND MILLETS RESEARCH IN UGANDA
Vincent Makumbi Zake, B. Sc. Agric. J. P. E. Esele, B. Sc. Agric

REPORT FOR WORLD BANK SUPERVISION MISSION
DR.GUY.W.DENTON

LIVESTOCK HEALTH RESEARCH INSTITUTE
Dr. E.K. Twinasiko and Dr. Otim Onapa

FACULTY OF FORESTRY AND NATURE CONSERVATION
Kirumira Stephen Mwiro,Namukwaya Agnes

DEVELOPMENTOF THE HORTICULTURE INDUSTRY
Dr. Nazeeh A. L. Abdul-HADT

INTERNATIONAL IRRIGATION MANAGEMENT INSTITUTE
Kingsley kurukulasuriya

NATIONAL AGRICULTURAL DOCUMENTATION AND INFORMATION IN UGANDA
Smith

Cornell International Institute for Food,Agriculture and Development
CIIFAD

INTERNATIONAL INSTITUTE OF TROPICAL AGRICULTURE AND NATIONAL AGRICULTURAL RESEARCH ORGANIZATION, UGANDA
Namulonge, Uganda
.jpg)
CAB INTERNATIONAL INSITITUTE OF ENTOMOLOGY
KM Harris,Bsc

FACULTY OF FORESTRY AND NATURE CONSERVATION
Muk
.jpg)
COMBINE, COORDINATE AND ENHANCE
Tim Allen, Allen Bean, Peggy Beavers

Management Information systems for Agricultural Research in Asia
ISNAR

FACULTY OF EDUCATION SECOND YEAR INTERNSHIP REPORT
KAGHALHA VIOLINE ESTHER
.jpg)
ARTP AGRICULTURAL RESEARCH SYMPOSIUM REPORT
ARTP
.jpg)
ASSISTANCE TO POVERTY ERADICATION AND SUSTAINABLE LIVELIHOOD THROUGH PRIVATE SECTOR DEEVELOPMENT AND DECENTRALIZED COVERNANCE
Prof. Muhiibi, NARO

PALM OIL IDENTIFICATION MISIION IN UGANDA
San Jose, Costa Rica
.jpg)
COFFEE WILT DISEASE RESEARCH AND DEVELOPMENT IN UGANDA
Naro
.jpg)
BRIDGING INFORMATION GAPS BETWEENFARMERS, POLICY-MAKERS, RESEARCHERS AND DEVELOPMENT AGENTS
Dr. Gesa Wesseler (CTA), Ir. Willemine Brinkman (ETFRN)

MICROCOMPUTERS IN POLICY RESEARCH
Lawrence Haddad, M. Daniel Westbrook, Daniel Driscoll, Ellen Payongayong, Joshua Rozen, Melvyn Weeks
.jpg)
AN ASSESSMENT OF SUNFLOWER PRODUCTION POTENTIAL AND A RESEARCH PLAN FOR UGANDA
ARLO THOMPSON

SUMMARY REPORT ON SYSTEM PRIORITIES FOR CGIAR RESEARCH
Cgi

Managing Scientific Information to Meet the Changing Needs of Agricultural Research in trTrinidad and Tobago
Maritza Hee Houng and Peter Ballantyne

CURRENT AGRICULTURAL RESEARCH PROJECTS
Andrew Spurling And MR. Brian H.

ON-FARM RESEARCH IN THE SEMI-ARID AREAS OF UGANDA
R L Adupa and A R Semana

Integrated Pest Management Collaborative Research Support Program (IPM CRSP)
NARO
.jpg)
A SUMMARY OF RESEARCH ACTIVITIES
MOA

Management of Scientific Information for Agricultural Research in Mauritius
Rosemary Ng Kee Kwong and Peter Ballantyne

Report of Research
CSIRO
.jpg)
NATIONAL AGRICULTURAL RESEARCH LABORATORIES (NARL)
Narl
.jpg)
REPORT ON THE UGANDA NATIONAL "ENHR" WORKSHOP
Naro

REPORT OF THE CHILD LAW REVIEW COMMITTEE
Naro

WORKSHOPS ON AGRICULTURAL RESEARCH MANAGEMENT
John E. Woolston

The Contribution of District Agricultural Extension Services Matching Knowledge Demand and Supply in Smallholder Fish farming in the West Nile Region of Uganda
Kefa Atibuni

UNITED NATIONS DEVELOMENT PROGRAMME REPUBLIC OF UGANDA
prof. L .AUXILIA

NATIONALO ENVIRONMENT MANAGEMENT AUTHORITY (NEMA)
Nema

SEED INDUSTRY RATIONALISATION PROJECT-UGANDA
TA, Team

CASSAVA IN UGANDA
ANTONY BUA AND MASEMBE KAJUBI

COFFEE REHABILITATION PROGRAMME
G.o.U, EEC

REPORT AND RECOMMENDATIONS OF THE HEALTH POLICY REVIEW COMMISSION
Prof. Rapheal Owor

HEADSTART PROGRAMME FOR AGRICULTURAL RESEARCH AND EXTENSION
HARE

THE ROLE AND POSSIBLE RESTRUCTURING OF AGRICULTURAL POLICY COMMITTEE AND AGRICULTURAL SECRETARIAT
mR. p.s. mOULD
FACULTY OF AGRICULTURE AND FORESTRY
Muks

COFEE RESEARCH CENTRE
NARO

NUTITIONAL SECURITY
Ha Thi Cuc

The impact of improved agricultural technologies On the income of farmers of Arua districts
Olowo Raymond

AGRICULTURAL RESEARCH TO FIGHT POVERTY
Byamukama Asaph Ivan(FORRI)

REPORT OF THE FIRST TECHNICIAN WORKSHOP ON STRATEGIES TO IMPROVE ANALYTICAL CAPABILITIES IN NARO LABARATORIES.
Mudome J.M and Okitoi N.D

Agriculural R&D a century After Mendel
Ahmed,R. and Z.karim.

TOWARDS A BETTER INTEGRATION OF LIVESTOCK AND CROPS IN THE TESO FARMING SYSTEM
Anastasia Asongwed Awa, Ezekiel Hamisi Goromela, Herbert Okurut-Akol, Ana Laura Touza

REHABILITATION OF COTTON UNIONS
RICK.D.PIERCE and BENARD F.RUNNEBAUM

AGRICULTURAL RESEARCH AND EXTENSION PROJECT
Fao

A NATIONAL SHELTER STRATEGY FOR UGANDA
Rep o Uganda

HEALTH POLICY REVIEW COMMISSION
PROF.RAPHAEL OWOR

LIBERALISATION AND AMALLHOLDER AGRICULTURAL DEVELOPMENT: A CASE STUDY OF COFFEE FARMS IN KENYA
Andrew Mwihia Karanja

GENDER AND AGRICULTURE IN THE INFORMATION SOCIETY
Helen Hambly Odame

DRAFT REPORT OF THE COMMITTE ON THE ESTABLISHMENT OF A COFFEE RESEARCHCENTER
Naro
.jpg)
REPORT ON THE UGANDA NATIONAL WORKSHOP
Dr Patrick Y and PROF.Rafael owor

PRELIMINARY REPORT ON CASSAVA MULTIPLICATION PROJECT
Nyamutale Charles Asab, Erobot Charles Sudhe

DRAFT PROPOSAL FOR ACABREN EAST AND CENTRAL AFRICA BEAN RESEARCH NETWORK
ASARECA

SIXTEENTH SPAAR PLENARY SESSION
Secritariat, SPAAR

REPUBLIC OF UGANDA ESTABLISHMENT OF A NATIONAL AGRICULTURAL RESEARCH ORGANISATION (NARO)
ISNAR and USAID

ORGANIC AGRICULTURE IN KENYA AND UGANDA
Charles Walaga

DEVELOPING SKILLS TO INFLUENCE ADOPTION OF AGRICULTURAL POLICY ANALYSIS RESULTS
Isaac M. Mbeche and Wills Oluoch

Soil Organic Matter in Uganda and its Relationship to Major Farming System
HENRY SSALI

A FIELD ATTACHMENT REPORT SUBMITTED IN PARTIAL FULFILLMENT FOR THE REWARD OF DEGREE IN LIBRARY AND INFORMATION SCIENCE
KIGENYI YAKUB MUSA

QUARTERLY BULLETIN
Antoinette Paris Greider, Gary Giglioti, Amelie E.M. CHARRON

POLICY GUIDELINES FOR COLLABORATION IN AGRICULTURAL RESEARCH, DEVELOPMENT AND DISSEMINATION
Prof. J.K. Muukiibi

Fertiliser Recommendation System for Uganda
IFDC

THE UGANDA COFFEE DEVELOPMENT AUTHORITY BUDGET AND WORK PLAN FOR COFFEE
Ucda

REPORT ON OPERATIONAL PROGRAMMES
NRI

INDUSTRY USE OF SGRO-RESOURCES AND PRODUCTS
Johannes Ledwaba-Dr. Mlosy

AGRICULTURAL EXTENSION PROGRAMME
Aris

Development and value-Addition to banana Plants in Africa
food,biological and chemical technologies

THE NATIONAL AGRICULTURAL RESEARCH ACT, 2005
Act

EMERGENCY SEED AID IN KENYA: A CASE STUDY OF LESSONS LEARNED
Louise Sperling

ELECTRONIC DELIVERY OF AGRICULTURAL INFORMATION TO THE RURAL COMMUNITIES IN UGANDA
JOYCE ADUPA

INFOTERRA/USA CUSTOM BIBLIOGRAPHY
American Bollworm and Spinny Bollworm

REPORT OF THE MANAGEMENT INFORMATION WORKSHOP AND AFMESA INAUGURAL MEETING
Afmesa

REPORT OF THE SUB-REGIONAL PREPARATORY MEETING FOR EASTERN AFRICA AND INDIAN OCEAN ISLANDS
Fao

Dominica nature Island Grenada,rapid renaissance after destruction.
Sir john kaputin

COFFEE BASED FARMING SYSTEMS BASELINE SURVEY IN UGANDA
D.S Ngambeki, E.N.B Nsubuga, L. Adupa, C. Kitale, E.F. Munyabonera

HIDDEN HARVEST;U.S.BENEFITS FROM INTERNATIONAL RESEARCH AID
Philip G.Pardey And Julian M.Alston

REPORT ON THE LAUNCHING OF QUESTION AND ANSWER SERVICE IN EASTERN AFRICA,UGANDA
Dorothy Barasa

THE DESIGN AND IMPLEMENTATION OF UGANDA`S SOUTHWEST REGION AGRICULTURAL REHABILITATION PROJECT
C.N.K Mujuni

Rethinking the Outlook of Colleges Whose Roots Have Been in Agriculture
James H. Meyer

THE COURIER
Aris

IFPRI REPORT
Ifpri

NATIONAL SEED CERTIFICATION SERVICE
Aris

REPORT ON THE UGANDA NATIONAL HOUSEHOLD BUDGET SURVEY
Undp

REPORT ON UGANDA NATIONAL CENSUS OF AGRICULTURE ANF LIVESTOCK
M,o,a

INTERNATIONAL FOOD POLICY RESEARCH INSTITUTE
JOHN W.MELLOR

INTERNATIONAL FOOD POLICY RESEARCH INSTITUTE
JOHN W.MELLOR

NATIONAL REPORT OF INDONESIA ON THE IMPLEMENTATION OF THE NAIROBI FORWARD-LOOKING STRATEGIES FOR THE ADVANCEMENT OF WOMEN
JAKARTA

ORGANIZATION PERFORMANCE ASSESSMENT
Theresa Sengooba and Dan Kisauzi
SOURCES OF:POSSIBLE ERRORS AND BIASES IN, AGRICULTURAL STATISTICS IN UGANDA
E.S.K MUWANGA-ZAKE

NATIONAL AGRICULTURAL RESEARCH STRATEGY AND PLAN
Uganda Working Group 9A
THE EFFECT OF TECHNOLOGY DISSEMINATION ON ADOPTION
Ssemwanga Research

HEALTH POLICY REVIEW COMMISSION
PROF.Raphael Owor

OPERATION PERFORMANCE ASSESSMENT
THERESA SENGOOBA

STUDY OF AGRICULTURAL INFORMATION NEEDS OF THE COUNTRIES OF WEST AFRICA ;GHANA,NIGERIA,SIERA LEONE
DR EDWARD DANDESON SPIFF

PEDALING OUT OF POVERTY: SOCIAL IMPACT OF A MANUAL IRRIGATION TECHNOLOGY IN SOUTH ASIA
Tushaar Shah, M. Alam, M. Dinesh Kumar and Mahendra Singh
.jpg)
FARMING SYSTEMS SUPPORT PROGRAMME
Naro
NATIONAL STRATEGY FOR UGANDA
Z.M. Nyiira
.jpg)
NATIONAL AGRICULTURAL RESEARCH ORGANIZATION (NARO)
Naro

INTERNATIONAL FOOD POLICY RESEARCH INSTITUTE
Manfred Zeller and Manohar Sharma

COFFEE BASED FARMING SYSTEMS BASELINE SURVEY IN UGANDA
D.S. Ngambeki, Nsubuga, L. Adupa, C. Kitale and E.F. Munyabonera

REPORT OF THE SIXTH EXTERNAL REVIEW OF THE BIOVERSITY INTERNATIONAL
Richard Flavell, Tania Ammour, Richard Hannan, Jean-Yves Maillat

REPORT OF THE SIXTH EXTERNAL PROGRAM AND MANAGEMENT REVIEW (EPMR) OF THE INTERNATIONAL CROPS RESEARCH INSTITUTE FOR THE SEMI-ARID TROPICS
Kenneth G. Cassman, Antonio J. Hall, Eric Danquah, Maureen K. Robinson

REPORT OF THE FIRST EXTERNAL REVIEW OF THE WATER AND FOOD CHALLENGE PROGRAM
Asit Biswas, Markus Palenberg, Jeff Bennet

DRAFT REPORT ON FORMULATION OF THE NATIONAL RESEARCH ACTION PLAN ON COFFEE W
ADIPALA EKWAMU

REPORT OF THE FIRST EXTERNAL REVIEW OF THE SYSTEMWIDE PROGRAM ON PARTICIPATORY RESEARCH AND GENDER ANALYSIS (PRGA)
Thomas S. WALKER, Eva M. Rathgeber, Baldev Singh Dhillon

REPORT OF THE FIRST EXTERNAL REVIEW OF THE HARVESTPLUS CHALLENGE PRGRAM
Richardo Uauy, Markus Palenberg, Abdul Hamid Zakri

REPORT OF THE SECOND EXTERNAL PROGRAM AND MANAGEMENT REVIEW (EPMR) OF THE INTERNATIONAL LIVESTOCK RESEARCH INSTITUTE (ILRI)
Lindsay Falvery, Johan van Arendonk, Pierre-Charles Lefevre, Pervaiz Rashid, Maureen K,. Robinson, George Sempeho

REPORT OF THE SIXTH EXTERNAL PROGRAM AND MANAGEMENT REVIEW (EPMR) OF THE INTERNATIONAL POTATO CENTER
Edgardo Moscardi, Malachy Akoroda, Jay Gopal, Donald McKerron, Julie Noolan, Carlos Pomareda

ACTION PLAN FOR AGRICULTURAL POLICY AGENDA
MAAIF

THE COURIER
Koos Richelle

CONTACT
Jean Louis Sarbib

FIRST INTERNAL TRIENNIAL REVIEW GROUP REPORT
nadic

CAPABILITY STATEMENT
TERRA CONSULTING LIMITED

Ted W. Wamusi, T.F. Nsubuga Kaggwa

Program automated library and information systems
AINSLEY C.LEWIS

THE PROJECT FOR IMROVEMENT OF AGRICULTURAL EXTENSION AND TRAINING ISTITUTE
Nippon Koei Co.

THIRTEENTH SEMI-ANUAL PROGRESS REPORT
IDEA

TASK GROUP REPORT ON RESEARCH AND DEVELOPMENT
Aris

IMPACTS OF INTERNATIONAL WHEAT BREEDING RESEARCH IN THE DEVELOPING WORLD
Derek Byerlee and Piedad Moya

PRODUCTIVE R&D SCIENTIFIC TECHNICAL AND MANAGEMENT INFORMATION SYSTEMS
ICIPE
.jpg)
ESTABLISHMENT OF A GIS FACILITY AND NATIONAL SOILS REFERENCE DATABASE
NSANZE IGNATIOUS

INTERNATIONAL INSTITUTE OF ENTOMOLOGY 80TH TEAR
Sir Guy Marshall

SOURCES OF INCOME INEQUALITY AND POVERTY IN RURAL PAKISTAN
Richard H. Adams, Jr., Jane J. He

STRATEGIC PLAN FOR CEREALS IN KENYA
C.G. Ndiritu
STRATEGIC HEALTH RESEARCH PLAN
Who

AFRICAN INSITITUTE FOR CAPACITY DEVELOPMENT
AICAD

SUMMARY OF WARDA/NARS TASKFORCES ACTIVITES
Yoboue N`guessan

INTERNATIONAL FOOD POLICY RESEARCH INSTITUTE
Samar R. Sen

INTERNATIONAL FOOD POLICY RESEARCH INSTITUTE
Samar R. Sen

REPORT
Ifpri

MAKING A DIFFERENCE TO POLICIES AND PROGRAMMES
Robert W. Porter, Suzanne Prysor-Jones

UGAFLOR `96
IDEA

COMMONWEALTH INSTITUTE OF BIOLOGICAL CONTROL
F.J. Simmonds, Gordon Street

DISCUSSION PAPER FOR ECAPAPA STAKEHOLDER MEETING
ABAKA

CONTROL OF WATER HYACINTH INFESTATIONS AT FISH LANDING SITES IN UGANDA
DR JAMES A OGWANG

AGRICULTURE SECTOR PROGRAMME SUPPORT
DR WILLIE ODWONG

First National Plant Genetic resources Workshop Conservation and Utilisation
DR E.N SABITI

THE DRAFT NATIONAL SOILS POLICY FOR UGANDA
NEMA

DEVELOPMENT PLAN FOR KALENGYERE AGRICULTURAL RESEARCH STATION
CALVIN MARTIN

East and Central African AFRENA
D. HOEKSTRA

AN ANNOTATED LIST OF ARTHROPODS ASSOCIATED WITH STORED FOOD PRODUCTS IN ZAMBIA
Tropical P
.jpg)
REPORT ON THE UGANDA NATIONAL ENHR WORKSHOP 18TH-20TH FEBRUARY, 1991
UMST

REPORT OF THE FIFTH EXTERNAL PROGRAMME AND MANAGEMENT REVIEW OF THE CENTRO INTERNACIONAL DE AGRICULTURA TROPICAL.
HAUTEA, A.R; FORTMANN, L

REPORT OF THE REGIONAL WORKSHOP ON THE ELABORATION OF NATIONAL PLANS OF ACTION TO PREVENT, DETER AND ELIMINATE ILLEGAL, UNREPORTED AND UNREGULATED FISHING-CERTAIN COUNTRIES OF THE NEAR EAST REGION.
FAO

REPORT OF THE FOURTH EXTERNAL PROGRAM AND MANAGEMENT REVIEW OF THE INTERNATIONAL FOOD POLICY RESEARCH INSTITUTE
GARDNER, B; LOUIS, P

REPORT OF THE MEETIN FOR THE RE-ESTABLISHMENT OF THE GFCM COMMITTEE ON AQUACULTURE VNETWORK ON ENVIRONMENT AND AQUACULTURE IN THE MEDITERRANEAN.
FAO

REPORT OF THE FOURTH EXTERNAL PROGRAM AND MANAGEMENT REVIEW OF THE INTERNATIONAL FOOD POLICY RESEARCH INSTITUTE.
ZHANG, L; CARDER, B.G

REPORT OF THE SECOND JOINT FAO/WHO CONFERENCE ON FOOD ADDITIVES.
CLAUSE, A; KERTESZ, Z.I

REPORT OF THE INTERNAL REVIEW OF THE SADC/ICRAF RESEARCH PROJECT.
KARACHI, M

BASIN LEVEL USE AND PRODUCTIVITY OF WATER; EXAMPLES FROM SOUTH ASIA.
MOLDEN, D; ZAIGHAN, H

REPORT OF THE INTERNAL AND INTERPROGRAMME REVIEW OF THE IRA/ICRAF RESEARCH PROJECT IN THE HUMID LOWLANDS OF CAMEROON.
BAHIRU, D

CENTRE FOR OVERSEAS PEST RESEARCH ICRISAT COLLABORATIVE PROJECT ON THE STEM BORER.
BERNAYS, E.A

HIGHER EDUCATION AND RESEARCH IN UGANDA.
ODONGO, J.M

A FIELD SURVEY ON ICRAF RESEARCH/ MTP NURSERIES, THEIR PRESENT STATUS AND POTENTIAL REGARDING IMPROVEMENT OF QUALITY AND QUANTITY.
JAENICLE, H

ON FARM RESEARCH PROJECT, MASENO, KENYA; PAPERS PRESENTED TO THE ZONAL CONFERENCE OF THE EASTERN AND CENTRAL AFRICA AFRENA.
OKOTH, S

AFRENA BURUNDI PROJECT PROGRESS REPORT FOR THE PERIOD OCTOBER 1991 TO SEPTEMBER 1992.
AKYEAMPONG, E; GAHUNGU, A

16TH CABI REVIEW CONFERENCE 21 OCTOBER, ROYAL GARDEN HOTEL, LONDON.
TREVOR, N

PARTNERS IN RESEARCH DEVELOPMENT SPECIAL REPORT.
WARREN, P; BRAD, C

FARMER PARTICIPATORY DIAGNOSTIC RESEARCH .
OKORIO, J; GUINAND, Y

WFP REPORT OF THE THIRTY FIFTH SESSION OF THE COMMITTEE ON FOOD AID POLICIES AND PROGRAMME
THEAUVETTE, M

REPORT ON PROPOSED AGRICULTURAL SETTLEMENT IN KARAMOJA REGION OF UGANDA.
WARMSWORTH, J

THE REPORT OF THE SELECT COMMITTEE ON CUSTODIAN BOARD AFFAIRS.
LUBEGA, D; WASWA, N

HIGHLIGHTS OF BANANA RESEARCH ACTIVITIES IN UGANDA.
NARO

THE INTER UNIVERSITY COUNCIL FOR EAST AFRICA ROLLING STRATEGIC PLAN 2011-2016.
NKUNYA, M

MAKERERE INSTITUTE OF SOCIAL RESEARCH AND PUBLICATIONS 1968-69.
FRANCIS, J

EFFECTS OF AGRICULTURAL COMMERCIALIZATION ON LAND TENURE, HOUSEHOLD RESOURCE ALLOCATION, AND NUTRITION IN THE PHILIPPINES.
HADDAD, J.L; BOUIS, H

AGRICULTURAL RESEARCH IN NEPAL; RESOURCE ALLOCATION, STRUCTURE AND INCENTIVES.
YADAW, R.P

ICRISAT RESEARCH HIGHLIGHTS 1985.
SWINDALE, L.D

AGRICULTURAL AND ECONOMIC GROWTH IN ARGENTINA, 1913-84.
MUNDLAK, Y; CAVALLO, D

WEATHER AND GRAIN YIELDS IN THE SOVIET UNION.
PADMA, D

POPULATION POLICY AND INDIVIDUAL CHOICE; A THEORETICAL INVESTIGATION.
NERRLOVE, M; EFRAIM, S

THE PILOT FOOD PRICE SUBSIDY SCHEME IN THE PHILIPPINES; ITS IMPACT ON INCOME, FOOD CONSUMPTION, AND NUTRITIONAL STATUS.
GARCIA, M; ANDERSEN, P.P

THE EFFECT OF TRADE AND EXCHANGE RATE POLICIES ON AGRICULTURAL IN ZAIRE.
TSHIBAKA, B.T

HORTICULTURAL EXPORTS OF DEVELOPING COUNTRIES; PAST PERFORMANCES, FUTURE PROSPECTS, AND POLICY ISSUES.
ISLAM, N

AGRICULTURE IN THE GATT; ANALYSIS OF ALTERNATIVE APPROACHES TO REFORM.
ZIETZ, J; VALDES, A
.jpg)
IRRIGATION TECHNOLOGY AND COMMERCIALIZATION OF RICE IN THE GAMBIA; EFFECTS ON INCOME AND NUTRITION.
BRAUN, J.V; WEBB, P

THE FOOD STAMP SCHEME IN SRI LANKA, AND OPTIONS FOR MODIFICATION.
EDIRISINGHE, N

NONTRADITIONAL EXPORT CROPS IN GUATEMALA; EFFECTS ON PRODUCTION, INCOME AND NUTRITION.
BRAUN, J; HOTCHKISS, D

CREDIT ALLEVIATION OF RURAL POVERTY; THE GRAMEEN BANK IN BANGLADESH.
HOSSAIN, M

CEREAL FEED USE IN THE THIRD WORLD; PAST TRENDS AND PROJECTIONS TO 2000
SARMA, J.S

REPORT OF THE FOURTH EXTERNAL PROGRAMME AND MANAGEMENT
SERAGELDIN, I

REPORT OF THE SECOND EXTERNAL AND MANAGEMENT REVIEW OF THE INTERNATIONAL WATER MANAGEMENT INSTITUTE.
BEEK, J.K; MERREY, D

THE FOOD STAMP SCHEME IN SRI LANKA; COSTS, BENEFITS, AND OPTIONS FOR MODIFICATION.
EDIRISINGHE, N

NONTRADITIONAL EXPORT CROPS IN GUATEMALA; EFFECTS ON PRODUCTION, INCOME, AND NUTRITION.
BRAUN, J.V; HOTCHKISS, D

MAKERERE INSTITUTE OF SOCIAL RESEARCH; RESEARCH AND PUBLICATIONS 1968-69.
JOHN,F

TRAINING CONSULTANCY RESEARCH REGIONAL MANAGEMENT DEVELOPMENT PROGRAMMES.
ENGELL, O
Reserve

A BETTER WORLD IN 2020
JONATHAN, H

GUIDE TO DLO-NL 1994
LANGEVELD, J W M

GUIDELINES ON ORGANIZATION OF SCHEMES FOR TESTING AND CERTIFICATION OF AGRICULTURAL PESTICIDE SPRAYERS IN USE
WILES, T L

ARCHIVES OF RAZI INSTITUTE
TAVASSOLY A

ENVIRONMENTAL ASPECTS OF AGRICULTURAL DEVELOPMENT
JOSHI, P K

CARBOHYDRATE AND LIGNIN CONTENTS OF PLANT MATERIALS USED IN ANIMAL FEEDING
KNUD, E B

PRELIMINARY LIST OF DELEGATES
YUSUF

THE KNOWLEDGE ECONOMY
MARY, M

PULP AND PAPER CAPACITIES
MARTIN, H

DEPARTMENT FOR THE ENVIRONMENT, NATURAL RESOURCES AND FOOD
HANS, P

UGANDA AND THE EUROPEAN UNION

AGRICULTURAL RESEARCH AND EXTENSION NETWORK
JOYCE

REGIONAL POSTGRADUATE PROGRAMME IN AGRICULTURAL INFORMATION AND COMMUNICATION MANAGEMENT

TUKKIE
Calie, P

THE RURAL EXTENSION BULLETTIN
ADRIAN, A

GUIDELINES FOR PROJECT FOR PMA COMPLIANCE AND CLEARANCE FOR FUNDING
PHILIP

KIT ABSTRACTS TRAINING MANUAL
Kit

ENVIRONMENTAL ASPECTS OF AGRICULTURAL DEVELOPMENT
PETER, O

BEES FOR DEVELOPMENT JOURNAL

IFS MEDIUM TERM STRATEGIC PLAN 2002-2004
STOCKHOLM

NEW DEVELOPMENTS IN FARM MACHINERY
OBONGO, N

FLOWER TECHNOLOGY
Helen, A

MONITORING POVERTY AND GENDER EQUALITY
Bernard, B

IFS MEDIUM TERM STRATEGIC PLAN 2002-2004
ANNA, N

ENVIRONMENT, NATURAL RESOURCES AND FOOD

GENEFLOW
Emile, F

TOWARDS SUSTAINABLE AGRICULTURE: THE CASE OF UGANDA
Roest, C

PANACEA FOR KENYA`S SUGAR INDUSTRY
Otieno, A O

AGROPOLIS INTERNATIONAL COMPLEX FOR RESEARCH AND HIGHER EDUCATION IN AGRICULTURE
MICHEAL

AGRICULTURAL REVIEW
WILIMA, W

PULP AND PAPER
RAIMUNDO

WOMEN PICKING UP THE PIECES
NKUUHE

GUIDELINES FOR PROJECT PROGGRAMME SUBMISSION FOR PMA COMPLIANCE AND CLEARANCE FOR FUNDING
ARTHUR

ACCOMPLISHMENTS OF PARTICIPATORY RESEARCH FOR SYSTEMS IMPROVEMENT IN IGANGA DISTRICT, UGANDA 1993 TO 1997
WORTMANN, C S

COME ON FARMERS
VOICE OF TESO RADIO

U.S FOREGN POLICY
ALLEN, S

SOUTHLAND A CASE STUDY BASED TRAINING EXERCISE IN POLICY ANALYSIS FOR THE AGRICULTURAL AND RURAL SECTOR
SANTIAGO, F

UGANDA JOURNALS OF AGRICULTURAL SCIENCE
SHEILLA, K

UGANDA JOURNAL OF AGRICULTURAL SCIENCES
OLABORA, G

CONSULTATIVE GROUP ON INTERNATIONAL AGRICULTURAL RESEARCH
TAC

ENVIRONMENTAL AND SOCIAL STANDARDS CERTIFICATION AND LABELLING FOR CASH CROPS
CORA, D

KNOWLEDGE SHARING AND INNOVATION IN THE AFRICA REGION
CALLISTO

THE CGIAR IN AFRICA PAST PRESENT AQND FUTURE
VERNON, W R

MONTHLY PROGRESS REPORT
NIPPON, K

PARENTAL VERSUS PEER CONFORMITY AMONG ADOLESCENTS IN SECONDARY SCHOOLS IN KISUMU DISTRICT
MARY O

GARDEN DRIP IRRIGATION KITS
BOSCO

EXPLORE ON FARM
KUENEMAN, E A

THE ROLE OF THE BROADBED MAKER PLOUGH IN ETHIOPIAN FARMING SYSTEMS
RUTHERFORD, A S

WINDS OF CHANGE
CARNINO

AGRICULTURAL REVIEW;NATIONAL IRRIGATION BOARD.
JULIAH, BN K

SCIENCE,TECHNOLOGY AND SKILLS
PHILIP, P; JENIPHER, J

DEVELOPING AND IMPROVING IRRIGATION AND DRAINAGE SYSTEMS
MOIGNE, G; SHAWKI

PUBLIC ACCOUNTS COMMITEE ON THE ACCOUNTS OF THE UGANDA GOVERNMENT
ZAKE, K

REVISED SALARIES AND CONDITIONS OF SERVICE FOR UGANDA PUBLIC SERVICE ,PARASTATAL BODIES AND GOVERNMENT CONTROLLED COMPANIES
SERWANJA, S L

BOOMORBUST; HOW COMMODITY PRICE VOLATILITY IMPEDES POVERTY REDUCTION
ALICE, R

MORE AND BETTER IRRIGATION
MICHAEL, H

INTERNALLY COMMISSIONED EXTERNAL REVIEW OF THE FINANCE AND ADMINISTRATION DIVISION
ROSE, M

EVALUATION OF AGROFORESTRY POTENTIAL IN SLOPING AREAS
ANTHONY, Y

AGRI OUTREACH
GEOFREY

LIEBERT UPSTATION GX
EMERSON

SYMBOLIZING THE NEW AGRICULTURAL CENTURY
DEBOROH

IDRC PUBLICATION CATALOGUE
MAUREEN, O

ICAR INTERNATIONAL TRAINING PROGRAMMES
MISHRA ADG RK MITTAL, J P

GENERAL TECHNICAL ASSISTANCE SERVICES DIVISION
BARBADOS

STRATEGY FOR THE IMPLEMENTATION OF THE EASTERN AFRICA PLANT GENETIC RESOURCES NETWORK PHASE ONE
HENRY, K; ABEBE, D

IDRC PUBLICATION CATALOGUE
ESKA

SITE SPECIFIC GRASSES AND HERBS SEED PRODUCTION AND USE FOR RESTORATION OF MOUNTAIN ENVIRONMENT
BERNHARD, K

CONVERGING STRATEGIES BY FARMERS AND SCIENTISTS TO IMPROVE SOIL FERTILITY AND ENHANCE CROP PRODUCTION
ALIOU, S

THE DIAGNOSIS AND DESIGN APPROACH TO AGROFORESTRY PROJECT PLANNING AND IMPLEMENTATION EXAMPLES FROM KENYA
SCHERR, SJ

LAND AND WATER THE RIGHTS INTERFACE
HODGSON, SW

HIRE SERVICVES BY FARMERS FOR FARMERS
BRIAN, S; ALEXANDRA

SPORE; MODERNISING FARMS PATHS TO SUCCESS
MICHEAL, H

ADDING VALUE TO CROPS
ISSABELLA

I-NETWORKS DECADE OF ICT KNOWLEDGE SHARING
NAKKAZI, E

TRADE AND SUSTAINABLE FOREST MANAGEMENT
PERLIS, A

COFO 2005 DIALOGUE INTO ACTION
VAHANEN, T
.jpg)
BOUQUET MAKING IN COLOMBIA
MARTA, P

COMMERCIAL CULTIVATION OF ALOE VERA
RICHARD, O

AGRICULTURAL REVIEW; NATIONAL IRRIGATION BOARD
MARTIN, M

DELIVERING SCIENTIFIC RESULTS FOR AGRICULTURAL DEVELPOMENT
FREDENBURG, P

PARLIAMENTARY DEBATES
RWOTHNGA

TECHNOLOGY DEVELOPMENT AND TRANSFER NATION-WIDE SURVEY
OJACOR, F.A; PADDE, P

UGANDA JOURNAL OF AGRICULTURAL SCIENCES
SAMUEL, M

TRADE POLICIES AND POVERTY IN UGANDA ; A CGE ANALYSIS
MILTON, A

FLOWER TRIALS NEW COLOURS INSPIRING IDEAS
ADUPA, J

THE NEWSLETTER OF THE AGRICULTURAL INFORMATION FOR DEVELOPMENT OF EASTEREN AFRICA
MTAKWA, P

TRADE POLICIES AND POVERTY IN UGANDA
MILTON, A

TRADE POLICIES AND POVERTY IN UGANDA;A CGE ANALYSIS
MILTON, A

AGRIDEA NEWS
PAULINE, M
.jpg)
IFPRI FORUM; THE HONG KONG TRADE TALKS
MUHAMMED, M

FIRST CONGRESS OF ALBANIAN COUNCIL
REFKI, Z

SCIENCE COUNCIL BRIEF;SUMMARY REPORT ON SYSTEM PRIORITIES FOR CGIAR RESEARCH
JOHN DR

ICT UPDATES; WEATHER DATA FOR AGRICULTURE
CHRIS, A

REFLECTIONS ON THE SEPARATION
HEGEL, G

ICT UPDATE; RURAL ICT POLICY
EDMUND, K
WATER INFILTRATION TO COUNTER DEHYDRATION
MASABA, S

WORKSHOP ON ORGANIC AGRICULTURE FOOD SECURITY AND POVERTY ERADICATION
EUNICE, M

REPORT ON THE DEVOLUTION OF THE BUWAMA AND NABWERU MULTIPURPOSE COMMUNITY TELECENTRES IN UGANDA
HILDA, M

INTEGRATING TRADITIONAL KNOWLEDGE INTO MAINSTREAM NATIONAL AND INTERNATIONAL TRADE
TUMUSIIME, M

UNDERSTANDING HOW RESOURCES ARE ALLOCATED WITHIN HOUSEHOLDS
LAWRENCE, H

THE UGANDA MUSEUM
BRAGG, D

OCCASIONAL PAPERS
CHILVERS, R

MOUNTAIN RESEARCH AND DEVELOPMENT
THEODORE, W

ASSESSING THE POTENTIAL FOR SPURRING AGRICULTURAL INPUTS DEMAND AMONG SMALL HOLDERS IN UGANDA THROUGH INSTITUTIONAL INNOVATIONS
SSERUNKUUMA, D

PATTERNS OF FARMER TREE GROWING IN EASTERN AFRICA; A SOCIOECONOMIC ANALYSIS
KATHERINE, W

ADVANCING HUMAN NUTRITION WITHOUT DEGRADING LAND RESOURCES THROUGH MODELING CROPPING SYSTEMS IN ETHIOPIA HIGHLANDS
BELACHEW, T T

AGRI -OUTREACH
GEOFFREY

FARMERS AND THE ENVIRONMENT
CONRAD

FEEDING PIGS IN THE TROPICS
RENA, P

JOINT FAO/WHO FOOD STANDARDS PROGRAMME CODEX ALIMENTARIUS COMMISSION
HOFAN, J

REPORT ON THE RAPID RURAL APPRAISAL FOR THE KIBALE FOREST
EMMANUEL, N

POLICY RESEARCH ON AFRICAN AGRICULTURE ;TRENDS GAP AND CHALLENGES
STEVEN; W O

INTERNATIONAL BOARD FOR PLANT GENETIC RESOURCES
PHILIP, E

PUBLICATION CATALOGUE
ANDY, S

POSITIONING THE CGIAR IN THE RESEARCH FOR DEVELOPMENT
ALSTON J.M

CATALOGUE 1999
RUCKEBUSH, R

PUBLIC CATALOGUE
MAUREEN, O N

NEW PUBLICATIONS 1995-1996
THOMAS, E

TECHNOLOGY DEVELOPMENT AND TRANSFER NATION WIDE SURVEY
OJACOR, F.A; PADDE, P

PROFITABLE MANGO PRODUCTION
WALIMA, W

CONDITIONS FOR EMPLOYMENT FOR GOVERNMENT UNESTABLISHED EMPLOYEES
JIMM

SOURCES OF INCOME INEQUALITY AND POVERTY IN RURAL PAKISTAN
JANE J HE

ROLE OF FARM-LEVEL DIVERSIFICATION IN THE ADPTION OF MODERN TECHNOLOGY IN BRAZIL
MARC, N; STEPHEN, V

COFO 2005 DIALOGUE INTO ACTION
ELIOT, M

ADVANCING HUMAN NUTRITION WITHOUT DEGARADING LAND RESOURCES THROUGH MODELLING CROPPING SYSTEM IN ETHIOPIAN HIGHLANDS
AMEDE T. A

THE SERVICE OF FARMERS AND THE ENVIRONMENT
HELLEN, V H

FEEDING OUR REGION IN THE 21ST CENTURY
ALBERT, B M

PMA CIVIL SOCIETY PARTNERSHIP PRINCIPLE
JOHN

UGANDA INVESTMENT AUTHORITY
KAREMENTE K

DEFENDING THE FUTURE
JULIAN, L

GIS FOR AFRICA ESRI BRINGS INTERNATIONAL COMMUNITIES TOGETHER
VICTOR, M

AGRIDEA NEWS
MTAKWA.

THE DEFINITIVE INTERACTIVE ENCYCLOPAEDIA
STEVENS, J

PRODUCTION RESPONSE OF UGANDA KEY AGRICULTURAL COMMODITIES TO TRADE LIBERALIZATION
MUGISA, E

GETTING DOWN TO BUSINESS
MICHEAL, R

MARKET CONNECTIONS
DEMBSEY, J

DATA REVOLUTION FOR AGRICULTURE
MARTIN, P

POPULATION REFERENCE BUEREAU
LEY N M

THE CUSTOMERS NEXT DOOR
GUILLAUME, A

THE NEW AGE OF AGRICULTURAL DEVELOPMENT IN AFRICA
SHARON, S

GLOBAL PLAN OF ACTION FOR THE CONSERVATION SUSTAINABLE USE AND DEVELOPMENT OF FOREST GENETIC RESOURCES
JOSE, G

HEALTH AND WEALTH FROM MEDICINAL AROMATIC PLANTS
ELAINE, M

VALUE FROM VILAGE PROCESSING
PETER, F

BLUE ECONOMY IN CRISIS
MICHEAL, H

ACCESS TO MARKETS PERSPECTIVE
HUIZING, A

THE RETAIL REVOLUTION
MARCO A

TRADITIONAL FERMENTED FOOD AND BEVERAGES FOR IMPROVED LIVIHOODS
MEJJA, D

PUBLICATIONS CATALOGUE
ONEIL, M

NORTHERN COMMUNICATIONS
MAINI, A N

ERRATA
KAHERU, Z

DIRECTOR OF AUDIT ON THE ACCOUNTS OF THE UGANDA PROTECTORATE
WILKINSON, H.D

PARTNERS IN RESEARCH FOR DEVELOPMENT
BRAIDOTT, G

KNOWLEDGE IS TRANSFORMATION FOOD PROSPERITY RESILENCE COMPETITIVENESS
HAILU, M

ICT INNOVATION AND THE PEOPLE BEHIND IT
QUAK, E J

POLITICS TALKING RURAL ISSUES THROUGH
GANGYI, W

UPDATE RENT AWARENESS BULLETIN FOR ACP AGRICULTURE
SPEER, A M

VIRTUAL FERTILIZER RESEARCH CENTRE
MCALISTER, V

INFECTION AND IMMUNITY;BOOKS FROM CAB INTERNATIONAL
SCHAT, K

HIGHLIGHTS OF ROCKEFELLER FOUNDATION SUPPORT TO UGANDA
EKWAMU, A

PROJECT FINANCE IN DEVELOPING COUNTRIES
AHMED, P A

ECAPAPA STAKEHOLDERS DIRECTORY
MINDE, I J

CATALOG OF PUBLICATIONS
CLAASE, R

PRIVATE LAND GMO TRIAL KEEP OFF
NIJMEGEN, T

CUTTING COSTS THROUGH SMART PRODUCTION
WAMBEGA, P

FSCU FOOD SCIENCE AND CROP UTILISATION
ANDREW, K

REVISED SALARIES AND CONDITIONS OF SERVICE FOR THE UGANDA CIVIL SERVICE
OTTO, A S

YOUR QUESTIONS ANSWERED
SWAIBU

RURAL FINANCE FOR FOOD SECURITY
ZELLER, M

THE CHALLENGES OF GLOBALIZATION
WOLFENSOHN, J D

NATIONAL INSURANCE CORPORATION
SEMPA, E M

PUBLICATIONS CATALOGUE
ONEIL

FOOD OR FUEL
THIEME, L

ACCOUNTING INSTRUCTIONS
WILLIAMS, E.W

HIGHLIGHTS OF ROCKEFELLER FOUNDATION SUPPORT TO UGANDA
ADIPALA E

UNRIVED AGRICULTURAL RESEARCH EXCELLENCE
ZAWEDDE, B

NUTRITION SECURITY HIDDEN HUNGER IS NOT INEVITABLE
HAILU M

FAO UGANDA INFORMATION BULLETIN
NANDELENGA, R

LESS AGGLOMERATION WITH CENTRIFUGAL SIFTING
ZIGGERS, D

FIGHTING AFRICAS DEADLY FLY NEW ECOFRIENDLY SOLUTIONS FOR TSETSE MANAGEMENT
SAINI, RK

FINANCING SUSTAINABLE FOREST MANAGEMENT
HALLADAY, P

REHABILITATION AND DEVELOPMENT
BOSCO, A.

COMMUNITY INFORMATION NEEDS AND COMMUNICATION CAPACITIES OF ORGANISATIONS IN AGRICULTURE AND DROUGHT MITIGATION
LAWSON

UGANDA BIOSCIENCES INFORMATION CENTRE INTERNSHIP EXPERIENCE
BARBARA, M

KNOWLEDGE MANAGEMENT AND COMMUNICATION STRATEGY
JOSEPH

SCIENTIST OF THE CGIAR
ROBERT

SCIENCE FOR AGRICULTURAL DEVELOPMENT CHANGING CONTEXTS NEW OPPORTUNITIES
ANDERSEN, P; ACHARYA, SS

OECD FAO AGRICULTURAL OUTLOOK 2019
GURRIA, A

A COMMUNICATION FRAME WORK FOR CLIMATE CHANGE ADAPTATION AND FOOD SECURITY
PIERO

SURVEY OF ACTIVITIES
VINK, N H

ICT UPDATES A CURRENT AWARENESS BULLETIN FOR ACP
SPEER, M

ENERGY OF HOPE
HAILU, M

DIMITRA NEWSLETTER
NAJROS, E

PLANT PATHOLOGY AND GLOBAL FOOD SECURITY
MATT

NEWS AND VIEWS
PINTRUP, A

THE RETAIL REVOLUTION
MICHEAL H

AN UPDATE ON THE WORK AND PROGRESS OF IFDC
SCOTT, M; CLYDE, B

AT A GLANCE EUROPEAN UNION AND UGANDA
MARYLINE, DD

FOOD POLICY RESEARCH IN A TIME
POPHAM, D

GOLDSTAR INSURANCE COMPANY LIMITTED
THARANI, A

TOWARDS THE ECONOMIC SOVEREIGNTY OF THE EASTERN AFRICA FARMER
KIRIRO, P.M

THE SECRET OF NERICA
MOHAPATRA, S

KNOWLEDGE FOR LIFE
AKIR, M

THE GATSBY CHARITABLE FOUNDATION
HOWARTH, C W

PRODUCTION RESPONSE OF UGANDA KEY AGRICULTURAL COMMODITIES TO TRADE LIBERALIZATION
HUSSEIN, F

MEETING OF MINDS 2 DEVELOPING A STRATEGY FOR THE CGIAR IN SUB SAHARAN AFRICA
HAGMAANN, J

POLICY GUIDELINES FOR COLLABORATION IN AGRICULTURAL RESEARCH
NARO

SPORE NEW FRONTIERS NEW ERA
SECK, M

EMERGING NATIONS PLAY THE AGRICULTURAL CARD
BRYNAERT, N; MUASYA, C

IMPACT OF TRADE POLICIES AND BROKERAGE INSTITUTION ON THE PROFITABILITY OF UGANDA GRAIN MARKETING
IMELDA

PRODUCTION RESPONSE OF UGANDA KEY AGRICULTURAL COMMODITIES TO TRADE LIBERALIZATION
SSEMWOGERERE. G

DECISION SUPPORT SYSTEMS OPEN AND BIG DATA
LEGROSCOLLARD, A

THE MAGAZINE FOR AGRICULTURAL AND RURAL DEVELOPMENT IN ACP COUNTRIES
ISOLINO, B

ENVIRONMENTAL ACCOUNTING OF NATIONAL ECONOMIC SYSTEMS
COHEN, M J; GEMMA, S

ROODEPLAAT GRASSSLAND INSTITUTE
NOAH

ICT UPDATES COOPERATIVES
NAMUHISA, A

KNOWLEDGE IS TRANSFORMATION FOOD PROSPERITY RESILENCE COMPETITIVENESS
BHEENICK, K

THE NEXT GENERATION NEW FRONTIERS
AZEVEDO, J

DEALING WITH THE ISSUES OF OUR TIMES
LAWANI, S M

SPORE GOING WILD FOR NEW OPPORTUNITIES
STEPHERED S

SPORE FINDING THE RIGHT PATH
MASSARENTI, J

HUNGER AND POVERTY ENVIRONMENT SUSTAINABILITY ECONOMIC GROWTH
ALLEY R

KNOWLEDGE IS TRANSFORMATION FOOD PROSPERITY RESILIENCE COMPETITIVENESS
SOLOMON, L A

ACCESS TO FERTILISERS FINDING THE RIGHT PATH
FEDERISI, S

GUIDELINES ON ORGANIZATION OF SCHEMES FOR TESTING AND CERTIFICATION OF AGRICULTURAL PESTICIDE SPRAYERS IN USE
VANS, J.W

FOURTH REGIONAL GROUNDNUTS WORKSHOP FOR SOUTHERN AFRICA
ABRAHAM, JJ

AGRICULTURAL REVIEW PROFITABLE MANGO PRODUCTION
ARAP, K

TERRESTRIAL CARBON OBSERVATION
CIHLAR, J; OLSON, R

MICROFINANCE AND POVERTY REDUCTION
SUSAN, J; ROGALY, B

POLICY RESEARCH ON AFRICAN AGRICULTURE
OMAMO, S W

FAMILY DYNAMICS AND EDUCATION IN AN URBAN SETTING;
ZOUNGRANA, C M

THE CASE OF UGANDA
ROEST COR

ASIAN SURVEY
ARSHAD F.M

MOUNTAIN RESEARCH AND DEVELOPMENT
BOISSAU S

ANNUAL REVIEW
DEKKER J.A

NEW DEVELOPMENT IN FARM MACHINERY
NYACHAE O

DECENTRALISED AND ENDOGENOUS COMMUNITY DEVELOPMENT
RHODAS R

AGRICULTURAL GROWTH AND WORLD DEVELOPMENTS
Mundlak Y

MAKERERE UNIVERSITY RESEARCH JOURNAL
CONSOLATA K

PANACEA FOR KENYA SUGAR INDUSTRY
MUTHEE M

REVIEW OF BASIC FOOD POLICIES
SARRIS A

LIBERALIZATION OF THE DOMESTIC MARKETS.
FUNGOH PO

SHARING THE LOAD IN CHINA
BELLOTI

THE COURIER
GOUTIER, H.

EIGHTH MEETING OF THE EAST AND SOUTHERN AFRICAN SUB COMMITTEE FOR SOIL CORRELATION AND LAND EVALUATION
FAO

LIVESTOCK SYSTEM RESEARCH PROGRAMMES NATIONAL AGRICULTURAL RESEARCH ORGANISATION UGANDA
Ministry of Foreign Affairs

THE TASK GROUP ON AGRICULTURAL EXTENSION STRATEGIC FRAMEWORK
The Task Force

THE CONSTITUTION OF THE REPUBLIC OF UGANDA
Ministry of Constitutional Affairs

THE HUMAN FACE OF THE URBAN ENVIRONMENT
Serageldin , Ismail ; Cohen , Michael A

THE FUTURE OF INFORMATION ACTIVITIES IN THE CGIAR A SYSTEM WIDE STRATEGY
Lenton , Roberto

POLICY AND BEST PRACTICE DOCUENT
Hilhorst , Thea ; Toulmin , Camilla

INVESTING IN BIOLOGICAL DIVERSITY US RESEARCH AND CONSERVATION EFFORTS IN DEVELOPING COUNTRIES
Abramovitz , Janet N

POPULATION GROWTH , POVERTY , AND ENVIRONMENTAL STRESS FRONTIER MIGRATION IN THE PHILIPPINES AND COSTA RICA
Cruz , Maria Concepcion ; Meyer ,Carrie A ; Repetto , Robert ; Woodward , Richard

AGRICULTURAL RESEARCH PRIORITY SETTING
Mills , Bradrord

PRIORITIZING AGRICULTURAL RESEARCH FOR DEVELOPMENT EXPERIENCES AND LESSONS
Raitzer , David A ; Norton , George W

LAND AND LIFE AGRICULTURE IN AFRICAN RURAL COMMUNITIES
Dupriez , Hugues ; Leener, Philippe De

AGRICULTURE IN THE YEAR 2000 THE CASE OF THE ACP COUNTRIES
Risopoulos , S

REPORT TO THE PAKISTAN AGRICULTURAL RESEARCH COUNCIL ON SELECTED ASPECTS OF THE PAKISTAN AGRICULTURAL RESEARCH SYSTEM
International Service For National Agricultural research

GUIDELINES FOR STRENGTHENING NATIONAL AGRICULTURAL RESEARCH SYSTEM IN SUB SAHARAN AFRICA
ISNAR

CITRUS FRUIT FRESH AND PROCESSED ANNUAL STATISTICS
FAO

UNEP /IPCS TRAINING MODULE NO.3 CHEMICAL RISK ASSESSMENT , HUMAN RISK ASSESSMENT, ENVIRONMENTAL RISK ASSESSMENT AND ECOLOGICAL RISK ASSESSMENT
WHO

PLANNING AND PRIORITY SETTING FOR REGIONAL RESEARCH
Jassen , Willem ; Kissi , Ali

MOUNTAINS OF THE WORLD CHALLENGES FOR THE 21ST CENTURY
Mountains Agenda

ALLEY FARMING IN THE HUMID AND SUBHUMID TROPICS
Kang , B T ; Reynolds , L

REFORMING AGRICULTURAL RESEARCH ORGANIZATION
Nielson , David

INVOLUNTARY RESETTLEMENT IN DEVELOPMENT PROJECTS POLICY GUIDELINES IN WORLD BANK FINANCED PROJECTS
Cernea , Michael M
.jpg)
RURAL DEVELOPMENT SERIES AGRICULTURAL EXTENSION
Albrecht , Hartmut ; Bergmann , Herbert

THE GREENING OF AID SUSTAINABLE LIVELIHOODS IN PRACTICE
Conroy , Czech ; Litvinoff ,Miles

LABORATORY ASSESSMENT OF THE INHERIT SUSCEPTIBILITIES OF25 VARIETIES OF MALAWI MAIZE TO POST-HARVEST INFESTATION BY SITOPHILUS ZEAMAIS MOSTSCH
Dobie , P

AFRICAN DEVELOPMENT INDICATORS 2000
WORLD BANK

A BETTER WORLD IN 2020
NARO

AGRIFORUM
NARO

AGRICULTURE IN THE TROPICS
WEBSTER, C.C

AFRICAN MINISTERIAL CONFERENCE ON THE ENVIRONMENT 9TH ORDINARY SESSION.
UNEP

SOUTH AFRICA CGIAR PARTNERSHIP IN ACTION
NUWAGABA, D

IDA MID TERM REVIEW
KIZITO, J

PROCUREMENT NEWS
OMODING, I

THE COURIER
GOUTIER, H

PARTNERS IN RESEARCH FOR DEVELOPMENT.
HARISON, S

PROCEEDINGS OF A WORKING GROUP MEETING CIAT AFRICAN WORKSHOP SERIES NO.21
WORTMAN, C.S; RANSOM, J.K

NEGOTIATING THE WATERS.
WALSUM, V.E

RISK ASSESSMENTS OF SALMONELLA IN EGGS AND BROILER CHICKENS.
KUNKEL, D

ADVANCES IN PULSES RESEARCH IN BANGLADESH.
SAHNI, B.B; GUGLANI, G.K

THE SAHELIAN TREE LOCUST
POPOV, G; RATCLIFFE, M

INTENSIFYING ACTION AGAINST HIV/AIDS IN AFRICA RESPONDING TO A DEVELOPMENT CRISIS.
MADAVO, C

A RIGHT TO FOOD.
BOERMA, H.A

SYSTEM FOR SOIL AND WATER ANALYSIS.
HACH

WOMEN AND CHANGING HEALTH SEEKING PATTERNS IN UGANDA; THE IMPACT OF STRUCTURAL ADJUSTMENT PROGRAMMES IN KABALE DISTRICT.
KANYESIGYE, J

A GUIDE FOR FISH FARMERS.
NARO

TEACH YOUR BEST A HANDBOOK FOR UNIVERSITY LECTURES.
BARBARA, M; MWANGI, A

RECONSTRUCTING BABYLON WOMEN AND TECHNOLOGY.
HYNES, P.H

AGRI-OUTREACH.
SALANGE, G

KNOWING YOUR RISKS AND HOW TO MANAGE THEM.
NYAGAH, N.J

FAIDHERBIA ALBIDA TECHNICAL CENTRE FOR AGRICULTURAL AND RURAL COOPERATION.
WOOD, P.J

VERTISOL MANAGEMENT IN AFRICA.
ELLIOT, C.R

VETIVER GRASS; TECHNICAL INFORMATION PACKAGE VOLUME 1
GRIMSHAW, D

RECORD OF THE SECOND MTP GRU INTERNATIONAL ADVISORY COMMITTEE MEETING.
MPT
IPGRI IN SUB SAHARAN AFRICA.
AKYEAMPONG, E

KAMPALA BIOTECH CONFERENCE.
MAKARA, A

RAT CONTROL IN AND AROUND THE HOUSE.
AKOL, H.O

UNDERSTAND RESEARCH INFORM,
CLARKE, K

CHINA AFRICA A NEWS MONTHLY COVERING CHINA AND AFRICA.
SHUFU, L

PARTNERS IN RESEARCH FOR DEVELOPMENT.
CAMPBELL, A; MARCHBANK, M

BRIQUETTES AS A HOUSEHOLD FUEL.
WALUBENGO, D

WORKERS DIRECTORY.
ADUPA, J; LUBEGA, J

STAFF LIST AS AT 1ST JULY 1965.
MUDUKU, G.S; OMADI, O.K

AZOLLA AND ITS MULTIPLE USES WITH EMPHASIS ON AFRICA.
HOVE, V.C

TOWARDS A COMMON REGIONAL POLICY, REGULATORY AND BIOSAFETY FRAMEWORK ON GENETICALLY MODIFIED ORGANISMS IN EAST AFRICA.
SENGOOBA, T; ZAWEDDE, B

HEARING PROBLEMS IN CHILDREN
SEMATIMBA, K

CAPE VERDE A HUB CONNECTING THREE WORLDS.
KAPUTIN, J; MANSERVISI, S

WORLD RELIGIONS PLEDGE CONCRETE ACTION ON CLIMATE CHANGE.
KRISTOF, N

ICT AND WOMENS EMPOWERMENT.
OKELLO, D

CIRDAFRICA NEWSLETTER.
MAMDOUH, A; GOMBE, A.A

THE STORY OF A DEVELOPMENT PROJECT AMONG PEASANTS IN ZACAPA AND CHIQUIMULA.
SULTAN, A

WAGENINGEN UPDATE 2009.
MONTENARIE, M

MISSION IMPOSSIBLE
TABU, L

THE INTER UNIVERSITY COUNCIL FOR EAST AFRICA.
SALLY, K

CONGRESS HIGHLIGHTS.
SIRENGO, R

THE EXECUTIVE COUNCIL OF CABI PAPERS FOR THE 386TH MEETING.
MCNAMARA, C

AGRI OUTREACH
MARENGA, M

COUNTRY GUIDELINES.
FAO

THE CUSTOMS MANAGEMENT ORDINANCE.
JOHNSTON, W

GLOSSARY OF PHYTOSANITARY TERMS.
FAO

DISCOVERY AND INNOVATION CUMULATIVE INDEX FOR VOLUME.
KWAJE, S.L

AGROPOLIS.
MATHERON, G

THE ULTRA POOR NEGLECTED RESOURCE, FUTURE POTENTIAL.
RICHTER, S

CAUSES AND EFFECTS OF THE 1980 FAMINE IN KARAMOJA.
OKUDI, B

INTELLECTUAL PROPERTY, PARTNERSHIPS AND THE LUBILOSA STORY.
DENT, D

CABI IN REVIEW
ROMANO, K

VOICES OF EXTENSION WORKERS
NAKATO, J

THE COURIER REPORT HAITI DAWN OF HOPE.
GOUTER, H

DIMITRA NEWSLETTER RURAL WOMEN, GENDER AND DEVELOPMENT.
OKELLO, D

HOUSEHOLD STOVES IN KENYA; THE CASE OF THE KENYA CERAMIC JIKO.
KAREKEZI, S

RURAL 21 THE GLOBAL CRISIS.
RICHTER, S

AUSTRALIAN BREEDERS GOING NATIVE.
REINDERS, U

WAGENINGEN UPDATE FOOD PRODUCTION IN 2050.
PEULEN, V; BEINTEMA, N

AGRI OUTREACH
CHIKONZO, M.M

GETTING STARTED IN ELECTRONIC JOURNAL PUBLISHING.
SALLY, M

THE CGIAR IN AFRICA; PAST, PRESENT AND FUTURE.
RUKUNI, E

WINDOW VISTA HOME PREMIUM.
SANYU, M

RESEARCHING A NEW CLIMATE.

PROOF IN PRINT INFORMATION EMPOWERS.
OCHENGE, R

OUR PLANE KICK THE HABIT.
LEAN, G

FOOD PROCESSING AFRICA,
LIZZ, H

PMT PERFORMANCE MANAGEMENT TRAINING INC.
ISLINGTON, T

UGANDA SCIENTISTS ADVANCE IN AGRO RESEARCH.
KIGGUNDU, A

WORLDWIDE REGULATIONS FOR MYCOTOXINS 1995.
HOCKING, A; EGMOND, H.P

BOVINE SPONGIFORM ENCEPHALOPATHY.
KIMBERLIN, H.R

THE BIRTH OF IGADD.
HASSAN, H

THE BIRTH OF IGGAD.
GOULED, H

SUPPLY MANAGEMENT THE INTERNATIONAL MAGAZINE FOR SUPPLY CHAIN PROFESSIONAL.
ELLINOR, R

THE DETERMINANTS OF WOMEN LOW SCHOOLING RATES IN CAMEROON; A CASE STUDY OF YAOUNDE.
TIMNOU, J; FOTSO, P; PAULINE, P

CODEX ALIMENTARIUS COMMISION PROCEDURAL MANUAL FOURTEENTH EDITION.
FAO

LEARNING FROM THE FIELD INNOVATING CHINA HIGHER EDUCATION SYSTEM.
VERNOOY, R; NAILING, Z

THE JEWELS OF ICRISAT
WILLIAM, D

LAND AND LIFE WAYS OF WATER RUN OFF IRRIGATION AND DRAINAGE.
HUGUES, D; LEENER, P

THE COURIER THE MAGAZINE OF AFRICA-CARRIBBEAN PACIFIC AND EUROPEAN UNION COOPERATION AND RELATIONS.
KAPUTTIN, J; GOUTIER, H

FROM THE GROUND; IMPACTS OF A POOR COMMUNITY DRIVEN DEVELOPMENT PROJECT IN NIGERIA.
KATO, E; NKONYA, E

CGIAR RESEARCH PRIORITIES FOR MARGINAL LANDS.
WINKELMANN, D

MOUNTAINS AND THE LAW EMERGING TRENDS,
VILLENEUVE, A; MEKOUAR, M.A

SUMMARY OF PROCEEDINGS AND DECISIONS; INTERNATIONAL CENTERS WEEK.
LINDSAY, N.I; KIRWOK, J; MATABWA, C.J

VALCENT PRODUCTS; GROWINGSOLUTIONS.
GRAHAME, D; BRADFORD, C

CHOICE BETWEEN FAMILY SIZE AND CHILD SCHOOLING; THE KENYAN CASE.
GICHUHI,L

LITERACY AND POWER; THE LATIN AMERICAN BATTLEGROUND.
ARCHER, D; COSTELLO, P

WHEN THE BOUGH BREAKS OUR CHILDREN, OUR ENVIRONMENT.
THOMAS,L; TIMBERLAKE, L

TOP GUNS AND TOXIC WHALES;THE ENVIRONMENT AND GLOBAL SECURITY
PRINS, G; ROBBIE, S

TIGERS AND BUTTERFLIES SELECTED WRITINGS ON POLITICS, CULTURE AND SOCIETY.
SUYIN, H

DAM THE RIVERS DAMN THE PEOPLE; DEVELOPMENT AND RESISTANCE IN AMAZONIAN BRAZIL
CUMMINGS, B.J

FEEDING TOMORROW,S WORLD.
VIRATELLE, G; WEBER, E.J

THE COLONIZER AND THE COLONIZED.
HOWARD, G

A NEW ERA OF TRANSFORMATION IN GHANA; LESSONS FROM THE PAST AND SCENARIOS FOR THE FUTURE.
CLEMENS, B; XINSHEN, D; HASAN, R

WATER THE INTERNATIONAL CRISIS.
ROBIN, C
Soil Conservation

MANAGEMENT OF BIOLOGICAL NITROGEN FIXATION FOR THE DEVELOPMENT OF MORE PRODUCTIVE AND SUSTAINABLE AGRICULTURAL SYSTEMS.
Ladha, J.K; Peoples, M.B

A REVIEW OF SOIL AND WATER MANAGEMENT RESEARCH IN SERMI- ARID AREAS OF SOUTHERN AND EASTERN AFRICA
Morse, K
.jpg)
AGRO- ECOLOGICAL LAND RESOURCES ASSESSMENT FOR AGRICULTURAL DEVELOPMENT PLANNING : A CASE STUDY OF KENYA RESOURCES DATA BASE AND PRODUCTIVITY
Kassam, A H; Velthuizen, H T V; Fischer, G W; Shah, M M

AGRO-ECOLOGICAL ZONES PROJECT
Dudal, R

AGRO-ECOLOGICAL LAND RESOURCES ASSESSMENT FOR AGRICULTURAL DEVELOPMENT PLANNING: A CASE STUDY OF KENYA RESOURCES DATA BASE AND LAND PRODUCTIVITY TECHINICAL ANNEX 6
Kassam, A H; Velthuizen, H T V; Fischer, G W; Shah, M M

AGRO-ECOLOGICAL LAND RESOURCES ASSESSMENT FOR AGRICULTURAL DEVELOPMENT PLANNING : A CASE STUDY OF KENYA RESOURCES DATA BASE AND PRODUCTIVITY TECHNICAL ANNEX 8
Fischer, G W; Shah, M M; Kassam, A H; Velthuizen

AGRO-ECOLOGICAL LAND RESOURCES ASSESSMENT FOR AGRICULTURAL DEVELOPMENT PLANNING : A CASE STUDY OF KENYA RESOURCES DATA BASE AND LAND PRODUCTIVITY MAIN REPORT
Kassam, A H; Velthuizen, H T V; Fischer, G W; Shah, M M

AGRO-ECOLOGICAL LAND RESOURCES ASSESSMENT FOR AGRICULTURAL DEVELOPMENT PLANNING : A CASE STUDY OF KENYA RESOURCES DATA BASE AND LAND PRODUCTIVITY TECHINICAL ANNEX 1
Kassam, A H; Velthuizen, H T V; Fischer, G W; Shah, M M

AGRO-ECOLOGICAL LAND VRESOURCES ASSESSMENT FOR AGRICULTURAL DEVELOPMENT PLANNING : A CASE STUDY OF KENYA MAKING LAND USE CHOICES FOR DISTRICT PLANNING
Fischer, G W; Antoine , J

AGRO-ECOLOGICAL ASSESSMENT FOR NATIONAL PLANNING : THE EXAMPLE OF KENYA
FAO

AGRO-ECOLOGICAL ZONES PROJECT : RESULTS FOR SOUTHEAST ASIA
FAO

SOIL CHEMISTRY : A BASIC ELEMENTS
Beek, J; Bolt, G H; Bruggenwert, M G; Haan, F A M

CHEMISTRY OF SOIL ORGANIC MATTER
Kumada, K

DROUGHT- RESISTANT SOILS
Benites, J

CYCLES OF SOIL : CARBON ,NITROGEN, PHOSPHORUS,SULFUR,MICRONUTRIENTS
Stevenson, F J; Cole, M A

ECOLOGY AND MANAGEMENT OF SOILBORNE PLANT PATHOGENS : PROCEEDINGS OF SECTION 5 OF THE FOURTH INTERNATIONAL CONGRESS OF PLANT PATHOGENS
Parker, C A; Rovira, A D, Moore, K J; Wong, P T W

LAND RESOURCES INFORMATION SYSTEMS IN ASIA
Fao
.jpg)
WORLD SOIL RESOURCES
Fao

A FRAMEWORK FOR LAND EVALUATION
Fao

SOIL FERTILITY MANAGEMENT IN SUB-SAHARAN AFRICA
UK, WORLD BANK

OPTIMIZING SOIL FERTILITY GRADIENTS IN THE ENSETSYSTEMS OF THE ETHIOPIAN HIGHLANDS
Amede, T; Diro,M

LAND HUSBANDRY-COMPONENTS AND STRATEGY
Roose, E

AGRO-ECOLOGICAL LAND RESOURCES ASSESSMENT FOR AGRICULTURAL DEVELOPMENT PLANNING
Kassam, A H; Van Velthuizen, H T

PREVENTION OF LAND DEGRADATION, ENHANCEMENT OF CARBON SEQUESTRATION AND CONSERVATION OF BIODIVERSITY THROUGH LAND USE CHANGE AND SUSTAINABLE LAND MANAGEMENT WITH A FOCUS ON LATIN AMERICA AND THE CARIBBEAN
FAO

MULTILINGUAL SOIL DATABASE
Fao

GLOBAL AND NATIONAL SOILS AND TERRAIN DIGITAL DATABASES (SOTER)
Fao

Micronutrient assessment at the country level an international study
Sillanpaa,M

POTENTIAL FOR FORAGE LEGUMES ON LAND IN WEST AFRICA
Fao

LAND DEVELOPMENT MANAGEMENT OF ACID SOILS
Latham, M

IMPROVING SOIL MANAGEMENT OPTIONS FOR WOMEN FARMERS IN MALAWI AND ZIMBABWE
Twomlow, S J; Ncube, B

WORLD SOIL RESOURCES
Fao

SOIL CARBON SEQUESTRATION FOR IMPROVED LAND MANAGEMENT
Michel, R

URBAN SOILS
Craul, Philip J

GREEN MANURING FOR SOIL PRODUCTIVITY IMPROVEMENT
Fao

FERTILIZER PHOSPHORUS SORPTION AND RESIDUAL VALUE IN TROPICAL AFRICAN SOILS
Warren, G. P

STATUS OF SULPHUR IN SOILS AND PLANTS OF THIRTY COUNTRIES
Hakan, J

SOIL FERTILITY TESTING SOME EXAMPLES
De Wit, P

SOIL FERTILITY MANAGEMENT IN SUPPORT OF FOOD SECURITY IN SUB SAHARAN AFRICA
Greenland D. J; Nabhan,H

SOIL SAMPLING AND SAMPLE PREPARATION
Pleysier, J. L.

SOIL PRODUCTIVITY ASPECTS OF AGROFORESTRY
Nair, P K R

The Future of Our Land Facing the challenge
Fao

Trees, Soils and food security
Sanchez, Pedro A; Buresh, Roland J; Leakey, Roger R.

INTEGRATING SOILS, SYSTEMS AND SOCIETY STRATEGIC DIRECTIONS FOR TSBF
Tsbf

NITROGEN IN AGRICULTURAL SOILS
Stevenson, Frank J

SOIL CONSERVATION
Hudson, Norman

REDUCING SOIL EVAPORATION WITH TILLAGE AND STRAW MULCHING
Jalota S. K; Prihar S.S

CYCLES OF SOIL
Stevenson, F.J; COLE,M.A

ADVANCES IN INTEGRATED SOIL FERTILITY MANAGEMENT IN SUB-SAHARAN AFRICA CHALLENGES AND OPPORTUNITIES
Bationo A; Waswa B; Kihara J.; Kimetu J.

EROSION IN ANDEAN HILLSIDE FARMING
Reining L.

THE EUROPEAN SOIL INFORMATION SYSTEM
Fao

EFFICIENT SOIL WATER USE THE KEY TO SUSTAINABLE CROP PRODUCTION IN DRY AREAS
VanDuivenbooden, N; Pala, M; Studer, C; Bielders, C L.

PHOSPHORUS REQUIREMENTS FOR SUSTAINABLE AGRICULTURE IN ASIA AND
IRRI

DISTRIBUTION OF SOILS IN PRODUCTION SYSTEMS IN INDIA
Laryea,KB; Bantilan,FT; Moinuddin,M; Pathak,P

MITTEILUNGEN
Benckiser, G; Goswami, N.N; Ottow, J.C. G; Thauer,R.K; Trolldenier, G

THE BIOLOGY AND FERTILITY OF TROPICAL SOILS
Swift, M.J

PEDOGENESIS AND SOIL TAXONOMY
Hall,G.F; Smeck,N.E; WILDING L.P.

PEDOGENESIS AND SOIL TAXONOMY
Wilding, L.P; Smeck, N.E; Hall,G.F

SOIL TESTING AND PLANT ANALYSIS
Westerman, R.L

DESIGNS ON THE LAND
Opio Odongo, J.M.A

NITROGEN MANAGEMENT AND GROUND WATER PROTECTION
Follett,R.F

GUIDELINES FOR QUALITY MANAGEMENT IN SOIL AND PLANT LABORATORIES
Fao

SOILLESS CULTURE FOR HORTICULTURAL CROP PRODUCTION
Brader , L

LAND USE IN THE ANDES ECOLOGY AND AGRICULTURE IN THE MANTARO VALLEY OF PERU WITH SPECIAL REFERENCE TO POTATOES
Mayer , Enrique

SOIL MAP OF THE WORLD
FAO

SOIL SCIENCE SOCIETY OF AMERICA JOURNAL
JURRY, W.A

ASERECA SOIL AND WATER MANAGEMENT RESEARCH NETWORK.
HATIBU; N; MSUMALI, G.P

EIGHTH MEETING OF THE EAST AND SOUTHERN AFRICAN SUB-COMMITTEE FOR SOIL CORRELATION AND LAND EVALUATION.
BANDA, P; MAFOKO, T.D

THE EUROPEAN SOIL INFORMATION SYSTEM.
MEYER, R; FLORIN, R

DEVELOPMENT IN SOIL SCIENCE.
BOLT, G.H; BRUGGENWERT, MG.

NEW CONCEPTS AND APPROACHES TO LAND MANAGEMENT IN THE TROPICS WITH EMPHASIS ON STEEP LANDS.
BARBER, R; BRINKMAN, R

SOIL MANAGEMENT AND CONSERVATION FOR SMALL FARMS.
MARINA, Z; DUDAL, R

AN INTERNATIONAL TECHNICAL WORKSHOP INVESTING IN SUSTAINABLE CROP INTENSIFICATION THE CASE FOR IMPROVING SOIL HEALTH.
SHIVAJI, P

GUIDELINES; LAND EVALUATION FOR EXTENSIVE GRAZING.
CALVERT, G.M; SANDERS, D

AN INTERACTIVE MULTIPLE CRITERIA ANALYSIS TOOL FOR LAND RESOURCES APPRAISAL.
MAKOWSKI, M

AGRO-ECOLOGICAL LAND RESOURCES ASSESSMENT FOR AGRICULTURAL DEVELOPMENT PLANNING.
KASSAM, A.H; SHAH, M.M

A REVIEW OF SOIL AND WATER MANAGEMENT RESEARCH IN SEMI-ARID AREAS OF SOUTHERN AND EASTERN AFRICA.
MORSE,K

DROUGHT RESISTANT SOILS.
ALEXANDRA, B

POST HARVEST MANAGEMENT AND STORAGE OF FOOD LEGUMES.
ODOGOLA, W.R

FERTILISER LEGISLATION
MYLONAS, D.M;

AGRO ECOLOGICAL LAND RESOURCES ASSESSMENT FOR AGRICULTURAL DEVELOPMENT PLANNING, A CASE STUDY OF KENYA TECHNICAL ANNEX 6
KASSAM, H

SOIL FERTILITY MANAGEMENT HANDBOOK FOR EXTENSION STAFF AND FARMERS IN KENYA.
KANYANJUA, S.M; MUREITHI, J.G

CARBON SEQUESTRATION OPTIONS UNDER THE CLEAN DEVELOPMENT MECHANISM TO ADDRESS LAND DEGRADATION.
KEISER, A; MANSURI, B

BLUE GREEN ALGAE FOR RICE PRODUCTION.
HESSE, P.R

AGRO ECOLOGICAL LAND RESOURCES ASSESSMENT FOR AGRICULTURAL DEVELOPMENT PLANNING; A CASE STUDY OF KENYA MAKING LAND USE CHOICES FOR DISTRICTS PLANNING.
FISCHER, G.W; ANTOINE, J

MANAGEMENT OF BIOLOGICAL NITROGEN FIXATION FOR THE DEVELOPMENT OF MORE PRODUCTIVE AND SUSTAINABLE AGRICULTURAL SYSTEMS.
PEOPLES, M.B; LADHA, J.K

INTEGRATING SOILS, SYSTEMS AND SOCIETY STRATEGIC DIRECTIONS FOR TSBF.
TSBF

THE FUTURE OF OUR LAND.
KUTTER, A; NEELY, C.L

A HANDBOOK OF TROPICAL SOIL BIOLOGY SAMPLING AND CHARACTERIZATION OF BELOW GROUND BIODIVERSITY.
HUISING, J; DAVID, E; MOREIRA, M.S

CYCLES OF SOIL.CARBON, NITROGEN, PHOSPHORUS, SULPHUR, MICRONUTRIENTS.
STEVENSON,F.J; COLE, M.A

EXPERIENCES OF FARMER PARTICIPATION IN SOIL FERTILITY RESEARCH IN SOUTHERN ZIMBABWE.
MAVEDZENGE, B.Z; MURIMBARIMBA, F

FARMERS RESPONSES TO SOIL FERTILITY DECLINE IN BANANA BASED CROPPING SYSTEMS OF UGANDA.
BEKUNDA, M

SOIL FERTILITY EVALUATION AND MANAGEMENT BY SMALLHOLDER FARMER COMMUNITIES IN NORTHERN TANZANIA.
JEREMIAS, G; JANSSEN,B

SOIL FERTILITY MANAGEMENT IN SUB SAHARAN AFRICA.
DONOVAN, G

ASSESSMENT OF SOIL NUTRIENT BALANCE APPROACHES AND BALANCE.
ROY, N; MISRA, R.V

EFFECTS OF SOIL SOLARIZATION ON PIGEONPEA AND CHICKPEA.
CHAUHAN, Y.S; JOHANSEN, C

IMPROVEMENT OF SOIL FERTILITY AND WEED SUPPRESSION THROUGH LEGUME BASED TECHNOLOGIES.
OYOTUNDE, O; KEHINDE, J

SOIL SAMPLING AND SAMPLE PREPARATION.
PLEYSIER, J

SOIL SOLARIZATION.
DEVAY, J; STAPLETON, J

REPORT ON THE AGRO ECOLOGICAL ZONES PROJECT.
DUDAL, R

WORLD SOIL CHARTER.
SAOUMA, E

COMPUTERIZED SYSTEMS OF LAND RESOURCES APPRAISAL FOR AGRICULTURAL DEVELOPMENT.
CHIDLEY, T.R; ANTOINE, J

AEZ IN ASIA; PROCEEDING OF THE REGIONAL WORKSHOP ON AGRO-ECOLOGICAL ZONES METHODOLOGY AND APPLICATIONS.
KASSAM, A.H

AGRO ECOLOGICAL ASSESSMENTS FOR NATIONAL PLANNING; THE EXAMPLE OF KENYA.
BRINKMAN, R

FOURTH MEETING OF THE WEST AFRICAN SUB COMMITTEE FOR SOIL CORRELATION AND LAND EVALUATION.
GEOSAY, S; ADU, S.V

METHODS OF SOIL ANALYSIS.
KLUTE, A

ALTERNATIVES TO SLASH AND BURN AGRICULTURE.
HOUTEN, H; SANCHEZ, P

LAND RESOURCES INFORMATION SYSTEMS IN THE CARIBBEAN.
BRINKMAN, R

PARTICIPATORY DIAGNOSIS OF SOIL NUTRIENT DEPLETION IN SEMI ARID AREAS OF KENYA.
GACHIMBI, L.N ; THURANIRA, E.G

PREVENTION OF LAND DEGRADATION, ENHANCEMENT OF CARBON SEQUESTRATION AND CONSERVATION OF BIODIVERSITY THROUGH LAND USE CHANGE AND SUSTAINABLE LAND MANAGEMENT WITH A FOCUS ON LATIN AMERICA AND THE CARIBBEAN.
BRUNET, M

AGRO-CLIMATIC AND AGRO-EDAPHIC SUITABILITIES FOR BARLEY, OAT,COWPEA, GREEN GRAM AND PIGEONPEA.
KASSAM, A.H; FISCHER, G.W

POTENTIAL FOR FORAGE LEGUMES ON LAND IN WEST AFRICA.
BRINKMAN, R

GLOBAL AND NATIONAL SOILS AND TERRAIN DIGITAL DATABASES.
COOTE, D.R; SHIELDS, J

FAO-ISRIC SOIL DATABASE
CARACALLA, T

IMPROVING SOIL MANAGEMENT OPTIONS FOR WOMEN FARMERS IN MALAWI AND ZIMBABWE.
TWOMLOW, S.J; BONGANI, N
.jpg)
REGIONAL SOIL CONSERVATION PROJECT FOR AFRICA, PHASE 1
FAO

SOIL MAP OF THE WORLD.
FAO

FAO FERTILIZER PROGRAMME.
TILLMANN, K.H

TREES, SOILS, AND FOOD SECURITY.
SANCHEZ, P; LEAKEY, R.B

ECOLOGY AND MANAGEMENT OF SOILBORNE PLANT PATHOGENS.
PARKER, C.A; ROVIRA, A.D

DISTRIBUTION OF SOILS IN PRODUCTION SYSTEMS IN INDIA.
LAYEA, K.B; BANTILAN, F.T

AGRO-ECOLOGICAL LAND RESOURCES ASSESSMENT FOR AGRICULTURAL DEVELOPMENT PLANNING; A CASE STUDY OF KENYA RESOURCES DATA BASE AND LAND PRODUCTIVITY MAIN REPORT.
KASSAM, A.H; VELTHUIZEN, HT

SOIL WATER BALANCE IN THE SUDANO SAHELIAN ZONE.
SIKAKUMAR, M.V; RENARD, C

HANDBOOK FOR INTEGRATED SOIL FERTILITY MANAGEMENT.
FAIRHURST, T

PARTICIPATORY SOIL AND LAND MANAGEMENT IN UGANDA.
TENYWA, M; BEKUNDA, A.M

SOIL PROPERTIES, CRUSTING AND SEEDLING EMERGENCE.
SINCLAIR, J

REVISED CLASSIFICATION OF THE SOILS OF BELIVE.
BAILLIE, I.C; HOLDER, M.A

LIVESTOCK SYSTEMS RESEARCH PROGRAMME NARO
OPIO, F

MEDIA FORUM FOR AGRICULTURE; PRELIMINARY MEETING.
JOHN, D

TROPICAL PRODUCTS INSTITUTE CONFERENCE PROCEEDINGS.
NESTEL, B.L; ALIM, K.A

LIQUID CALIBRATION HANDBOOK.
CORNELIUS, W.K

THE GUY SMITH INTERVIEWS; RATIONALE FOR CONCEPTS IN SOIL TAXONOMY.
FORBES, T.R

LAND USE IN THE ANDES; ECOLOGY AND AGRICULTURE IN THE MANTARO VALLEY OF PERU WITH SPECIAL REFERENCE TO POTATOES.
MEYER, A

GUIDELINES FOR QUALITY MANAGEMENT IN SOIL AND PLANT LABORATORIES.
REEUWIJK, L.P

MULTILINGUAL SOIL DATABASE.
MORENO, J.A; MAYOL, F

A FRAMEWORK FOR LAND EVALUATION.
BEEK, J.K; BENNEMA, J

GREEN MANURING FOR SOIL PRODUCTIVITY IMPROVEMENT.
MEELU, O.P;

MICRONUTRIENT ASSESSMENT AT THE COUNTRY LEVEL; AN INTERNATIONAL STUDY.
SILLANPAA, M

WORLD SOIL RESOURCES AN EXPLANATORY NOTE ON THE FAO WORLD SOIL RESOURCE MAP.
SCHOMAKER, H.W

LAND RESOURCES INFORMATION SYSTEM IN ASIA.
BRINKMAN, R

MANAGING FRAGILE SOILS; A CASE STUDY FROM NORTH WOLLO, ETHIOPIA.
EYASU,E; FANTAYE, D

SOIL FERTILITY TESTING SOME EXAMPLES.
WIT, P
.jpg)
FERTILIZER PHOSPHORUS SORPTION AND RESIDUAL VALUE IN TROPICAL AFRICAN SOILS.
WARREN, G.P

POTENTIAL ROLE IN RURAL DEVELOPMENT.
LULANDALA, L.L.L; HALL, J.B

VANISHING LAND AND WATER SOIL AND WATER CONSERVATION IN DRY LAND.
HUGUES, D; JEAN, L.C

SOIL NUTRIENT BUDGES AND BALANCES; WHAT USE FOR POLICY.
SOONES, I; CAMILA, T

FARMERS KNOWLEDGE OF SOIL FERTILITY AND LOCAL MANAGEMENT STRATEGIES IN TIGRAY, ETHIOPIA.
CORBEELS, M; SHIFERAW, A

IMPROVING THE MANAGEMENT OF MANURE IN ZIMBABWE.
JEAN, K.N; MURWIRA, H.K

ICRAF STRATEGY TO THE YEAR 2000.
CHATER, S

PROTECT AND PRODUCE SOIL CONSERVATION FOR DEVELOPMENT.
SAOUMA, E

USE OF GRADED CONTOUR BANKS FOR SOIL CONSERVATION.
COUPER,D

SOIL EROSION AND CONSERVATION IN THE TROPICS.
KUSSOW, W; SWAIFY,S.A
.jpg)
REGIONAL SOIL CONSERVATION PROJECT FOR AFRICA, PHASE 1; SUMMARY OF COUNTRY STUDIES.
FAO

LAND DEVELOPMENT MANAGEMENT OF ACID SOILS
LATHAM, M

ADVANCES IN INTEGRATED SOIL FERTILITY MANAGEMENT IN SUB-SAHARAN AFRICA; CHALLENGES AND OPPORTUNITIES.
BATIONO, A; WASWA, B

REDUCING SOIL WATER EVAPORATION WITH TILLAGE AND STRAW MULCHING.
JALOTA, S.K; PRIHAR, S.S

SOIL CARBON SEQUESTRATION FOR IMPROVED LAND MANAGEMENT.
MICHEAL, R

IMPROVING SOIL MANAGEMENT OPTIONS FOR WOMEN FARMERS IN MALAWI AND ZIMBABWE.
BONGANI, N

THE BIOLOGY AND FERTILITY OF TROPICAL SOILS.
SWIFT, M.J

URBAN SOILS APPLICATION AND PRACTICES.
CRAUL, P.J

SOIL SAMPLING AND SAMPLE PREPARATION.
PLEYSIER, J
.jpg)
PEDOGENESIS AND SOIL TAXANOMY.
SMITH, G.D

EFFICIENT SOIL WATER USE; THE KEY TO SUSTAINABLE CROP PRODUCTION IN DRY AREAS.
BIELDERS, C.L; STUDER, C

NITROGEN MANAGEMENT AND GROUND WATER PROTECTION.
FOLLET, R.F

LAND HUSBANDRY COMPONENTS AND STRATEGY.
ROOSE, E

OPTIMIZING SOIL FERTILITY GRADIENTS IN THE ENSET SYSTEMS OF THE ETHIOPIAN HIGHLANDS.
AMEDE, T; MULEGETA,D

SOIL FERTILITY MANAGEMENT IN SUB SAHARAN AFRICA.
FOSU, Y.K
.jpg)
FERTILIZER PHOSPHORUS SORPTION AND RESIDUAL VALUE IN TROPICAL AFRICAN SOILS.
WARREN, G.P

SOILLESS CULTURE FOR HORTICULTURAL CROP PRODUCTION.
BRADER, L

SOIL FERTILITY MANAGEMENT IN SUPPORT OF FOOD SECURITY IN SUB SAHARAN AFRICA.
GREENLAND, D.J; NABHAN, H

STATUS OF SULPHUR IN SOILS AND PLANTS OF THIRTY COUNTRIES.
HAKAN, J

INTERNATIONAL WORKSHOP ON DENITRIFICATION SOIL, RHIZOSPHERE AND AQUIFER.
BENCKISER, G; GIESSEN, F; HANNOVER, F

TOWARDS INTEGRATED SOIL FERTILITY MANAGEMENT IN MALAWI; INCORPORATING PARTICIPATORY APPROACHES IN AGRICULTURAL RESEARCH.
KANYAMA, G; SNAPP, S

IMPROVEMENT OF SOIL FERTILITY AND WEED SUPPRESSION THROUGH LEGUME BASED TECHNOLOGIES.
AYOTUNDE, O; JADU, N

USE OF GRADED CONTOUR BANKS FOR SOIL CONSERVATION.
COUPER, D

EFFECTS OF FOREST CHARACTERISTICS ON WILD TURKEY HABITAT USE IN THE OUACHITA MOUNTAINS.
BENTY, W; SWEENEY, M

DESIGNS ON THE LAND.
ODONGO, J.M

PHOSPHORUS REQUIREMENTS FOR SUSTAINABLE AGRICULTURE IN ASIA AND OCEANIA.
STANGEL, P.J; DESAI, G.M

MAAIF, NAADS FARMERS INSTITUTIONS DEVELOPMENT TRAINING MANUAL.
MUGASI, S

YAYEP NUTRIENT MANAGEMENT GUIDE FOR MAIZE, COTTON, COFFEE, AND BANANA.
IFDC

CHEMISTRY IN THE SOIL ENVIRONMENT.
DOWDY, R.H; BAKER, D.E

SOIL FERTILITY MANAGEMENT IN ITS SOCIAL CONTEXT; A STUDY OF LOCAL PERCEPTIONS AND PRACTICES IN WOLAITA, SOUTHERN ETHIOPIA.
HIGGINS, E

THE SUSTAINABLE MANAGEMENT OF TROPICAL CATCHMENTS.
HARPER, D; BROWN, T

SOIL CONSERVATION.
HUDSON, N

SOIL TESTING AND PLANT ANALYSIS.
WESTERMAN, R.L; FIXEN, P.E
.jpg)
PEDOGENESIS AND SOIL TAXONOMY DEVELOPMENT IN SOIL SCIENCE.
WILDING, L.P; SMECK, N.E

SEEDS AND SEEDLINGS OF WEEDS IN RICE IN SOUTH AND SOUTH EAST ASIA.
ZIMDAHI, R; LUBIGAN, T.R

PEST CONTROL FARMERS HANDBOOK.
GREENSLADE, R.M

KAMPALA LAND BONZANA.
ATUHAIRE, A, MUKIIBI, S.E

DEVELOPING NEW APPROACHES TO GLOBAL STOCK STATUS ASSESSMENT AND FISHERY PRODUCTION POTENTIAL OF THE SEAS,
ROSENBERG, A.A;

VETIVER GRASS; A THIN GREEN LINE AGAINST EROSION.
DAFFORN, M.R

VETIVER GRASS; TECHNICAL INFORMATION PACKAGE VOLUME 2.
YOON, P.K

LAND AND CROP MANAGEMENT IN THE HILLY TERRANS OF CENTRAL AMERICA.
BARBER, R

WEED FLORA SOIL PROPERTIES IN SUBHUMID TROPICAL AFRICA.
WORTMAN, C.S; UGEN, M.A

GUIDELINES FOR IMPACT MONITORING WORK BOOK.
STEINER, K; HERWEG, K

SCUAF SOIL CHANGES UNDER AGROFORESTRY.
MURAYA, P; YOUNG, A

INTEGRATION OF SOIL RESEARCH ACTIVITIES IN EASTERN AND SOUTHERN AFRICA.
BATIONO, A; PALM, C

EFFECT OF ACCESS TO MARKET OF AGRICULTURAL COMMODITIES ON SOIL AND WATER CONSERVATION INVESTMENT IN SEBEI SUB REGION.
GIDOI, R

PRODUCT YIELD AND RECOVERY OF AN ARKANSAS HARDWOOD SAWMILL.
HARDING, V.O; KLUENDER, R.A

GENERAL AGRICULTURE AND SOILS.
ADUAYI, E.A; EKONG, EE

PROTECTING WORLD CROPS.
RACUMIN, M

A SOIL LABORATORY FIELD.
GIBSON, W.P

MANAGEMENT OF AFLATOXINS IN GROUND NUTS.
OKELLO, D.K; BISIKWA, J

SOIL TAXONOMY.
GROSSMAN, R.B; RUST, R.H

MANAGING THE WORLDS FOREST.
NARENDRA, P.S

WATERSHED DEVELOPMENT IN ASIA; STRATEGIES AND TECHNOLOGY.
DOOLETTE, J.B; MAGRATH,B

SOIL MICROMORPHOLOGY AND SOIL CLASSIFICATION.
THOMPSON, L.M; LOWELL, A

VETIVER GRASS FOR SOIL AND WATER CONSERVATION, LAND REHABILITATION, AND EMBANKMENT STABILIZATION.
GRIMSHAW, G; LARISA, H

MEASURING SOIL PROCESSES IN AGRICULTURAL RESEARCH.
LARYEA, K.B; PATHAK,P

ISNAR BRIEFING PAPER 2001-2004.
PETERSON, W; GALLENO, V

SOIL FERTILITY REPLENISHMENT IN AFRICA; A CONCEPT NOTE.
ISABEL, V; PIERI, C

SOIL DEGRADATION A THREAT TO DEVELOPING COUNTRY FOOD SECURITY BY 2020.
SCHERR, J.S

IS SOIL FERTILITY DECLINING? PERSPECTIVES ON ENVIRONMENTAL CHANGE IN SOUTHERN ETHIOPIA.
EYASU, E

BIOLOGICAL INTERACTIONS IN SOIL.
ANDERSON, J.M

HANDBOOK FOR INTEGRATED SOIL FERTILITY MANAGEMENT.
FAIRHUST, T

PROGRAM AUTOMATED LIBRARY AND INFORMATION SYSTEMS.
TEDD, L.A

CHARACTERIZATION OF THE EFFECTS OF CLIMATE VARIATION ON LAND SURFACE TEMPERATURE AND SOIL MOISTURE THROUGH STOCHASTIC ANALYSIS OF LONG TERM SSM/I OBSERVATIONS OVER THE TIBETAN PLATEAU.
OFWONO, M

IMPROVING SOIL MANAGEMENT OPTIONS FOR WOMEN IN MALAWI
TWOMLOW, J

REDUCING SOIL WATER EVAPORATION WITH TILLAGE AND STRAW MULCHING
JALOTA, S.K

NUTRIENT MANAGEMENT GUIDE FOR MAIZE, COTTON, COFFEE AND BANANA.
FAO

STATUS OF SULPHUR IN SOILS AND PLANTS OF THIRTY COUNTRIES.
JANSSON, H

UGANDA SOIL FERTILITY INITIATIVE CONCEPT PAPER.
MUCHENA, M; SSALI, H

AGRO-ECOLOGICAL LAND RESOURCES ASSESSMENT FOR AGRICULTURAL DEVELOPMENT PLANNING A CASE STUDY OF KENYA TECHNICAL ANNEX 1
KASSAM, A.H; SHAH, M.M

AGRO-ECOLOGICAL LAND RESOURCES ASSESSMENT FOR AGRICULTURAL DEVELOPMENT PLANNING,TECHNICAL ANNEX 2.
KASSAM, A.H; MITCHELL, A.J

LAND REFORM LAND SETTLEMENT AND COOPERATIVE 2002.
GROPPO, P

PARTICIPATORY DRYLAND AGRICULTURAL RESEARCH EAST OF MOUNT KENYA
KANGARA, J.N; GETHI, M

STATUS OF CADMIUM, LEAD, COBALT AND SELENIUM IN SOILS AND PLANTS OF THIRTY COUNTRIES.
JANSON, H

AGRO ECOLOGICAL LAND RESOURCES ASSESSMENT FOR AGRICULTURAL DEVELOPMENT PLANNING; A CASE STUDY OF KENYA TECHNICAL ANNEX 3
KASSAM, A.H

PROCEEDING OF THE SEMINAR TO IDENTIFY PRIORITIES FOR FISHERIES MANAGEMENT AND DEVELOPMENT IN THE SOUTHWEST INDIAN OCEAN.
ARDILL, J.D; SANDERS, M.J

AGRO ECOLOGICAL LAND RESOURCES ASSESSMENT FOR AGRICULTURAL DEVELOPMENT PLANNING TECHNICAL ANNEX 4.
KASSAM, H

LAND REFORM ; LAND SETTLEMENT AND COOPERATIVE.
FAURE, P

SOIL CARBON SEQUESTRATION FOR IMPROVED LAND MANAGEMENT.
MICHEL, R

SOIL FERTILITY INITIATIVE FOR SUB-SAHARAN AFRICA.
OKWELE, R; OFORI, F

AEZWIN AN INTERACTIVE MULTIPLE CRITERIA ANALYSIS TOOL FOR LAND RESOURCES APPRAISAL.
MAKOWSKI, J

AGRO ECOLOGICAL LAND RESOURCES ASSESSMENT FOR AGRICULTURAL DEVELOPMENT PLANNING A CASE STUDY OF KENYA, TECHNICAL ANNEX 5
SHAH, M

SOIL RESOURCES OF UGANDA AND THEIR RELATIONSHIP TO MAJOR FARMING SYSTEMS.
SSALI, H

WORLD WATER WEEK.
KATARINA, A

NINTH MEETING OF THE EAST AND SOUTHERN AFRICAN SUB COMMITTEE FOR SOIL CORRELATION AND LAND EVALUATION.
MUGOGO, S.W; MWAGO, M.C

LAND ACCESS IN RURAL AFRICA; STRATEGIES TO FIGHT GENDER INEQUALITY.
MARCELA, V

EFFECT OF LIMESTONE AND MAGNESIUM ON BAHIAGRASS YIELD, QUALITY, NUTRIENT CONCENTRATION AND UPTAKE AND SOIL TEST LEVELS.
PHILLIPS, J.M; SNYDER, C.S
.jpg)
REGIONAL SOIL CONSERVATION PROJECT FOR AFRICA, PHASE 1
FAO

CHEMISTRY OF SOIL ORGANIC MATTER.
BOLT, D; ZACHAR, D

EROSION IN ANDEAN HILLSIDE FARMING.
REINING, L

STUDY OF SOIL VARIABILITY AS A BASIS FOR PROPER SOIL RESOURCE MANAGEMENT . A CASE STUDY OF THE TERTIARY IN AMPOE MAE TAENG DISTRICT, THAILAND.
ISABIRYE, M

ECOTRUST BUILDING VIABLE STRATEGIC PARTNERSHIP IN CONSERVATION AND IMPROVED LIVELIHOODS.
TUKAHIRWA, M.J

PARTICIPATORY RURAL APPRAISALS OF THE FARMING SYSTEMS OF EASTERN KENYA, 1998
MICHENI, A; KARIULI, I.W; GETH , M

NATURE AND CAUSES OF LAND DEGRADATION IN THE OROMIYA REGION; A REVIEW.
BEZUAYEHU, T; GEZAHEGN, A

NATURE AND CAUSES OF LAND DEGRADATION IN THE OROMIYA REGION; A REVIEW.
BEUAYEHU, T; GAZAHEGN, A; JABBAR, M.A

LAND TENURE OPENING UP FAIRER ACCESS.
AGNES, M; PEDRICK, C

IRRIGATION WATER MANAGEMENT; DRAINAGE OF IRRIGATED LANDS.
RITZEMA, H.P; CHANDUVI, F

VETIVER GRASS FOR SOIL AND WATER CONSERVATION, LAND REHABILITATION AND EMBANKMENT STABILIZATION.
GRIMSHAW, G; RICHARD, G; HELFER, L

EROSION CONTROL IN THE TROPICS.
KUYPERS, H; MOLLEMA, A
Technical Services

REGIONAL INTEGRATION; A MAJOR INGREDIENT OF FOOD SECURITY.
NGWENYA, S

ACP STOCK EXCHANGES RIDING THE STORM.
GOUTIER, H

BIOGAS SEPTIC TANK
LOMWATS

LIBRARY RESEARCH AND INFORMATION CENTRE ACCESSIONS LIST.
ENGITHU, S

RESPONSIBLE FISH TRADE.
FAO

CAB INTERNATIONAL STRATEGIC PLAN 2002-2006
RANGI,D

NARO TECHNOLOGY AND TRANSFER EXHIBITION.
NASASIRA, J

PARTERNSHIP FOR THE PARTICIPATORY POVERTY ASSESSMENT PROCESS.
EHRHART, C; TUMUSIIME, P

SUSTAINABLE FOOD SECURITY FOR ALL BY 2020; PROCEEDINGS OF AN INTERNATIONAL CONFERENCE SEPTEMBER 4-6, 2001 BONN, GERMANY
KARANJA, M; BEZANSON, K

REDUCING POVERTY THROUGH CUTTING EDGE SCIENCE; STUDY OF CGIAR COMMITMENTS IN LATIN AMERICA AND THE CARIBBEAN,
SEREGELDIN,I

THE BUENOS AIRES PLAN OF ACTION FOR PROMOTING AND IMPLEMENTING TECHNICAL COOPERATION AMONG DEVELOPING COUNTRIES,
UNDP
Theses

LABORATORY AND FIELD EVALUATION OF ENTOMOPATHOGENIC FUNGI, METARHIZIUM ANISOPLIAE AND BEAUVERIA BASSIANA, FOR MANAGEMENT OF THE LEGUME POD BORER, MARUCA VITRATA.
VENANSIO, T

GENETIC OF RESISTANCE TO POD SHATTERING IN SOYBEAN.
TUKAMUHABWA, P

GENETIC STUDIES ON HEAD ARCHITECTURE, ADAPTATION AND BLAST RESISTANCE OF FINGER MILLET IN UGANDA.
OWERE, L

TRENDS IN RHIZOBIA POPULATIONS AND CROP YIELDS UNDER CONTINUOUS AND ROTATIONAL SYSTEMS FOLLOWING LEGUME INOCULATION.
UZATUNGA, I

PRODUCTIVITY OF LABLAB PURPUREUS(L. SWEET) CV. RONGAI AND ITS FEEDING VALUE AS A SUPPLEMENT FOR LACTATING DAIRY COW.
KABIRIZI, M.L

FARM HOUSEHOLD LAND USE DECISIONS IN KIGEZI HIGHLANDS, SW UGANDA.
BAMWERINDE, B.M

ADJUSTMENTS IN FISH STOCKS AND IN LIFE HISTORY CHARACTERISTICS OF THE NILE PERCH, LATES NILOTICUS L. IN LAKES VICTORIA, KYOGA AND NABUGABO.
OHWAYO, R.O

CHARACTERIZATION OF ENTOMOPATHOGENIC FUNGI AND EVALUATION OF DELIVERY SYSTEMS OF BEAUVERIA BASSIANA FOR THE BIOLOGICAL CONTROL OF THE BANANA WEEVIL, COSMOPOLITES SORDIDUS.
NANKINGA, C.M

DEVELOPMENT OF A NUTRITIONAL PROFILING SYSTEM FOR FREE-RANGING LIVESTOCK IN MAJOR AGRO-ECOLOGICAL ZONES OF SUB-SAHARAN AFRICA.
OSSIYA, S

CHARACTERIZATION OF UGANDAN SWEETPOTATO GENETIC POTENTIAL USING MORPHO-AGRONOMIC AND MOLECULAR APPROACHES.
BENARD, Y

VARIATION IN COMPATIBILITY OF PERENNIAL RYE GRASS CULTIVARS WITH WHITE CLOVER.
MUSOKE, F.S

DISSEMINATION OF CASSAVA BACTERIAL BLIGHT (CBB).
OTIM, G

CASSAVA LEAF, SWEET POTATO VINES LABLAB AND SUNFLOWER MEAL AS PROTEIN SUPPLEMENTS TO MEAT GOATS FED GUINEA GRASS HAY AND MAIZE BRAN.
WALUSIMBI, H.K

THE IDENTIFICATION AND CHARACTERIZATION OF RESISTANCE IN MUSA TO FUSARIUM OXYSPORIUM F.SP CUBENSE RACE 1.
SSALI, R.T

SAVINGS AND CREDIT COOPERATIVES (SACCO) AND HOUSEHOLD SAVINGS BEHAVIOUR IN UGANDA.
MPIIRA, S

ISOLATION AND CHARACTERISATION OF YEASTS ASSOCIATED WITH FRUITS, GRAINS AND BEVERAGES IN UGANDA.
KIWANUKA, CK

EFFICIENCY OF A SYSTEMATIC INSECTICIDE TO PREVENT APHID INFESTATION AND INFECTION OF APHID-BORNE VIRUSES IN POTATO.
KAKUHENZIRE, M.R

COOPERATIVE MEMBERS CREDIT SCHEME OF THE NATIONAL FUND FOR RURAL DEVELOPMENT FONADER PRELIMINARY GUIDE.
AFRACA

STUDIES ON PRIMARY TILLAGE IMPLEMENTS AND SYSTEMS USED FOR DROUGHT ANIMAL CULTIVATION FEATURING UGANDA SITUATION.
WANGE, J

THE EFFECT OF RATE AND TIME APPLICATION OF NITROGEN FERTILIZER ON GROWTH AND YIELD OF SUGAR CANE ON TWO SOIL TYPES IN TRINAD.
MUNDAKA, W

GENERATION, ADOPTION AND IMPACT OF DIFFUSED LIGHT POTATO STORAGE TECHNOLOGY IN BADULLA DISTRICT, SRI LANKA.
SOMARATNE, S.M

AN IMPROVED AGROBACTERIUM MEDIATED TRANSFORMATION METHOD FOR BANANA AND PLANTAIN
ARINAITWE, G